[精编]英文采购合同.doc

上传人:啊飒飒 文档编号:11122636 上传时间:2021-07-03 格式:DOC 页数:5 大小:28.50KB
返回 下载 相关 举报
[精编]英文采购合同.doc_第1页
第1页 / 共5页
[精编]英文采购合同.doc_第2页
第2页 / 共5页
[精编]英文采购合同.doc_第3页
第3页 / 共5页
[精编]英文采购合同.doc_第4页
第4页 / 共5页
[精编]英文采购合同.doc_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《[精编]英文采购合同.doc》由会员分享,可在线阅读,更多相关《[精编]英文采购合同.doc(5页珍藏版)》请在三一文库上搜索。

1、此资料由网络收集而来,如有侵权请告知上传者立即删除。资料共分享,我们负责传递知识。英文采购合同Contract No.:XXXSales and Purchase ContractFORManganese OreThis contract is made and entered into onXX, Feb2019under terms and conditions as per the international chamber of commerce-600 (ICC UCP-600/2019 revision) by and between:The Buyer:Address:Tel:T

2、he Seller :Address:Tel:Whereby seller agrees to sell to buyer and Buyer agrees to buy from seller Manganese Ore under following the terms and conditions stipulated below:Article 1 CommodityConcentrated manganese OreArticle 2 SpecificationsConcentrated Manganese OreSize: 0-5mm (90% min)% Mn min. 40.0

3、% Fe max. 15.0% Silica ( SiO2 ) max. 1.0% Aluminum ( Al ) max. 4.0% S max. 0.20% P max. 0.10%Moisture max. 7%Article 3 Quantity:500 MT, partial shipment not allowed.Article 4 Origin and Port of loading4.1 Republic of ABC4.2 Loading port:Article 5 Packing/Delivery5.1 In50 kg sack5.2 Incontainer Shipm

4、ent, more or less 20 tons.Article 6 Shipment/Delivery6.1 500MT(+/-5%)partial shipment not allowed6.2 Shipment will be 90 days after signing of this contract and after the acceptance of the Letter of Credit by sellers bank. L/C will be openedafter BuyerreceivingProforma Invoice from Sellerwith confir

5、mation of the delivery schedule.6.3 The Buyer has the right to appoint the independent surveyor or his representative to conduct the Pre-shipment Inspection and/or conduct the joint-inspection of the material with buyer for his own account.Article 7 Contracted Price and ValuesPrice:Mn: 48% and above

6、 - USD0.00/%/DMTCFRCY Port, China40% - 47.9% - USD 0.00 /%/DMTCFRCY Port, ChinaThe Mn content will be average of the joint-inspection testing result at loading port.Article 8 Payment8.1 Payment shall be effected in full by an irrevocable Letter of Credit, which will be opened by 1stclass bank in Hon

7、g Kong or Singapore, 100% at sight upon presentation of shipping documents.A. Sellers Banking Details:Bank Name : Bank Address : Account Name : S.W.I.F.T. CODE SWIFT :B. Buyers bank issues L/C to the Sellers bank via S.W.I.F.T. wire transfer.Buyers Banking Details:Bank Name : (will be advised)Bank A

8、ddress : Account Name: S.W.I.F.T. Address SWIFT : Article 10 Inspection of Analysis & WeightThe shipmentinspection and analysis shall be done byCCICappointed by the Seller and one independent surveyor (i.e.: SGS or Geo-Chem, etc) appointed by the buyeras agreed by both parties at site before loading

9、 to container. While final weightand qualitydetermination shall be done atloadingportby the above joint-survey.Moisture content shall be deducted from the total weight shipped.Article 11 DocumentsSeller shall present the following documents to the buyer:A. Signed Commercial Invoice for 100% of the t

10、otal cargo value indicating, quantity, unit price and the total Amount of Value of the delivered commodity , 1 original and 3 copies.B. Certificates of quantity, quality and weight issued byCCICand one independent surveyor appointed by the buyer.C. Certificate of Origin issued by ABC Department Of T

11、rade or concerned Government authorities, I original and 2 copies.D. Weight List, showing total weight , 1 original and 3 copies.E. Bill of Lading, 3 original copies and 3 non-negotiable copies.Article 12 Force MajeureThe Seller shall not be responsible for the delay of shipment or non-delivery of t

12、he goods due to Force Majeureunder UCP 600. The seller shall advise the buyer immediately of the occurrence mentioned above and within 3 days thereafter the seller shall send a notice by courier to the buyer of their acceptance of a certificate of the accident issued by the local chamber of commerce

13、 under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the seller , however, are still under obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than 60 days the buyer shall have the right to cancel t

14、he Contract.Article 13 ArbitrationAll disputes arising out of or in connection with this Contract shall be finally resolved by arbitration in accordance with the Rules of Arbitration of the International Chamber of Commerce (UCP-600/2019 or Uniform Customs and Practice for Documentary Credits) by one or more arbitrators appointed in accordance with the said rules. The arbitration shall be conducted in ABCbythe English language.Buyer Seller(Authorized signature/seal) (Authorized signature/seal)5

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 科普知识


经营许可证编号:宁ICP备18001539号-1