行政助理英文求职简历模板.doc

上传人:音乐台 文档编号:1202068 上传时间:2018-12-10 格式:DOC 页数:17 大小:42KB
返回 下载 相关 举报
行政助理英文求职简历模板.doc_第1页
第1页 / 共17页
行政助理英文求职简历模板.doc_第2页
第2页 / 共17页
行政助理英文求职简历模板.doc_第3页
第3页 / 共17页
亲,该文档总共17页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《行政助理英文求职简历模板.doc》由会员分享,可在线阅读,更多相关《行政助理英文求职简历模板.doc(17页珍藏版)》请在三一文库上搜索。

1、-范文最新推荐- 行政助理英文求职简历模板 9/88-Present THE LAPIS CORPORATION,Pinesville,LA Personnel Administrative Assistant Maintained filles. Prepared records for off-site storage.Designed forms for archives.Developed effective space management plan for on-site records.Improved tracking system resulting in few lost

2、files. Handled employment verifications and designed forms to expedite process. 12/84-8/88 GLADE GROVE COLLEGE,Baton Rouge,LA Records Coordinator for Development Name: Happy Nationality: China (Mainland) Current Place: Guangzhou Height/Weight: 170 cm76 kg Marital Status: Single Age: 32 years Career

3、Objective Application type: Jobseeker Preferred job title: Purchasing manager/supervisor: Purchasing Supervisor 、 others: 、 others: Working life: 9 Title: No title Job type: Full time Expected Start date: In three days Expected salary: ¥5,000-¥8,000 Preferred working place: Guangzhou Foshan Dongguan

4、 Work experience Companys name: Enterprise nature: Soly foreign funded enterprisesIndustry: Mechnical & elecrical equipment/electrical power/power Job Title: Purchasing Supervisor Job description: 1.Ensure materials delevery on time.2.Meet companys inventory target and ensure companys cost targe

5、t.3.Suppliers management.4.Be responsible for monitoring environmental elements of materials. Reasons for leaving: Company relocation Companys name: Guangzhou Anda Bearing Co., Ltd.Begin and end date: 2002-09-2004-11 Enterprise nature: Private enterprisesIndustry: Machine building & equipment Jo

6、b Title: Purchasing Supervisor Job description: l.Arranged day-to-day work to staff members in our department and assessed theirs achievements.2.Maintain smooth operation of assembly line.3.Develop new suppliers and negotiation purchasing contracts and raw materiel price.4.Suppier election , evaluat

7、ion and audit.5.Maintain good relationship with corporation partners.6.Ensure companys cost target. Reasons for leaving: To seek better development Companys name: Guangzhou Junxing Auto Parts Co., Ltd.Begin and end date: 2000-08-2002-08 Enterprise nature: Industry: Job Title: Buyer/Purchasing Specia

8、list/ Job description: 1.Be responsible for monitoring raw materials & indrect material sourcing plan.2.Meet companys inventory target.3.Closely monitor order status to ensure on-time product delivery.4.Ensure all orders from commercial team are timely and accurately placed.5.Identify and assess

9、 new suppliers.6.Establish supplier contract and monitor performance of contracts. Reasons for leaving: To seek better development Educational Background Name of School: Changan University Highest Degree: Bachelor Date of Graduation: 2000-07-01 Name of Major 1: Automobil engineering Name of Major 2:

10、 Education experience: Start date End date Education organization Majors Certificate Certificate No 1996-09 2000-07 Changan University Automobil engneering Diploma Language Ability Foreign Language: English Level: good Chinese level: good Cantonese Level: average Relevant skills and abilities 9 year

11、s experiences of PCM. Self-recommendation letter Aggressive, independent and be able to work under a dynamic environment . Have coordination skills, teamwork spirit. Studious nature and dedication are my greatest strengths. DANIEL ZHENG Email: *Add: Suzhou SIP, Jiangsu, China OBJECTIVE: General Mana

12、ger or equivalent position in China.SUMMARY OF QUALIFICATIONS:- Excellent personality with strong leadership. - Strong communication, interpersonal and people management skills.- Highly motivated and result-oriented professional with expertise in Lean manufacturing operations.- Strong skills in impl

13、ementing goals, driving activities and solving problems.- Proficient both in Chinese and English.PROFESSIONAL EXPERIENCE:Datacolor Technology (Suzhou) Co., Ltd., Suzhou, China. (2004 – 2006)General Manager- Developed and restructured the organization, setup manufacturing facility and used all

14、resources effectively.- Managed and directed department of production, quality, engineering, purchasing, finance, HR and logistics.- Fully responsible for local operation and performance, developed and submitted plans and goals periodically. - Led a group of highly motivated managers to define and e

15、xecute plans to meet goals within financial constrains.- Implemented company policies and guidelines, advocated good spirit and team work.- Developed cost effective and highly qualified local suppliers and achieved net 45% COGS against original US costs.- Cooperated headquarter to smoothly transfer

16、products and technology from US to China.- Successfully launched transferred products in Suzhou, exceed requirements in speed, quality and cost.- Maintained high standard quality requirements for products, led and drove the implementation of ISO9001 system.- Conducted management review periodically

17、and generated action plans in all levels to secure more effective operations. - Drove the continuous improvement of production efficiency and cost reduction projects.- Developed annual budget plans and successfully managed headcounts and expenses under the budget.- Built up effective logistics team

18、to minimize inventory, managed warehouse and supported business growth inside EPZ.- Maintained good relationship with local SIP and EPZ officers.- Achieved sales in five million US dollars, turned loss to net profit in FY2005.Project Manager- Involved in Kaizen projects to make continuous improvemen

19、t.- Implemented in reduction in cycle time, direct labor, scraps, and improvement of quality by using Lean manufacturing principles. - Developed engineering documents and work instructions. - Designed and developed tooling, fixtures, machine specifications, rebuilt and purchased new equipment.- Hand

20、s-on machine troubleshooting to reduce machine downtime. - Performed root cause analysis and statistical tools (6 Sigma and Cpk) to improve and implement solutions to complex manufacturing and tooling processes.- Involved in new product development by using QFD design principles and concurrent engin

21、eering team to quickly launch new product from concept through production.- Involved in planning and start-up of eight million dollar investment of Jacobs-Suzhou in China.- As a team leader to coordinate and lead cross functional teams both in U.S. and China to transfer products and technologies fro

22、m U.S. facility to Suzhou facility.- Implemented the initial production line design and operation start-up at Jacobs-Suzhou facility.- Provided training to Suzhou employees including Lean manufacturing, assembly process, work instruction, quality inspection, quality control and ISO9000 system.- Supp

23、orted and coordinated the construction project of Jacobs-Suzhou facility.- Assisted in localization for components, cutting tools, and spare machine parts.- Facilitated good communications between U.S. and China groups.Engineering Manager At Jacobs-Suzhou Facility - Managed and directed engineering

24、department and maintenance team.- Oversaw operation efficiency and product quality, drove for process improvement and troubleshooting to maintain high standard quality and productivity.- Led team members to resolve quality issues in related to product design, function, and manufacturing process on d

25、aily operations.- Managed and supported in outsourcing and component localization projects.- Supported service department in related to product function, quality and performance.- Drove for product redesign and making more competitive products for Chinese market.- Set up time line and successfully l

26、aunched production for transferred products within deadline.- Met with customers, vendors, and government officials to develop successful China operations.- Developed departmental budgets for capitalized equipment and other expenses.Resident Expatriate At Jacobs-Suzhou Facility - Assisted GM in defi

27、ning business plans and objectives, led team to take actions and execute plans.- Developed plans and drove for actions in continuous improvement of operational performance and cost reduction projects.- Monitored and supported existing operations to meet targets in quality, quantity, cost and deliver

28、y.- Drove Lean manufacturing initiatives throughout manufacturing areas.- Implemented and maintained manufacturing quality systems.- Directed for new product development, sampling, testing and pilot running. - Led cross functional team to launch new products and met goals in quality, cost, productiv

29、ity and capacity.- Supported and managed in localization projects and worked with suppliers to resolve technical issues.- Coordinated and supported in marketing, sales, human resource, logistics and recruiting efforts. - Managed in maintaining good relationship with customers, suppliers and local of

30、ficers.TechStyle Inc., Piedmont, South Carolina, USA. (1993-1995)Mechanical Engineer - Analyzed data to create and develop specifications and design concepts. - Applied computer aided design and drafting skills to design new products.- Performed kinematics and dynamics analysis as well as finite ele

31、ment analysis.- Made detailed and layout drawings, documented design records and bill of materials.- Worked with other engineers as a team to build prototypes.- Assembled and tested prototypes, made design alternation if necessary.- Modified and upgraded existing products for better performance.Desi

32、gn Engineer- Hands-on machine operation and general practice.- Designed and developed tooling and fixtures.- Made detailed and assembly drawings.- Documented design records and created bill of materials.- Worked with other engineers as a team to build fixtures.- Assembled and tested fixtures, made d

33、esign alternation if necessary.- Modified existing tooling and fixtures.EDUCATION: - Master of Science, Mechanical Engineering (May, 1995) - Clemson University, Clemson, SC, USA.- Bachelor of Science, Mechanical Engineering (July, 1990) - Jiangxi Polytechnic University, P.R.China.TRAINING:- Extensive Lean Manufacturing training by Mr. Nakao, Shiqijishu Consulting Firm (December, 1995)- Extensive Lean Manufacturing training by Mr. Nakao, Shiqijishu Consulting Firm (September, 1996) 17 / 17

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1