1、活动脚手架搭设方案Plan of Erection Procedures for Movable ScaffoldU 录 TABLE OF CONTENTS1. Prepare explanation 编制说明32. Reference 编制依据33. Descprition of gantry 搭设方案2/61. PREPARE EXPLANATION 编制说明在*中设备、管道及电气仪表安装过程中,为了安全施工及方便施 工,在施工区域现行国家施工规范、标准及规程(但不限于)National construction criterion, standard and regulations(no

2、t limited)建筑施工高处作业安全技术规范(JGJ80-91)Safety Technical Specification on Working in High Place of Building91Technical Code on the Safety of Scaffold of Steel Pipes inFastener Connection for Building Construction JGJ130-20013、搭设方案 PLAN OF ERECTION3. 1 询提条件 Prerequisites移动式脚手架山扣件式脚手架搭设。The movable scaffold

3、 must be built in fastener connection.移动式脚手架的各部件在使用询须经过项U部和桂的*材人员检查合格。All parts must be checked by * and the safety supervisors of* as ok before being put to use移动式脚手架不得人力搬运,必须配有脚轮;所有脚轮都须配有自锁装置,使移动脚手架在使用时保持不动。The movable scaffold must be handled with castors No manual efforts are allowed in this reg

4、ard; all castors are equipped with self-locking device, which serves to hold the movable scaffold still when it is useBoards must be completed paved tharough the movable scaffold* s operationplatform, and toe-board must be provided on platform* s edges移动式脚手架必须设置梯子,供上下进出;梯子与脚手架必须固定好或整体制作,确保使用时梯子与脚手架不

5、会分开。3/6Ladder must be provided for the movable scaffold to allow climbing; sufficient fixation of the ladder and scaffold must be provided or they should be provided as a package whole, hence sparing any hazard of disengagement in future use3. 2 移动式脚手架、梯子的搭设 Erection of movable scaffold and ladder移动

6、式脚手架跟其它脚手架一样必须由架子工搭设。操作平台不大于2mX2mOnly scaffold setters are allowed to set up movable scaffold, as is must with other scaffold types The platform area should not be bigger than 2mX2m毕III HSE部门组织检查,检查合格并挂牌后方可使用。During the erection or modification, no workers are allowed to use this scaffold short of s

7、caffold setters; the scaffold should not be put to use until it has been checked by HSE supervisors as ok and thereby green tagged移动脚手架的搭设必须有明确的作业区域,可以用警戒绳圈围。Specific area of construction should be defined for the erection of movable scaffold Cordon lines could be set up to identify the area移动脚手架必须逐

8、层搭设,固定好一层后,有了落脚点(水平架,必须捆扎固定)和安全带的固定点后再另行搭笫二层。Scaffold must be built floor by floor And no work on the next floor could start until this floor has been strongly fixed and footholds &anip; safety harness anchor points are available (Fixation through firm binding must be provided for horizontal sca

9、ffold)移动脚手架作业平台必须有护栏、踢脚板、水平架上的铺板跳板。Generally, the movable scaffold must be provided with railings, toeboards; and tread-boards specifically for horizontal scaffold装有轮子的移动式脚手架操作平台与轮子的接合处应牢固可靠,立柱底端离地面不得超过80mm.The joint between the platform of the wheeled moveable scaffold andthe wheels must be firm an

10、d reliable The distance between the bottomend of the standing pole and the ground surface must not exceed 80mm移动脚手架不高于5米时,脚手架每侧加斜支撑。如高于5米,需增加扫地杆加固脚手架。4/6Where scaffold is no higher than om, bracings must be provided foreach side of the scaffold; where higher than 5m, ground skirting must be added as

11、 scaffoldreinforcement3. 3 移动脚手架的使用 The use of movable scaffold只有完整的移动脚手架方能上人操作。Only on complete movable scaffold can workers perform their jobs脚手架使用前必须检查合格并挂绿牌.Scaffold must be green tagged before it is put into useWhere a movable is being used, its castors must be locked to maintain the necessaryf

12、ixation.当有人在活动脚手架上时,不可移动脚手架.Do not move the scaffold whenever there are persons on it.脚手架平台的载荷不超250,在平台上同时操作的人不超过3人.The maximum load for a moveable scaffold is 250, and no more than 3 persons are allowed to work on a scaffold platform simultaneous!y.在移动式脚手架上作业跟所有高空作业一样,不能上下抛物,只能用绳子上下传递物品;不能5/6取下安全带,

13、任何时候安全带的两根索都至少有一根挂在固定点上;作业人员 不能把身子伸到作业平台的护栏之外,任何时候都要保持重心在作业平台之 内。As is with other work performed at height, no tossing of objects from height is allowed For vertical transportation, only rope is allowed as the means: no removal of safety harness is allowed, and it must be always ensured that at leas

14、t one of the two lanyards must be the edge railings, and must always be wary against shifting his center of gravity out of the scope of platform.移动式脚手架在移动时,其平台上不得有人或工具、设备;移动的路径必须平坦,不得有障碍物或坑洞;移动式脚手架不得倾斜使用。Where a movable scaffold is to be moved, all people, tools & equipments must be cleared

15、off in advance; its route of advancement must be flat, free of pits or obstacles; removable scaffold must be not be used when positioned slanting移动式脚手架在移动或修改后必须经过现场的HSE人员确认后方可再次使用。All movable scaffold, after modification or having being moved, must not be useduntil it has been confirmed by HSE supervisors on site as ok.6/6