1、WPECDOC. NO.: QCDP-01REV. NO.: 0Page 1 of 6RULE FOR DESIGN CONTROL43210REV. NO.PREPARED BYREVIEWED BYAPPROVED BYACCEPTED BYWPECDOC. NO.: QCDP-01REV. NO.: 0Page 2 of 6RULE FOR DESIGN CONTROLThis rule is supplemental to QC Manual for design control.1. Authority and Responsibility1.1 The Manager of Des

2、ign Section1.2 The Design EngineersWPECDOC. NO.: QCDP-01REV. NO.: 0Page 3 of 6Specifications to verify that the Specification contains requirements and data in such detail as to constitute an adequate basis for selecting materials, designing, fabricating, testing and inspecting the Code Items, and t

3、hat the Specification conforms to the requirements of the Code.2. Design Process Control2.1 Design ProcessThe design process of pressure vessel is divided into two stages, the preliminary design stage and the construction drawing design stage. The preliminary design means the basic design prepared f

4、or bidding or quoting purpose. For the cause of management, the quoting drawing shall be reviewed by the Design Section Manager and approved by the General Engineer. The routine procedure for preparation, review and approval of the construction drawing design shall conform to the requirements of the

5、 QC Manual.2.2 The Work of Respective StageWPECDOC. NO.: QCDP-01REV. NO.: 0Page 4 of 62.3 Design QualityThe designers shall implement the authority and responsibility prescribed in para.1 above for acquiring good quality of design.3. Design Documents Control3.1 The design documents include the Custo

6、mers Specification, drawings and calculation sheet the Material Requisition including Purchase Specification, the Design Revision Notice and proof test report etc.3.2 The documents prepared by Design Section shall be registered and numbered by the Document Keeper of File Section.3.3 The documents re

7、ceived from other factories, such as the Customers Specification shall be registered by the Document Keeper, and shall be issued to the concerned personnel by the Design Section Manager.3.4 The assignee of any document shall be registered in the Document List. The obsolete documents shall be handled

8、 in accordance with the provision of the QC Manual. Those documents without covered in the QC Manual shall be decided by the Design Section Manager.4. Revision of Design Document4.1 Responsibility and ProcedureWPECDOC. NO.: QCDP-01REV. NO.: 0Page 5 of 6put forward the revision opinion. The routine p

9、rocedure of review and approval for revision shall be the same as the original.4.2 Methods of RevisionREVISION MARKDESCRIPTIONPREPARED BYREVIEWED BYAPPROVED BY修改标记修改说明编制审核批准Method of filling revision block:The main cause and content of revision shall be filled in the revision block. As for those revisedWPECDOC. NO.: QCDP-01REV. NO.: 0Page 6 of 6parts which are caused by the revision of relevant part, its part number shall be filled in the revision block.