十幼冬期施工方案.doc

上传人:本田雅阁 文档编号:2029544 上传时间:2019-02-06 格式:DOC 页数:34 大小:706.01KB
返回 下载 相关 举报
十幼冬期施工方案.doc_第1页
第1页 / 共34页
十幼冬期施工方案.doc_第2页
第2页 / 共34页
十幼冬期施工方案.doc_第3页
第3页 / 共34页
亲,该文档总共34页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《十幼冬期施工方案.doc》由会员分享,可在线阅读,更多相关《十幼冬期施工方案.doc(34页珍藏版)》请在三一文库上搜索。

1、laparici de tot tipus de casos, la caiguda daccident de sha produt. (9) on la feina nivells sense operacions de installacions de protecci de seguretat, treballadors de la construcci han de dur un cintur o arnesos de seguretat (dispositius de protecci de seguretat sha comprovat abans del seu s), el c

2、intur de seguretat o cordes de seguretat utilitzats han de complir els principis dalta i baixa. No hi ha deures don ls de productes de protecci, per evitar accidents de caiguda passi. 6, prevenci dintoxicacions, asfxia accident les mesures preventives per evitar lenverinament, millor protecci de la

3、seguretat i la salut dels treballadors, les mesures es formulen. (1) quan la profunditat de la pila s ms de 5 M, el dia abans de linici de ls detector de gas per a la detecci de gasos txics, confirmar que el gas dins del forat correctament, abans dobra menor; ha de tenir 15min noms desprs de la vola

4、dura de fum forat es permeten les operacions. (2) lalberg est estrictament prohibit en lemmagatzematge de substncies txiques i qumics. (3) s interior lestabliment independents Calefacci, no fan de flama oberta denllumenat, Calefacci, per evitar accidents que requereixen denverinament de monxid de ca

5、rboni independents de lhabitatge Cambra climatitzada amb foc de carb, estufes ha de ser situats a lexterior. (4) al menjador de lautoritzaci de sanejament, personal de cuina ha de tenir un certificat de salut i certificat mdic per treballar. Botiga daliments crus i cuinats ha de ser processat per se

6、parat. for safety and security, set up security groups, head of the work group is responsible for the operations of safety and security, each team full-time safety officer is responsible for the daily life and production security. 成 . Good dining, on the implementation of special detection system fo

7、r procurement of food, preventing the purchase of spoilage and poisonous food to prevent food poisoning accident occurred. Pay attention to personal and environmental hygiene, to beautify the environment, clean air, beautiful life, environment, prevent the spread of infectious disease epidemics and

8、ensure attendance to ensure production safety. 8.4.4.4 from management to ensure safety punishment detailed rules for the implementation of a safety. To comply with policies, laws and regulations, observe labour discipline, according to safety regulations and technical specifications for constructio

9、n requirements for the construction, maintenance of production and life order, maintain social order there is significant merit in team and individual Award respectively; otherwise, penalties, to ensure production safety. 8.4.4.5 construction site safety protection 1) temporary facilities security p

10、rotection a. construction of establishing traffic signs and lighting, vehicle and pedestrian traffic safety. B. underground structure within the construction site, the underground pipeline,dificultats, punt clau de quantitats. Una secci duna gran quantitat de construcci, durada requereix atapet. Qua

11、ntitat de les obres es va centrar en lexcavaci subgrade, tallar una quantitat enorme (uns 75,3. Eleccions havia participat en les tasques de construcci similar i t una mplia experincia en gesti de projectes de composici xiangfu East road obres el primer tram del Departament, per a la durada del proj

12、ecte, qualitat, control, cost i seguretat i m dobra dmbit. Director de projectes del grup denginyeria, qualitat, mquina de grup, un grup integrat i grup financer. Deures de cada posici, Departament, funcionar com segueix: director de projecte: en el curs de la implementaci del projecte per part de l

13、empresa per realitzar el contracte dobra, responsable general de gesti de projectes. Adjunt cap del projecte: per assistir el director del projecte de direcci crrec producci, elaboraci de plans de construcci, coordinar la relaci entre qualitat, tecnologia i producci planificar. Director tcnic: respo

14、nsable de qualitat i treball tcnic, tractant amb problemes tcnics en la construcci, instruccions tcniques i orientaci tcnica i dades tcniques de la direcci, preparaci organitzativa del disseny dorganitzaci de construcci per a la implementaci. Departament denginyeria: segons el projecte, lestabliment

15、 de moviment de terres i drenatge construcci, construcci de carreteres, jardineria, construcci dinstallacions dilluminaci i el trnsit i mesura de grups i informaci i cost. Cada equip s responsable i acceptar un comandament unificat, en estreta collaboraci. Principalment responsable dorganitzar lexec

16、uci de la construcci de lestabliment, recollida de dades i arxiu i gesti de contractes. QC: responsable de testing i qualitat inspecci. Organitzar per implementar els plans de qualitat, proves de materials de construcci, qualitat inspecci i supervisi del procs de construcci. Departament: responsable

17、 de subministrament de materials denginyeria i implementaci de lequip, mentre que la compra de materials i subministraments s responsable de la qualitat. Responsable de la reparaci i manteniment de maquinria de construcci i equipament. Departament general: encarregat de co-apoptosi extern, suport lo

18、gstic i sota la direcci del seu project manager, responsable de lobra de producci segur i construcci civilitzat. Departament financer: responsable de la comptabilitat financera i estadstica previst. Gestores especfiques veure Xia pgina figura: construcci organitzaci institucions diagrama Hunan casa

19、carretera Enginyeria viaria estndard pargraf primer director composici personal projecte director projecte vicegerent construcci cap membre mesura membre qualitat membre seguretat de temps complet membre cost membre informaci membre Jie Tao Zhi Liu rei agrcola Hui Lu Peisong Jay Deng setmana tecnolD

20、elegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assem

21、bly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, s

22、mooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.81

23、5 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No per

24、sonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207

25、million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfor

26、mance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduct

27、ion over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two management system for improvement. Fo

28、cus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network

29、 role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervisi

30、on of production safety and the Olympic Games and other北京万兴建筑集团有限公司 北京市大兴区第十幼儿园一.编制依据本施工方案主要编制依据参见下表所示。序号类别名称编号1国家建筑工程施工质量验收统一标准GB50300-20012混凝土结构工程施工质量验收规范GB50204-2002(2011修订版)3混凝土强度检验评定标准GB/T 50107-20104普通混凝土搅和物性能试验方法GB/T50080-20025普通混凝土力学性能试验方法GB/T50081-20026混凝土外加剂应用技术规范GB50119-20037行业混凝土泵送施工技术规程

31、JGJ/T10-20118建筑工程冬期施工规程JGJ/T104-2011 9地方混凝土外加剂应用技术规程DBJ01-61-200210混凝土结构工程施工质量验收规程DBJ01-82-200511预拌混凝土质量管理规程DB11/385-200612冬期混凝土综合蓄热法施工成熟度控制养护规程DBJ/T01-36-9713建筑安装分项工程施工工艺规程DBJ01-26-200314建筑工程资料管理规程DB11/T695-200915工程建设监理规程DBJ01-41-200216其它设计图纸、设计变更、工程洽商记录本工程18施工组织设计本工程二.工程概况2.1工程基本概况序 项目 基本概况1工程名称北京

32、市大兴区第十幼儿园2工程地址北京市大兴区黄村镇3建设单位北京市大兴区教育委员会4设计单位北京立信铭达建筑勘察设计有限公司5监理单位北京鸿祥工程建设监理有限责任公司6勘察单位中兵勘察设计研究院7质量监督单位大兴区质量监督站8施工单位北京万兴建筑集团有限公司9计划工期2012年10月20日至2013年7月20日10合同承包范围施工总承包11合同性质投标12质量目标北京市优质工程13安全目标无重大伤亡事故,一般事故率3以下2.2工程建筑设计概况序号项目 内容1合理使用年限50民用建筑设计等级三级屋面防水等级级防水层耐用年限10年耐火等级二级建筑高度12米消防设计本工程多层公共建筑,按二级耐火等级设计

33、,共三层,每层为一个防火分区,每层设两部疏散楼梯,消防水源从康庄回迁房已有消防管线及小区自来水管接入,室外设消防水泵结合器一套,距离室外消火栓1540m,并方便消防车使用,副食库、副食加工区、主食加工区、楼梯间、强弱电间等设备用房均采用已级防火门,更衣室采用耐火极限不低于2h的水泥空心板隔墙。2建筑功能幼儿园 30.00042.04m4建筑层数地上(层)3局部4层地下(层)05平面布局场地内布置为1栋单体建筑,场地内设有运动场、绿地、树下活动场6建筑层高标准层高3.00米音体活动室4.50米7建筑功能划分幼儿园教学楼内设有12个班,它们均分布在首层至三层的南侧。首层北侧凸出部位为音体室,首层东

34、北角为洗衣房,东侧为副食加工区;楼内设有教师办公室、衣帽贮藏室、漱洗室、卫生间保教人员休息室等。8墙体工程1、 外墙:-0.30以上采用250厚加气混凝土砌块,强度等级A2.5,干体积密度级别为B05(合格品),Mb5.0专用砂浆砌筑,-0.30以下墙体采用实心蒸压灰砂砖,强度等级不小于MU15.0,砌筑砂浆强度等级为M10水泥砂浆。2、 内墙:-0.30以上采用200厚墙体 采用加气混凝土砌块,强度等级为A3.5,干体积密度等级为B05(合格品),Mb5专用砂浆砌筑,100厚墙体采用增强水泥空心板隔墙。9门窗建筑外窗采用断桥铝合金门窗,抗风压性能为5级(3.0Kpa),气密性能为6级(1.5

35、),水密性能为3级(250)所有外窗均加设纱窗。玻璃采用辐射率0.250的Loe中空玻璃,单块玻璃面积达到1.5m2采用夹胶玻璃或钢化玻璃,门窗玻璃低于900处及建筑入口、门厅等易受撞击对人体造成伤害部位使用安全玻璃,幕墙使用安全玻璃。10节能设计 屋顶屋顶50mm厚憎水珍珠保温砂浆外墙80泡沫玻璃保温板2.3工程结构设计概况序项 目内 容1结构形式框架结构2基础类型独立基础3地下水质地下水对混凝土无腐蚀性4地基地质标准冻深0.80米5地基承载力标准值200Kpa地基基础设计等级乙级6结构设计条件设计基准期50年地基基础设计等级三级设计使用年限50年地下工程防水等级一级结构安全等级二级重要性系

36、数1.0荷载调整系数1.0室内外高差-0.3m抗震设防类别乙级抗渗设计水位室外地坪抗震设防烈度8度抗浮设计水位地下20m基本地震加速度0.20g基本风压0.45kN/m2地面粗糙度类别B类基本雪压0.4kN/m2设计地震分组第一组7场地类别类8钢筋钢筋类别、钢筋接头形式绑扎、直螺纹9结构尺寸(mm)垫层100基础600、650、700梁300*600、300*650、300*700等柱700*700、600*600等顶板120、150、160、180等10梁最大跨度7.20m柱最大高度3.60m11钢筋保护层(mm)独立基础底板底面40 mm12基础梁35 mm13基础柱35 mm14地上柱、

37、梁20 mm15地上板15 mm16环境类别基础二类b17地上室内一类18耐久性要求最大水灰比最低混凝土强度等级最大氯离子含量(%)最大碱含量(kg/m3)19一类0.60C200.30不限制20二类b0.5(0.55)C30(C25)0.153.021混凝土强度等级垫层C1522基础底板、基础梁C3523楼板C2524柱一、二层C35,三层以上C3025梁C3026楼梯C302.4工程冬期施工概况 根据本工程施工组织设计部署,本工程基础结构、主体结构施工进入20122013年度冬期施工。本工程冬季施工的内容包含混凝土工程、钢筋工程、模板工程。为了加快施工进度,达到预期的质量指标和工期指标,根

38、据国家有关规定、规程的要求,特编制本冬期施工方案,以资在2012-2013年度冬期施工中按照此方案执行,保证工程质量。三.冬期施工部署1.冬期施工原则及特点冬期施工原则:根据(JGJ/T104-2011)建筑工程冬期施工规程,冬期施工时间界定原则为室外日平均气温连续5d稳定低于+5时,即进入冬期施工;当气温回升,连续5d高于+5时即可解除冬期施工。北京地区规定建筑工程冬期施工作业时限为是本年11.15至次年03.15。本工程冬期施工起始时间安排为2012.11.15。但应提前做好冬期施工有关准备工作,一旦有寒流袭击,室外日平均气温连续5d稳定低于+5则随即进入冬期施工。其间,若气温达到-12,

39、即暂时停止施工。本年度冬期施工解除时间安排为2013.03.15,但届时应参照气温观测数据,室外日平均气温连续5d稳定高于+5时即可解除冬期施工。冬期施工特点:(1)冬季施工条件及环境不利,是工程质量事故出现多发季节,其质量事故出现约占全年的三分之二以上,尤以混凝土工程居多。(2)质量事故出现的隐蔽性、滞后性,即工程是冬天施工的,大多数在春季开始才暴露出来,因而给事故处理带来很大难度。(3)冬期施工的计划性和准备工作时间性强。2冬期施工进度计划根据北京地区气温条件、混凝土拆模条件, 本工程冬期施工垫层、基础、首层至三层的钢筋、模板、混凝土工程,依据目前的施工情况,结和本工程现有施工条件和工程量

40、诸因素,熟悉掌握各部位施工方法,保证把各种费用降至最低点。 3成立冬施领导小组本工程冬期施工阶段项目部管理人员和施工班组的编制上和管理机制仍依照施工组织设计,由廊坊生达建筑劳务有限公司具体负责结构施工。项目部成立冬期施工领导小组,进入冬期施工前应采取一定的措施以满足施工要求,防止突然的降霜、寒流等对混凝土造成伤害。为确保冬施期间施工工作的顺利进行,项目部设立冬季施领导小组,及测温小组,组织冬期施工的生产、技术、质量、安全管理和冬施物资的供应,负责冬施工作的协调组织,并明确责任,确保冬期施工中各项工作及时有效的进行,避免由于冬期施工组织不力给生产进度、工程质量、安全施工造成影响。严格检查各项冬施

41、工作的落实情况,做好测温记录,责任到人,加大奖罚力度,严格控制施工质量,确保冬施的顺利进行。其人员安排如下:冬期施工领导小组成员表职务姓名主要职责备注组长王 锐负责全面工作副组长罗成彬负责生产调度李广辉负责施工技术组员王善国负责施工质量吕建辉负责消防、安全文明施工姜浩负责每日测温以及施工中的取样送检工作张桂云负责资料吕大同负责冬期施工物资的采购、保管付立传负责电气施工李宏伟负责水、暖施工组长职责:项目经理王锐负责全面管理冬期施工管理工作,组织技术负责人编制冬期施工方案,安排冬期施工生产计划,落实冬期施工物资进场计划等。副组长职责:技术总工李广辉技术、质量、安全等方面工作,协助组长进行冬期施工管

42、理,安排冬期施工作业计划,编制冬期施工生产计划,编制冬期施工方案,施工技术措施,生产经理罗成彬具体落实冬期施工关于生产、组织冬期施工材料进场,安排现场安全工作,组织文明施工作业等工作。组员职责:现场具体进行冬期施工管理,落实施工方案及技术措施,检查施工质量,加强安全与文明施工管理,落实生产作业计划,协助副组长进行冬期施工管理工作。 四.冬期施工准备1.技术准备1.1编制冬期施工方案,编制原则是确保工程质量经济合理、技术上可靠,使增加费用最少,所需材料和热源有可靠的来源,并尽量减少能源消耗,施工进度快,缩短工期。1.2组织参加冬期施工的人员熟悉设计图纸,学习(JGJ1042011)建筑工程冬期施

43、工规程和(DBJ01822005)混凝土结构工程施工质量验收规程,宣贯本冬期施工方案。1.3由土建工长编制冬期施工技术交底,由安全负责人编制冬期施工安全交底。于11.10组织操作人员进行一次冬期施工技术培训,对现场施工人员专门组织技术培训,学习冬施规程、施工方法及有关的技术措施,明确各自的职责。使测温人员了解如何进行测温、混凝土测温的重要性、测温数据的真实性对混凝土工程的影响等。1.4技术部门成立冬期施工测温小组,设专职测温员,测温员要掌握测温项目与要求,具备测温操作、测温记录与数据分析等实际工作能力,与当地气象台保持联系,及时掌握天气变化情况,防止寒流突然袭击,做好天气突变的防范措施。冬期测

44、温项目及次数测温项目测温次数室外气温及环境温度每昼夜不少于4次,此外还需测最高、最低气温。混凝土出罐、浇筑、入模温度。每一工作班不少于4次注:室外最高、最低气温测量起止日期为本地区冬期施工起始至终了时止。混凝土养护期间温度采用综合蓄热法养护从混凝土入模开始至混凝土达到受冻临街强度,或混凝土温度降到0 或设计温度以前至少每隔6小时测量一次。1.5试验员掌握冬期施工混凝土试块留置要求、留置数量。实验室和标养室所用仪器设备在冬期施工前进行1次检查,添置必需用品,修复损坏仪器。1.6测温时间和所测温度值应详细记录,整理归档。每天、每层、每施工段停止测温后,由技术员审阅测温记录签字后交技术负责人审核。技

45、术员定期将测温记录归入技术档案,以备存查。测温人员应保持与保温人员的联系,如发现保温措施不当使温度急剧变化或降温过快等情况,应立即向项目技术负责人报告进行处理。项目的质量检查人员,每天要抽查测温情况,将其纳入质量控制的范围。2.材料准备由于本工程采用商品混凝土,根据实际情况要求相应的混凝土质量要求,确保混凝土的施工质量。 根据施工具体情况,在保温、蓄热、防风、防雨雪等方面采用阻燃草帘被和有封闭作用的塑料薄膜、编织彩条布等材料。准备好足够的阻燃草帘被、彩条布、塑料布等,作为施工作业面及周围环境的保温材料。测温准备:密切注意天气变化,防止早期寒流对结构砼强度的影响。保温材料:保温草帘被、塑料布等提前进入现场。测温材料:购置齐温度计、高低温度计、测温百叶箱以保证测温和大气温度测温要求。 冬期施工主要辅助材料、器具计划表序名称规格单位数量备注1钢筋t722灭火器个83聚苯板5004编织彩条布1600挡风5塑料薄膜1000覆盖保温6阻燃草帘被 1000覆盖保温7电暖器个458便携式电子测温计JDC3块19高低温度计支210玻璃温度计支30