武水高速公路路面工程监理实施细则正文.doc

上传人:本田雅阁 文档编号:2036661 上传时间:2019-02-07 格式:DOC 页数:143 大小:1.58MB
返回 下载 相关 举报
武水高速公路路面工程监理实施细则正文.doc_第1页
第1页 / 共143页
武水高速公路路面工程监理实施细则正文.doc_第2页
第2页 / 共143页
武水高速公路路面工程监理实施细则正文.doc_第3页
第3页 / 共143页
亲,该文档总共143页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《武水高速公路路面工程监理实施细则正文.doc》由会员分享,可在线阅读,更多相关《武水高速公路路面工程监理实施细则正文.doc(143页珍藏版)》请在三一文库上搜索。

1、inspecci de seguretat integral, informar sobre la comprovaci, sistema de cstig estricte, per trobar el problema, posar-lo a persones, rectificaci. Membres claus de les responsabilitats dequip de gesti de seguretat sn els segents: 1, projecte (1) projecte de director s el responsable dEnginyeria de s

2、eguretat i eren directament responsable. (2) tecnologia de seguretat dirigides les organitzacions dna les baixes. (3) responsable dorganitzar laplicaci de mesures de seguretat. (4) qualificat dequipament de maquinria construcci, lnies temporals electricitat per organitzar la inspecci i lacceptaci, a

3、bans dutilitzar. (5), responsables de la construcci civil, regles normalitzar i civilitzada lloc de construcci. (6) sobre una base regular per organitzar la regulaci de la seguretat operaci, treballadors de leducaci en les operacions illegals i seguretat organitzativa violacions (7) comprova com a m

4、nim un cop per setmana,. Comprovar al voltant de, entorn de treball i va trobar amagat a prendre mesures immediates per eliminar abans que pugui treballar. (6) un accident o gaireb enfonsat informar immediatament al responsable del projecte i per protegir el lloc, participar en la investigaci. Segur

5、etat cinc objectius (1) seguretat construcci estndard lloc ndex de qualitat: normes de seguretat complet lloc activitats, normes davaluaci final dany. (2) mesures de control de seguretat: no seriosament lesionat dins i fora el personal de lloc de construcci durant el perode de construcci (ambds incl

6、osos) o ms accidents, malaltia professional taxa de 0; eliminar lesions de transport (o ms) major sinistralitat, accident explosius, accidents de foc, enverinament massiu i control acumulativa prdues econmiques en anys per completar la construcci del valor de 0,06 per mil. Sis, suport de construcci

7、i anti-lliscant bloc suport de disposici i control lliscant sortir fixa comentaris tenint llosa amb enviar placa jssera elevaci i set abans de la construcci preparat per backfill pendent 1, con en lloc, grues i llarga ruta de camions ha de ser suau, pis, no denfonsament, aix com no per retardar laix

8、ecament de temps, fent construcci suau. 2, fer front i tapa de formig estrep del perode de manteniment. 3, llosa de formig periode de curaci. 4, primer esbrinar totes les vores de placa feix i rodaments de goma, goma dna suport a lembarcador amb pegament epoxi a. 5, llest per controlar lexpansi de J

9、unta, 4cm i estores de jsseres de placa de ferro, Pau gruixut - 8mm 15mm. 6, durant tot el procs de construcci, atenci ha de prestar productes semielaborats i acabats (com el sl, placa jsseres, Cap, afrontament i aix successivament) en manteniment. 7, aixecament de tot el personal ha justament distr

10、ibut, cada procs hauria de ser sota el comandament dalg. Vuit i seleccioneu mecnica Sha Yixi pont i oli desprmer apurat , pont, i oli espremut apurat II, pont i final de cavallof the situation, the cultivation of strategic thinking and historical thinking, dialectical thinking, creative thinking, th

11、e bottom line of thinking, a profound analysis of the new trend of the development and change of international and domestic situation, facing opportunities and challenges, and constantly enhance the predictability. At the same time, to in-depth investigation and study, a profound understanding of th

12、e characteristics of current stage of Chinas development and in different places and different fields of specific performance, find Chinas development is facing the contradictions and problems, understand the expectations of the people, make our Decisions and work more in line with the actual more i

13、n line with the wishes of the people. Adhere to the partys ideological line, we must insist on emancipating the mind, seeking truth from facts and keeping pace with the times, pragmatic, the core of which is to seek truth from facts. This is on the thought course of the party spirit, the practical r

14、equirements of a highly generalization. Development of practice is endless, understanding the truth is endless, theory and practice innovation is endless. Adapt to the demands of the age development, with many new historical features in the great struggle, winning the completion of a comprehensive w

15、ell-off society, there is an urgent need for us to greater courage and wisdom, and actively explore, bold experiment, study the new situation, summarize new experience, continue to promote Theoretical innovation based on practice, scientific and technological innovation, cultural innovation, system

16、innovation and other aspects of innovation, with new ideas, ideas and initiatives, efforts to solve the economic construction, political construction, cultural construction, social construction, ecological civilization construction and the construction of the party faces new problems, and constantly

17、 open up the cause of socialism with Chinese characteristics development in the new situation. How to understand the cause of socialism with Chinese characteristics, one of five overall cloth? the constitution will be the overall layout of the cause of socialism with Chinese characteristics determin

18、ed for the economic construction, political construction, cultural construction, social construction, ecological civilization construction of one of the five. Economic construction is to the development of the socialist market economy and political construction is to develop socialist democratic pol

19、itics and culture construction is to develop advanced socialist culture, social construction is to building a socialist harmonious society, the construction of ecological civilization is to building a socialist ecological civilization. Partys eighteen years, the Central Committee of the Communist Pa

20、rty of China according to the new requirements of the changes in the situation and tasks of development, made a four overall strategic layout, and puts forward the innovation, coordination, green,thrift of excellent traditional and style lack deep of understanding, one-sided think in now of good sit

21、uation Xia, economic smooth more fast development, and reform made major progress, and people living significantly improve, and social the career made new progress, no necessary always hard has, no awareness to China also has many poverty area, and also has many poverty population of exists, more li

22、ving improve has, more need keep hard of style. Three is not strictly honest. Total thought units is a water sector, clean self-discipline away from himself too far, no real processing good living of improve and hard, and thrift excellent traditional of relationship, no effective do comply with Cons

23、titution and party of regulations must from I do up, no right mercy good bitter Le, and wealth of relationship, no right awareness to in comply with Constitution and party of regulations aspects everyone has accountability. Four, future direction and improvement measures 1, belief and faith, strengt

24、hen party spirit. One is to firmly establish the noble ideals of struggle for the ideals of communism, communist struggle for life, ready to sacrifice everything for the party and the people. Second is to continuously improve the quality and standard of political, conscientiously study Deng Xiaoping

25、 theory and three represents important thought and the scientific Outlook on development, implement the partys basic program for the primary stage of socialism, adhere to the correct political orientation, maintain highly consistent with the CPC Central Committee, is good at theories of socialism wi

26、th Chinese characteristics to analyze and solve problems. Third, strengthening the party spirit and the world transformation, perseverance of the party Constitution, relive Party vows to establish correct world Outlook, Outlook on life and the world, practically embodies ideals and beliefs into acti

27、on, combine lofty ideals and practical activities, transforming the objective world, actively participate in the great practice of building socialism with Chinese characteristics. 2, keep the purpose in concept, changing the style of work. First, keep in mind that the purpose of serving, adhere to a

28、ssuming power for the people, keep in mind the people and care about people, and the joys and sorrows of the masses, .According to city discipline, and municipal organization Department requirements, today we held implement implementation independent Commission against corruption guidelines effectiv

29、e strengthening led cadres style construction topic democratic life, main task is close contact thought, and work actual, control check district Standing Committee team and the personal in implementation independent Commission against corruption guidelines Shang exists of problem, in-depth carried o

30、ut criticism and self-critical, further clear rectification direction and measures, effective enhanced clean politics of consciousness and initiative, firm set good of ruling image. Before the meeting, the way we take surveys solicited a views, combed, related to team building重庆至长沙高速公路武隆至水江段监理实施细则 路

31、面工程监理实施细则路面工程监理实施细则第一章总 则一、编制目的:为了切实加强武隆至水江段高速公路路面工程的施工监理工作,依据合同及设计文件的有关规定,对路面工程各工序施工做到全面预控,严格做好原材料质量控制、施工控制参数、现场施工过程质量控制和分部、分项工程验收等关键环节的把关工作,从而有效保证路面工程质量优良的总体目标,充分发挥监理单位在工程建设中的重要作用,特制定本细则。二、编制依据:1、重庆至长沙高速公路武隆至水江段路面工程施工招标文件;2、重庆至长沙高速公路武隆至水江段两阶段施工图设计文件;3、公路工程施工监理规范(JTG G102006);4、公路路面基层施工技术规范(JTJ 034

32、2000);5、公路水泥混凝土路面施工技术规范(JTG F302003);6、公路沥青路面设计规范(JTG D50-2006);7、公路沥青路面施工技术规范(JTG F40-2004);8、公路工程质量检验评定标准(JTG F80/12004);9、其他相关的试验规程、标准等。三、工程概况:重庆至长沙高速公路武隆至水江段,路线起于武隆县城,经巷口、羊角、白马、长坝、双溪,止于南川区水江镇,路线全长54.853公里,其中有特大桥、大桥28座/9236.402米(右线),中小桥7座/412.914米(右线),占17.55%;隧道7座/28478.84(右线),占51.8%;桥隧累计占69.35%,

33、武隆县城和白马镇设2处互通式立交,路面设计为双向四车道。本项目路面工程合同工期为一年,计划于2009年12月份完工。本项目共分为一个路面施工合同段,主要路面工程数量详见下表:武水高速公路主要路面工程数量表序号路面结构类型结构层名称单位工程数量备 注1主线路面(L1)4改性沥青混凝土SMA-13上面层m2833729.429公里4改性沥青混凝土AC-13C上面层28605745.424公里6改性沥青混凝土AC-20C中面层37158154.853公里8普通沥青混凝土AC-25C下面层3745910.8改性沥青碎石封层37648221水泥稳定级配碎石基层38838522水泥稳定级配碎石底基层424

34、51620水泥稳定级配碎石垫层4373062匝道路面(L3)4改性沥青混凝土AC-13C上面层m2502586改性沥青混凝土AC-20C下面层505100.8改性沥青碎石封层5432921水泥稳定级配碎石基层5536522水泥稳定级配碎石底基层5784820水泥稳定级配碎石垫层607403桥面铺装(L4)4改性沥青混凝土SMA-13上面层m291026B9、B11合同段4改性沥青混凝土AC-13C上面层979776改性沥青混凝土AC-20C下面层1863494隧道铺装(F1)4阻燃改性沥青混凝土SMA-13上面层m2113903长坝、白云隧道4阻燃改性沥青混凝土AC-13C上面层4473226

35、改性沥青混凝土AC-20C下面层45814425水泥混凝土面板45814412水泥混凝土基层129660第二章施工准备阶段监理第一节 监理单位自身的准备工作 一、配备试验室设备总监办中心试验室按监理合同要求配备常规的试验检测设备;驻地办试验室将按监理合同要求配备现场抽查常用的试验检测设备。二、熟悉合同文件总监办组织监理人员熟悉监理合同、施工合同、工程前期有关文件、工程设计文件和图纸、工程实施过程中的的有关函件,当发现有关文件不一致或有错误时,将及时书面报告业主。三、调查施工环境条件监理工程师对施工合同规定的施工条件进行调查,掌握有关情况。第二节 施工准备阶段监理工作内容一、参加设计交底 监理工

36、程师参加设计交底,掌握本工程的设计意图、设计标准和要点;熟悉对材料与工艺的要求,施工中应特别注意的事项,以及对施工安全、环保工作的要求等;澄清有关问题,收集资料并记录。总监办将组织驻地办及现场监理组讨论分析设计图纸,抓住监理工作重点,找出设计中存在的问题和需要完善的内容。二、审批实施性施工组织设计总监理工程师在合同规定的期限内及时审批施工单位提交的实施性施工组织设计,审查重点包括:1、施工组织设计的审批手续是否齐全有效。2、施工质量、安全、环保、进度、费用目标是否与合同一致。3、质量、安全和环保等保证体系是否健全有效。质量保证体系负责人必须由项目技术负责人兼任,并应配备足够的有施工技术及管理经

37、验的人员,质量、安全责任必须落实到人,并建立责任追究制;现场的施工技术人员、测量及试验检测人员均应纳入现场工点质检负责人的一体化管理。各项施工方案中必须有明确的质量控制措施和办法,同时应提出各项工程检查验收程序和方案。审核施工人员及自检人员配备是否能够满足工程需要,质量自检体系是否完善。4、施工单位进场人员的工作能力、资质条件和数量,进场的机械设备、试验检测仪器(包括计划进场的设备)的规格型号、性能、生产能力、完好率以及数量等是否与投标承诺相符,是否与施工组织设计中提出的施工方案相配套。且主要机械设备以及试验检测仪器是否经过计量部门检验标定。5、安全技术措施、施工现场临时用电方案及工程项目应急

38、救援抢险方案是否符合要求。6、施工总体部署与施工方案和安全、环保等应急预案是否合理可行。技术复杂或采用新技术、新工艺或在特殊季节施工的分项、分部工程和危险性较大的分部工程,要求施工单位编制专项施工方案,并由驻地监理工程师审核,总监理工程师批准后实施。施工单位应根据设计要求并结合本合同段的具体情况,详细地制定确保路面质量、预防路面早期破损的路面工程专项施工组织设计,经监理单位审查后报业主审批。施工组织设计的内容应包括:原材料的储备计划、料源地点、采备方式、运输形式、堆放场地,试验路段及各结构层的施工计划、机械设备、试验检测仪器的配备和施工人员的安排计划、采用的施工工艺和各工序的衔接要求、特殊气候

39、条件(雨季、高温、低温)下的施工对策,以及自检和质保体系、安全、环保措施等。无施工组织设计的或施工组织设计不完善的,应视为路面施工条件不具备。总监办将不予签发路面开工报告,直至施工组织设计获得批准为止。三、检查施工单位的保证体系 监理工程师检查施工单位质量、安全和环保等保证体系是否落实,重点检查项目经理、技术负责人、工地试验室负责人的资格及质量、安全、环保人员的履约情况。四、审核工地试验室 监理工程师审核施工单位工地试验室的人员、设备、和试验检测能力是否满足合同要求,管理制度是否健全。五、审批复测结果监理工程师应对施工单位提交的原始基准点、基准线和基准高程的复测结果进行审核和平行复测。当双方复

40、测结果一致并满足规范要求时,监理工程师将在合同规定的期限内批复。六、审批工程划分总监理工程师将在总体工程开工前对施工单位提交的路面工程分项、分部、单位工程划分予以批复并报业主备案。七、确认场地占用计划监理工程师对施工单位提交的场地占用计划及临时增减的用地计划予以确认,并及时提交业主。八、核算工程量清单监理工程师对施工单位提交的路面工程量清单复核结果进行核算。九、签发开工预付款支付证书总监理工程师在施工单位提交了开工预付款担保后,按合同规定的金额签发开工预付款支付证书,报业主审批。十、召开第一次工地会议总监理工程师在工程开工之前主持召开第一次工地会议。十一、签发合同工程开工令监理工程师收到施工单

41、位提交的合同工程开工申请后,将对合同工程的开工条件进行核查。具备开工条件的,由总监理工程师签发合同工程开工令,并报业主备案。第三节 验收路床顶面路床顶面交验时,首先要对填方路基的上路床(路基顶面以下30cm)、挖方路基的换填部分(土质路段不少于80cm,石质路段不少于50cm)以及挖方路基土质路段翻挖部分(路床80cm范围内)的填筑质量、软土地基路段的月沉降量进行检查。上路床填料和挖方换填料必须采用透水性材料(液限不大于28%,塑性指数不大于9%,小于0.075mm颗粒含量不大于15%,且0.5mm以下细粒含量与塑性指数的乘积不大于100),最大粒径应小于10cm,且具有良好的级配,分层填筑厚

42、度不大于20cm,路基顶层厚度不得小于10cm,严禁贴薄层施工;对于缺少透水性材料的路段,经业主批准,可以通过掺加生石灰或水泥等方式对填土进行改良,但必须先实施试验路段,确定合适的施工工艺和质量保证措施,并经监理单位批准后方可正式实施。软土地基路段的月沉降量必须符合设计和规范要求(应保证连续2个月的月沉降量小于5mm,软基沉降必须由第三方进行监测),否则不得进行路基交验。一、路床顶面验收程序(一)路面施工单位进场后,业主、监理单位将督促路基施工单位及时与路面施工单位进行路床顶面交验。路基施工单位在自检合格的基础上,及时将复测结果上报监理单位,监理单位复核无误后,组织路基、路面施工单位进行路床顶

43、面交验工作。(二)要求用自重18t以上的重型振动压路机或拖碾在路基上慢速全幅振动碾压一遍后方可进行路床顶面交验。(三)路床顶面交验时,监理单位、路基和路面施工单位的技术负责人及设计代表必须同时参加。复测过程中发现问题,应按规范要求处理到位。路床顶面交验合格资料必须经路基施工单位、路面施工单位、监理单位三方当场书面确认,并及时归档。(四)若路基、路面为同一施工单位,路床顶面交验仍须按规定程序进行。施工单位在自检合格的基础上,将复测结果上报监理单位,由监理单位逐一检测,在检测结果符合设计及规范要求后,经双方书面确认,并将资料及时归档。(五)路床顶面交验完成后,必须报经质监站抽检并认可合格后,方可开

44、始路面施工。二、路床顶面验收内容及要求路床顶面交验分为两部分,第一部分为填方和挖方路基的交验,第二部分为桥梁(含通道等)的交验。(一)填、挖路基交验1、线形和外形尺寸:线形控制应根据设计提供的导线点,在加密后用全站仪检测路基中桩是否偏位;对主线及主线渐变段、互通区匝道按每10m一处检测几何尺寸是否合格。2、纵断面高程:严格控制路基顶面高程,水准点高程应闭合,精度必须满足规范要求。单幅路基每20m检测一个断面,每个断面每5m检测一处,主线渐变段、互通区匝道高程检测频率应加密。3、平整度、横坡:平整度用三米直尺按规范要求逐段检测;对填方路基、主线弯道路段、互通区匝道的横坡及边坡坡率应重点检测。4、

45、弯沉值:弯沉检测前,应对全线路基进行一次全面检查,“弹簧”路段必须进行换填。凡是路基弯沉值超标的路段,必须由路基施工单位进行处理,经重新检测合格后方可交验。5、压实度:路面施工单位应按规范及设计要求进行压实度检测。对压实度达不到要求的路段,要求路基施工单位进一步碾压,直至达到要求。6、路基排水:要对路基排水系统设置情况进行检查。特别是对挖方路段及隧道进出口边沟深度、超高路段横向排水及中央分隔带排水情况进行重点检查,确保排水通畅。7、桥台台背填筑:台背填筑应采用透水性材料填筑,填筑与碾压必须符合设计要求,对于缺少透水性材料、压实困难的台背应采用固化结合料进行填筑、碾压。路面施工单位在填挖路基交验

46、完成后,要对路基、路面排水系统的衔接进行检查,并提出建议,确保路面层间水顺利排除。(二)桥梁(含通道)交验桥梁(含通道)交验时,总体质量应符合设计及规范要求,并重点检查桥面系质量:1、平整度:平整度用三米直尺检测,平整度达不到要求的部位,必须进行抛丸或打磨至合格为止。2、纵面高程:主要检测搭板及桥面的纵断高程。3、横坡:对水泥砼桥面的横坡,主线弯桥、互通区匝道桥应重点检测。4、水泥砼铺装层:(1) 铺装层厚度及砼强度应满足规范及设计要求。(2) 路基、路面施工、监理单位必须对桥面铺装裂缝情况进行逐跨步行检查,对长度超过50cm或宽度超过0.2mm的裂缝应进行取芯分析原因并进行相应处理(对浅表性

47、的收缩裂缝,应进行环氧树脂灌缝处理,裂缝情况严重路段要求返工处理),对进行过返工处理的桥梁必须重新进行交验工作;桥面连续设置应满足规范和设计要求。铺装层砼表面要求先进行精铣刨处理,再用抛丸机对露白(未铣刨)的部分进行处置,以确保与沥青面层联结成整体。具体铣刨方案必须报监理工程师和业主审批(隧道内水泥混凝土路面也采用这种方案进行处理)。5、整体式连续箱梁:对不设水泥砼桥面铺装层的整体式连续箱梁,交验时应对桥面平整度、横坡、排水系统进行重点检查,达不到设计要求的须制定专题处理方案进行处理。顶板砼表面同样要求进行抛丸处理,以确保与沥青面层连接成整体。6、桥面排水:桥面排水系统应完善,铸铁管泄水孔顶标

48、高应略低于水泥砼铺装层,超高路段中分带泄水孔应考虑排除沥青路面层间水,并注意靠近伸缩缝处的排水情况,对于不符合要求的应进行处理。交验过程中应加强桥面积水情况的检查。7、伸缩缝预留槽:应对伸缩缝预埋钢筋位置、间距、高度、数量、规格进行全面检查,及时将伸缩缝槽区部位及板缝内的杂物清理干净,在板缝内填塞泡沫板,铺垫12层土工布,以防止混凝土浆液渗入板缝;为防止因梁板伸缩造成混凝土起拱,槽区两侧也应垫泡沫板,泄水孔用土工布包裹碎石进行填实,伸缩缝预留槽及时用低标号的砼浇筑至水泥桥面同样高程,浇筑前原则上不得压弯预埋钢筋。第四节 审查原材料储备计划一、路面施工单位和监理单位应对提供路面集料的生产企业的进行严格考察,仔细筛选,确保所提供的集

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1