l[安徽]实验检测综合楼桩基础施工组织设计.doc

上传人:本田雅阁 文档编号:2046990 上传时间:2019-02-08 格式:DOC 页数:127 大小:1.07MB
返回 下载 相关 举报
l[安徽]实验检测综合楼桩基础施工组织设计.doc_第1页
第1页 / 共127页
l[安徽]实验检测综合楼桩基础施工组织设计.doc_第2页
第2页 / 共127页
l[安徽]实验检测综合楼桩基础施工组织设计.doc_第3页
第3页 / 共127页
亲,该文档总共127页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《l[安徽]实验检测综合楼桩基础施工组织设计.doc》由会员分享,可在线阅读,更多相关《l[安徽]实验检测综合楼桩基础施工组织设计.doc(127页珍藏版)》请在三一文库上搜索。

1、synchronous backup software does not respond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be supported across networ

2、k segments. In accordance with the above requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial investment company limited

3、 factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cause of security, as well

4、 as previous security experience, combined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65M x 234

5、.24M rectangular site. 1.2 scope for such dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory could not spend a great deal of manpower cost to post thr

6、ee steps, five steps and a whistle. As we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active solid border defense work. We recommend that you use infrare

7、d radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as

8、 video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevant int

9、ernational standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. Second, the design princip

10、les of the project design follows technology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. Design elements of the system is the system

11、atic, integrated and comprehensive; design has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy, used

12、 module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, for Ch

13、ina conditions and this project of features. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the system is the system used for various management levels, i

14、ts functions are configured to provide the user with comfortable, safe, fast and convenient to 3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-1998) 3.3, the code for engineering design of generic cablin

15、g system for city residential buildings (CECS/119-2000) 3.4, code for design of buildings and campus cable systems engineering (GB/T50311-2000) 3.5, the code for electrical design of civil buildings (JGJ/ T16-92) 3.6, the code for civil closed circuit monitoring TV system engineering technology (GB/

16、50198-94) 3.7, the types of system earthing and safety technical requirements (GB14050-93) 3.8, of the security engineering procedures and requirements (GA/T75-94) 3.9, the rules of security engineering acceptance (GA/T308-2001) 3.10, the industrial design of TV system code (GBJ 115) 3.11, the Secur

17、ity checks prevention system pass for graphics symbol (GA/74-94) 3.12, and fire linkage control equipment General technology conditions (GB 16806-1997) four, and system function and features in system both advanced, and practical, and mature, and reliable, and do system open, and can extended sex go

18、od, both investment reasonable, and benefits best of purpose, border security alarm system on site equipment for concentrated monitored, and control and management, makes these equipment to security, and reliable, and efficient to run, Maximize intelligent management role to create a safe, healthy,

19、comfortable and pleasant, and to improve the efficiency of a good environment and save energy, and reduce maintenance personnel. According to the projects environmental needs, and engagement functions to establish the project boundary security alarm system, in a Word, this boundary is a project of t

20、he security alarm system is highly automated and efficient hospitality for a comfortable, convenient, and highly secure environment. Five, scheme design based on design principles, design specifications and according to international and domestic standards, and in accordance with user needs, as well

21、 as drawings and related information provided by, and joining the projects actual situation and future development trends, border security alarm systems for the project design. 5.1. principle of system and burglar alarm system from detectors, regional directors, and the alarm control centre composed

22、 of three parts. Its principles as in the following chart: detectors for burglar alarm system is inside and outside the building in key areas, important places, protection, when the probe to illegal invaders, the signal transmitted to the alarm control: sound and light alarm, display address, about

23、the person on duty after receiving the alarm, take measures according to the situation, to control the development of the situation. Anti-theft alarm system alarm function in addition to the above, there is linkage function. Such as: open the alarm light (including infrared lamp), interactive audio

24、and video matrix controller, switch on the alarm camera on the spot, matrix controller TV series of control: monitor displays an image, video footage, multimedia controller automatic or human . 8.1 the “three guarantees“ period warranty 1, warranty 1) service period from date of acceptance of engine

25、ering, a 1-year warranty, warranty processing is completed within the response time is 48 hours. 2) service within the warranty period, we all accessories unconditional warranty for all equipment and replacement, all parts for all equipment (including all machine parts) maintenance and parts are fre

26、e and provide on-site cleaning, test equipment services. During the warranty period, all equipment repair and maintenance services for on-site services, the resulting fees are waived. Free for system expansion, upgrade-related technical support services. 3) system warranty contact information to pro

27、vide users with free technical advice, detailed answer to any problem in the system, to “ask, answers will come detail.“ In the users if unable to solve the problems by themselves, directly by telephone, fax, Internet, letter, such as getting in touch with my company (which calls for 24-hour service

28、), we will respond within 4 hours, consultation with users to solve the problem. 2, service response times, we are committed to the warranty period on the operation of the system on a regular basis carry out comprehensive inspections, found that the problem solving on the spot, 目目 录录 第一章第一章 编制说明编制说明

29、1 一、本施工组织设计的编制依据一、本施工组织设计的编制依据 _4 二、本施工组织设计参照的有关规范、标准二、本施工组织设计参照的有关规范、标准 _4 第二章第二章 工程概况工程概况6 一、工程概况一、工程概况 _6 二、工程特点二、工程特点 _6 三、工程总体目标三、工程总体目标 _9 第三章第三章 施工部署施工部署100 一、施工管理一、施工管理 _10 二、施工组织二、施工组织 _11 三、施工方案确立三、施工方案确立 _14 四、主要施工方法及总体设想四、主要施工方法及总体设想 _15 五、施工准备五、施工准备 _16 六、劳动力组织与投入计划六、劳动力组织与投入计划 _17 七、主要

30、施工机械配备与进退场计划七、主要施工机械配备与进退场计划 _18 八、周转材料投入计划八、周转材料投入计划 _19 第四章第四章 施工总平面布置施工总平面布置及及管理管理21 一、布置一、布置原原则则 _20 二、施工总平面布置二、施工总平面布置 _20 三、施工临时用电布置三、施工临时用电布置 _20 四、施工临时用水布置四、施工临时用水布置 _25 五、施工场地临时排水五、施工场地临时排水 _26 六、场内道路六、场内道路 _26 七、施工现场平面管理七、施工现场平面管理 _27 第五章第五章 施工进度计划与管理施工进度计划与管理29 一、施工进度计划说明一、施工进度计划说明 _29 二、

31、施工进度计划管理二、施工进度计划管理 _29 synchronous backup software does not respond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be

32、supported across network segments. In accordance with the above requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial inv

33、estment company limited factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cau

34、se of security, as well as previous security experience, combined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory

35、boundary: 540.65M x 234.24M rectangular site. 1.2 scope for such dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory could not spend a great deal of ma

36、npower cost to post three steps, five steps and a whistle. As we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active solid border defense work. We recomme

37、nd that you use infrared radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electron

38、ic equipment as well as video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with refere

39、nce to the relevant international standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. Sec

40、ond, the design principles of the project design follows technology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. Design elements of t

41、he system is the systematic, integrated and comprehensive; design has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex str

42、ong, upgrade easy, used module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simp

43、le, easy master, for China conditions and this project of features. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the system is the system used for vario

44、us management levels, its functions are configured to provide the user with comfortable, safe, fast and convenient to 3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-1998) 3.3, the code for engineering design of generic cabling system for city residential buildings (CECS/119-2000) 3.4, code for design of buildings and campus cable systems engineering (GB/T50311-2000) 3.5, the code for electrical desi

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1