u西安咸阳国际机场高速公路施工组织设计方案.doc

上传人:本田雅阁 文档编号:2053617 上传时间:2019-02-08 格式:DOC 页数:13 大小:217.51KB
返回 下载 相关 举报
u西安咸阳国际机场高速公路施工组织设计方案.doc_第1页
第1页 / 共13页
u西安咸阳国际机场高速公路施工组织设计方案.doc_第2页
第2页 / 共13页
u西安咸阳国际机场高速公路施工组织设计方案.doc_第3页
第3页 / 共13页
亲,该文档总共13页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《u西安咸阳国际机场高速公路施工组织设计方案.doc》由会员分享,可在线阅读,更多相关《u西安咸阳国际机场高速公路施工组织设计方案.doc(13页珍藏版)》请在三一文库上搜索。

1、laparici de tot tipus de casos, la caiguda daccident de sha produt. (9) on la feina nivells sense operacions de installacions de protecci de seguretat, treballadors de la construcci han de dur un cintur o arnesos de seguretat (dispositius de protecci de seguretat sha comprovat abans del seu s), el c

2、intur de seguretat o cordes de seguretat utilitzats han de complir els principis dalta i baixa. No hi ha deures don ls de productes de protecci, per evitar accidents de caiguda passi. 6, prevenci dintoxicacions, asfxia accident les mesures preventives per evitar lenverinament, millor protecci de la

3、seguretat i la salut dels treballadors, les mesures es formulen. (1) quan la profunditat de la pila s ms de 5 M, el dia abans de linici de ls detector de gas per a la detecci de gasos txics, confirmar que el gas dins del forat correctament, abans dobra menor; ha de tenir 15min noms desprs de la vola

4、dura de fum forat es permeten les operacions. (2) lalberg est estrictament prohibit en lemmagatzematge de substncies txiques i qumics. (3) s interior lestabliment independents Calefacci, no fan de flama oberta denllumenat, Calefacci, per evitar accidents que requereixen denverinament de monxid de ca

5、rboni independents de lhabitatge Cambra climatitzada amb foc de carb, estufes ha de ser situats a lexterior. (4) al menjador de lautoritzaci de sanejament, personal de cuina ha de tenir un certificat de salut i certificat mdic per treballar. Botiga daliments crus i cuinats ha de ser processat per se

6、parat. for safety and security, set up security groups, head of the work group is responsible for the operations of safety and security, each team full-time safety officer is responsible for the daily life and production security. 成 . Good dining, on the implementation of special detection system fo

7、r procurement of food, preventing the purchase of spoilage and poisonous food to prevent food poisoning accident occurred. Pay attention to personal and environmental hygiene, to beautify the environment, clean air, beautiful life, environment, prevent the spread of infectious disease epidemics and

8、ensure attendance to ensure production safety. 8.4.4.4 from management to ensure safety punishment detailed rules for the implementation of a safety. To comply with policies, laws and regulations, observe labour discipline, according to safety regulations and technical specifications for constructio

9、n requirements for the construction, maintenance of production and life order, maintain social order there is significant merit in team and individual Award respectively; otherwise, penalties, to ensure production safety. 8.4.4.5 construction site safety protection 1) temporary facilities security p

10、rotection a. construction of establishing traffic signs and lighting, vehicle and pedestrian traffic safety. B. underground structure within the construction site, the underground pipeline,de la carretera, la construcci de canonada de desgus: a causa del drenatge canonades incrustat en tons, dacord

11、amb les especificacions pertinents i tenint en compte els requeriments raonables de tecnologia de la construcci, ha de fer el tractament subgrade i la zona dexcavaci desprs de lelevaci de lexcavaci a la ubicaci correcta i construcci de clavegueram. Per tant, lexcavaci de terra-Roca i terrapl caixa d

12、e la carretera, un acord raonable dobres de drenatge es va convertir en la clau per a la realitzaci del projecte suau. Pre-construcci, noms accelerar lexcavaci del moviment de terres per a subgrade i terrapl, per les obres de drenatge i posterior construcci crear cares, per tal de garantir la supera

13、ci de la totalitat del projecte. Aiges avall de nou lautor: segons els requeriments de tecnologia de construcci de drenatge, seguint lordre codi dincrustaci desprs de la primera per garantir la construcci de bon drenatge temporal durant lorganitzaci de construcci, perode de construcci en el seu conj

14、unt. Desplegament raonable de moviment de terres: aquesta Enginyeria per la construcci de processament i subgrade moviment de terres excavaci Enginyeria volum gran, base suau en la plena segons situaci especfica lloc, pargraf de cincia dividit construcci, arranjaments raonables distribuci de movimen

15、t de terres i nombre de moviment de terres abandonades exterior, festa pot camp redut dins el moviment de terres de repetici cavat omple de treball, per accelerar el moviment de terres subgrade i processament de subgrade de progrs de construcci, des del principi a les condicions de construcci creada

16、 de canonada drenatge, garantiran Enginyeria tot ordenat per. Canonades, paisatgisme, illuminaci denginyeria, construcci, Enginyeria de transport: a causa del disseny de drenatge del sistema utilitzant combinat, fora de la reserva a drenatges vial la canonada transversal ms significatiu impacte cons

17、trucci i Enginyeria de drenatge de la canonada creuant, i collectors enterrats profund,. 7.4.1 fase de preparaci construcci (1) construcci de lestaci de lloc: Oficina de lsing, va crear camps i altres installacions temporals, posant en el poder de lloc de construcci, corredor daigua. (2) lestablimen

18、t de la construcci de xarxa de control de topografia, organitzacions mesurar golfes i mesurar els resultats reportats pel Comissionat, els propietaris. (3) gran quantitat dexcavaci de subgrade, la identificaci de lrea de descrrega, per a la paret de Roca es prepara b. (4) mbit construir 2.4m blaus m

19、etllics de paret, noms reservat per a la construcci de treballs amb interseccions trnsit transversal, estrictament segons lorganitzaci de trnsit dels unitats organitzatives i residents al llarg del trnsit original. 7.4.2 etapes de construcci de moviment de terres de aquesta enorme quantitat de movim

20、ent de terres de lenginyeria, construcci sDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my com

21、pany 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementatio

22、n, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the batte

23、ry indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security me

24、asures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 mil

25、lion Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.

26、12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equiva

27、lent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -Th

28、e two management system for improvement. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines

29、, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspect

30、ion, safety production month, day supervision of production safety and the Olympic Games and other西安咸阳国际机场专用高速公路N2合同段 施工组织设计01.公共设施施工组织设计西安咸阳国际机场高速公路施工组织设计方案目 录第一部分 施工组织设计文字说明1一、编制依据、原则和范围二、设备、人员动员周期和设备、人员、材料运到现场的方法三、施工组织机构的主要职责、范围四、主要工程项目的施工方案、施工方法五、各分项工程的施工顺序六、保证工程质量和工期的措施七、重点(关键)和难点工程的施工方案、方法及其措施

31、八、冬季和雨季施工安排九、质量、安全及环保体系第二部分 施工总平面布置图43第三部分 主要分项工程施工工艺框图44第四部分 分项工程生产率和施工周期表64第五部分 施工总体计划表65第六部分 分项工程进度率计划(斜率图)66第七部分 工程管理曲线 67第八部分 附图第一部分 施工组织设计文字说明一、编制依据、原则和范围(一)、编制依据1、西安咸阳国际机场高速公路施工图(第一卷第十卷)。2、西安咸阳国际机场高速公路土建工程工地现场勘察情况。3、交通部颁布的有关设计、施工、验收规程及有关法律、法规和我单位的质量手册等有关文件。4、我单位现有的技术、设备、人员素质、管理模式、施工经验、科技进步和施工

32、能力等施工要素情况。(二)、编制原则1、遵守招标文件的各项条款、各种规范和设计图纸的原则。2、统筹安排,突出重点、难点项目,优化施工方案,合理安排施工进度计划,合理配置施工所需劳、材、机具设备,实行标准化作业,组织连续均衡生产,做好工序衔接,紧张有序,加强施工监控,确保工程质量。3、突出应用新技术、新工艺、新设备、新材料,提高施工的机械化作业水平,积极应用先进的科技成果,创造精品工程。4、运用现代科学技术,采用先进可靠的安全保证措施,确保生产安全,做到文明施工。5、根据我企业的实力,考虑工程地质、工程特点和工期要求,坚持“项目法”施工,采用机械作业,确保工程质量及安全,保证按期竣工。(三)、编

33、制范围按照招标文件的划分,本施工组织设计针对西安咸阳国际机场高速公路土建工程第2标段(施工里程为: K1768.2K5184.2)主线桥梁和互通工程。二、设备、人员动员周期和设备、人员、材料运到现场的方法(一)、设备人员动员周期1、设备:施工机械及试验、测量设备按投标书承诺的施工进度计划安排及时进场。一个月内,主要施工机械及试验、测量仪器等第一批施工机械、设备进场。进场机械及设备状态良好,整洁一新,并做好开工前保养;进场后,及时做好试验和测量仪器的检验标定工作,确保施工时的正常使用。2、人员:根据施工组织设计安排,提前组织拟参与本工程施工的各类专业人员参加施工前的培训工作。使参与施工的人员了解

34、本工程的特点和技术质量要求。接到中标通知书后,立即组织施工人员进场,组建成立项目经理部。在半个月内,项目的主要管理人员、工程技术人员全部到位。各工区的专业管理人员、技术工人及劳务人员按计划陆续到位。在一个月内完成前期的临建。(二)、设备、人员及材料运到现场的方法设备、人员和主要材料运到现场的原则是根据工程进度计划需要和监理工程师的指令,分期分批进入现场并根据具体情况随时加以调整。1、设备:施工机械、设备由我局统一协调调配,以汽运的方式运抵施工现场。2、人员:工程管理人员及工程技术人员由我局按照投标书承诺,统一委派。专业施工作业队由我局内部统一组织调度。3、材料:项目经理部下设材设部,对本工程的

35、材料统一管理。按材料进场计划,及时组织材料货源进场,并做好原材的检验工作,保证材料质量。施工材料主要采用汽运的方式运到施工现场;钢材、水泥等专用材料与经评审合格的专业厂家直接签订购销运输合同,以保证材料的供应和质量。三、施工组织机构的主要职责、范围(一)、施工组织机构的组成根据本标段的工程特点、工程量及工期要求,我局本着以计划管理为主线,以重点、难点工程控制为重点,以质量、进度、安全、环保工作为中心的指导思想开展工作,组建成立“西安咸阳国际机场专用高速公路N2合同段项目经理部”, 负责本标段的施工管理指挥工作,项目经理部下设六部一室。 项目经理部组织机构框图项目经理项目书记副经理总会计师总经济

36、师总工程师质检部办公室材设部劳财部经营部安保部工程部测量组试验室桥梁六工区桥梁五工区桥梁四工区桥梁三工区路基工区桥梁一工区桥梁二工区(二)、项目经理部主要职责、范围1、项目经理为该标段工程总负责人,负责该标段的全面管理,是安全、质量、进度、文明施工等各方面第一责任人。2、项目书记负责政治思想工作、廉政建设、征迁协调。3、项目总工程师负责工程质量控制、施工技术方案的确定与落实、新技术新方案的推广、试验检测等工作。4、工程部负责施工技术、施工方案编制、资料管理等工作,下设试验室和测量组两个职能部门。5、质检部负责工程质量控制管理、质量保证体系的运行实施及分部、分项工程的验收及质量评定工作。6、经营

37、部负责计量支付、合同管理、计划统计、成本核算等工作。7、材设部负责工程物资材料的采购、贮存、发放、使用管理及机械设备管理调度、维修、保养等工作。8、劳财部负责人事、财务、资金管理、人员工资等工作。9、安保部负责施工的治安保卫和施工安全管理。10、办公室负责行政、后勤、环保和文明施工等工作,同时设专职协调员,负责征地搬迁、地方关系协调等。11、路基工区负责路基工程、鱼塘处理、支架地基处理的施工。12、桥梁一工区负责第41#53#三联双幅、第66#72#两联双幅的施工。13、桥梁二工区负责第53#63#三联双幅、第63#66#一联双幅的施工。14、桥梁三工区负责第72#83#三联双幅的施工。15、

38、桥梁四工区负责第83#97#四联双幅、AD匝道的施工。16、桥梁五工区负责第97#110#四联双幅、BC匝道的施工。17、桥梁六工区负责预制箱梁部分的上、下部施工。 四、主要工程项目的施工方案、施工方法(一)、工程概况1、概述西安咸阳国际机场专用高速公路路线顺接西安市城市快速干道朱宏路,起于与西安绕城高速公路交叉而设的朱宏路互通式立交处,上跨郑西铁路客用专线和渭河,在K3+347.467处设北环路互通式立交,由庞李村上塬,下穿宝鸡峡干渠,在马家堡附近设马家堡互通式立交,设线于机场东线二级汽车专用公路南侧,下穿咸宋公路和两条跑道之间的联络道后,在K19+534.744处设机场东互通式立交,终点顺

39、接机场东进场道路,路线全长20.570Km。主要控制点为漕运明渠、郑西铁路客用专线、渭河、机场东线。主要河流:本项目上跨渭河,渭河是黄河最大的支流,渭河洪水位是本项目的主要控制高程影响因素之一。2、技术标准主线采用八车道高速公路标准建设,设计速度为120公里/小时,路基宽度42.0米,桥梁与路基同宽。全线公路桥涵设计的汽车荷载标准为公路级,其他技术指标符合部颁公路工程技术标准(JTJB01-2003)规定值。3、地形、地貌机场专用高速公路总体地势呈西北高,东南低,N2标位于渭河冲击平原,渭河南岸地势平坦开阔,微向渭河倾斜,海拔高程368.0376.4米。4、区域地质在渭河河漫滩为全新冲击黄土状

40、土、亚粘土、亚砂土、细砂、中砂、粗砂,含有少量的砾石。5、水文与气候项目区为渭河断陷盆地的一部分,蕴藏着丰富的地下水,渭河南岸高漫滩地下水及渭河河水可用于施工。项目区域属暖温带半湿润大陆性季风气候,四季分明,气温温和,雨量适中,多年平均气温13.3,极端最高气温45.2,极端最低气温-20.6,一月平均气温为1.5,七月平均气温为30.6,年平均降水量582毫米,且50%以上集中在当年79月,全年平均无霜期219天。6、主要工程量N2合同段起讫桩号为: K1768.2K5184.2,建设里程3.416公里。桥涵工程:主线桥3416米/1座。交叉工程:互通立交1处。北环路互通立交匝道全长2581

41、.4米。路基特殊处理:8%灰土12.343千立方米,3%灰土49.701千立方米,砂砾13.313千立方米。路基土石方:填方51.944千立方米,挖方8.499千立方米。路基防护:三维土工网垫11.803千平方米。桥梁工程:匝道桥735.1米/4座,匝道收费站1处。(二)、施工准备1、施工队伍准备中标后,7日内项目经理立即组织3名项目主要负责人、10名技术员和50名工人进入现场,10台套设备(推土机、挖掘机、运输车辆、发电机等)同时到场,开始修建驻地、平整场地、修筑临时道路、架设施工电线路、铺设施工水管路、解决施工通讯问题并进行开工前施工调查等工作。参战施工队伍其余人员立即进行入场前培训,随后

42、,迅速完成施工队伍调遣。2、复测和控测及时与业主及设计单位联系办理交接桩,进行线路导线控制点及中线高程复测,核定桥涵位置,并测放护桩及路基边桩,引入施工用水准点,为工程顺利开工做好准备。3、技术准备积极与业主联系,备齐施工文件、图纸。组织施工技术人员认真熟悉招标文件、设计文件,进行图纸审核,编制实施性施工组织设计,砼配合比设计与试配等。4、设备物资准备 根据工程进度计划需要及时调配数量充足、先进适用的各类机械设备及测量、试验、检测仪器。进场前对各种机械及仪器设备认真进行维修、保养,以满足工程需要。做好各种仪器检验标定工作。开展材料料源调查、取样试验,对材料的来源、产量、质量及价格严格把关,选取

43、最佳供货单位,签订供货合同。5、征地拆迁及施工用电积极协助业主与地方政府联系,尽早办理施工用地的征用及拆迁手续。办理工程临时用地相关手续。申请用电,办理相关手续,施工前期自备发电。(三)、临建 从临建开始创建文明工地,严格遵守陕西省交通厅发布的陕西省公路建设文明工地标准的要求。项目经理部:驻地设在西一村村口,离主线1.1公里处,租用一幢四层楼作项目经理部,其中第一、二层设各业务办公室以及会议室;第三、四层用作职工宿舍,职工食堂采用彩钢搭设;该处交通便利,便于管理。配一台320kw发电机备用。工地中心试验室(面积150)设在项目部内,分办公室(30)、土工室(20)、混凝土室(30)、水泥分析室

44、(20)、力学室(20)和标养室(50)。配一台320kw发电机备用。预制厂(渭河南岸):预制厂设在K4+100处主线左侧,占地48亩,主要预制预应力混凝土箱梁和主桥(110#墩153#墩)钢筋加工,预制厂设150T龙门吊1套(箱梁出坑)、15T小龙门2套(拆装模板、钢筋安装、混凝土浇筑)。支设两台砼拌合站(HZS60、HZS120各一台)备用,确保在商品砼供应出现意外情况时,工程能顺利按计划进行。 另外在渭河北岸(咸阳境内)设混凝土拌和站(备用),占地15亩。钢筋加工场:本标段现浇箱梁部分共设钢筋加工场三处,第一处在K2+200左侧,占地54亩(用作钢筋加工、模板制作、支架堆放);第二处在北

45、环互通东北面(即K3+500右侧)占地15亩;第三处渭河南大堤北侧(K3+650左侧),占地15亩。用电:在主线K2+200、K3+500 、K4+100各装1000KVA变压器1台;同时每个点配备1台320KW发电机作为备用电源。用水:所有生活用水和施工用水采用自打水井取水; 便道:在主线左侧外沿路线修建纵向临时便道,同时修建到桥墩位及与当地路网相连接的横向临时便道。施工便道宽度为6.5m,采用40cm厚5%灰土基层,尚稷路以南采用碾压混凝土面层,尚稷路以北用碎石+石屑罩面处理,同时加强养护管理,做到“晴天不扬尘,雨天不泥泞” 确保施工机具车辆通行;在渭河松软河滩和主河道用钢管桩、贝雷片修建

46、施工平台,并与渭河便桥(三标修建)接通, 确保施工机具车辆到达河道上桥梁施工点位。施工布置,详见表2施工总平面布置。(四)、路基工程1、路基填方工程1)、施工方案本标段路基工程E匝道以填方为主,共有路基填方51.944千立方米,除部分利用方外,其它从K8+600和K9+800调入土源。2)、施工方法(1)、准备工作施工前详细调查红线范围内现况地下、地上物,与产权人和产权单位办理有关手续并确定拆移实施方案。在施工中要高度重视并配合有关单位做好拆移和保护工作。(2)、测量放线对给定的桩位首先进行线路闭合及高程的校核与拴桩,在确认无误后方可按施工各部位的要求进行放线测量。对高填方等处,测量控制点要加

47、密,路基施工时应加强测量控制点的保护和测量复测工作,在雨季和返春季节应及时监测导线控制点的变化。(3)、路基土方填筑A、路基填料 现场勘察取土,通过试验确定填料类别,提供检验数据。B、试验段选择适当路段作为试验路段进行试验填筑,分层按不同种类填料进行压实试验,确定机械最佳组合方式、碾压速度、碾压次数、工序、松铺厚度、填料的最佳含水量等技术参数,据此指导进行全面施工。C、填筑填筑严格按水平分层、方格网控制进行填筑施工。施工工艺如下:a、测量放线:按设计标准施放中心线、边线(施工填筑边线为设计边线外侧加50)和高程控制桩,并撒白灰线方格网,填筑范围外两侧做好排水沟以防雨水浸泡作业面。b、修正下承层:为保证路基稳定,对于主线及匝道位于农田内路段,先清除地