《双排落地式钢管脚手架专项施工方案》.doc

上传人:本田雅阁 文档编号:2062470 上传时间:2019-02-09 格式:DOC 页数:38 大小:1.70MB
返回 下载 相关 举报
《双排落地式钢管脚手架专项施工方案》.doc_第1页
第1页 / 共38页
《双排落地式钢管脚手架专项施工方案》.doc_第2页
第2页 / 共38页
《双排落地式钢管脚手架专项施工方案》.doc_第3页
第3页 / 共38页
亲,该文档总共38页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《《双排落地式钢管脚手架专项施工方案》.doc》由会员分享,可在线阅读,更多相关《《双排落地式钢管脚手架专项施工方案》.doc(38页珍藏版)》请在三一文库上搜索。

1、*建设工程有限公司*工程双排落地式钢管脚手架专项施工方案编制单位:*建设工程有限公司编制人:*审核人:*审批人:*日 期: 年 月 日目录1.编制依据12.工程概况13.施工部署13.1.组织机构13.2.设计总体思路13.3.劳动力准备23.4.材料准备23.5.机具准备33.6.技术准备44.脚手架构造要求44.1.总的设计尺寸44.2.纵向水平杆44.3.横向水平杆54.4.脚手板54.5.立杆64.6.连墙件64.7.门洞64.8.剪刀撑74.9.扣件74.10.基础74.11.上人斜道75.脚手架的搭设和拆除施工工艺85.1.落地脚手架搭设施工工艺85.2脚手架的拆除施工工艺116.

2、目标和验收标准127.安全文明施工保证措施137.1.材质及其使用的安全技术措施137.2.脚手架搭设的安全技术措施147.3.脚手架上施工作业的安全技术措施147.4.脚手架拆除的安全技术措施157.5.文明施工要求157.6.应执行的强制性条文178.落地式扣件钢管脚手架计算书198.1依据规范:198.2计算参数:20附图1:外脚手架平面布置图32附图2:落地架部份立面图33附图3:落地架基础、连墙件、上人斜道示意图34附图4:门洞加强示意图35附图5:施工井架口外架大样图36Opinions and suggestions on the partys mass line educati

3、onal practiceAccording to the central and provincial, municipal unified deployment, according to municipal Party committee about carrying out the partys mass line educational practice activity in the citys implementation opinions, the spirit of the partys mass line educational practice activities fr

4、om 20* in January to 99 months, carried out at all levels of departments and directly affiliated institutions and grass-roots party organizations. According to my actual County, the county to carry out the education practice put forward the following implementation opinions.First, the overall requir

5、ementsCounty county education practice to the eighteen Party of eight, the spirit of the the third Plenary Session of the 18th CPC Central Committee as the guidance, conscientiously implement the spirit of general secretary Xi Jinping book series of important speech, earnestly implement the Central

6、Committee really, opinions and advice , party implementing the guiding ideology of opinions to determine the objectives and requirements, step method, in accordance with the look in the mirror, dress up, wash bath, cure treatment, the general requirements of for the people pragmatic honest people as

7、 the theme, in carrying forward the spirit of Zhuanglang Zhuang, improve their work style, service to the masses of the people, the foundation of consolidating grassroots, promote transformation across efforts, to further implement the central eight regulations and The opposition party and governmen

8、t austerity waste regulations , double section provincial regulations, municipal provisions of the twelve plan and the implementation measures for on improving the work style of close ties with the masses law, highlight style building, carry out the whole wind spirit, resolutely oppose formalism, bu

9、reaucracy, hedonism and wasteful extravagance to solve the problems, Party members and cadres of the style and the masses of people strong, the Ministry of Party members and cadres to further improve their thinking and understanding, to further change the style of the wind, the masses to close, hone

10、st and pragmatic people honest image to further establish the foundation to further reinforce the basic level. Style of the building of the new results to promote the construction of a powerful force of the county and the ecological culture of the county and county construction.In educational practi

11、ce activities of the unit is mainly: the county and below county departments under the organs, enterprises and institutions directly under the township, street, and community, village, non-public economic organizations, social organizations and other grass-roots organizations. Agencies and branches,

12、 each single unit, follow the rules on internal institutions. Educational practice with step by step.To adhere to the county leadership, leadership and leading cadres to focus on outstanding catch to directly contact the service of the masses of law supervision departments and window units, service

13、industry, educational practice, pay attention to grasp the heavy towns, streets and villages, community education activities and the masses of grassroots groups in close contact to strengthen, and the majority of Party members, cadres and the mass line line Marx doctrine view of the masses and the p

14、artys education.Always speak seriously as a basic attitude, adhere to positive education, to carry out criticism and self criticism group, adhere to the pragmatic, more emphasis on leadership, pay more attention to the layers of the demonstration, more focus on the four winds, solve the problem, pay

15、 more attention to open the door, the participation of the masses, pay more attention to the classification guidance. Orderly, pay more attention to the cooperation and cohesion driven, more strict requirements on injection, really supervision practice, ensure education practice is not empty is not

16、empty is not partial, not as a mere formality.Two, the key point of the taskThe main task of the countys education practice is to seize against four wind this focus on centralized solve outstanding problems asked County, township leadership and leading cadres of the four winds, the disadvantages of

17、the style, scale behavior to a large scale investigation, overhaul, cleaning greatly. At the same time, respond to the concerns of the masses, safeguard the interests of the masses, pay attention to solve practical problems, solve the people around the unwholesome tendencies especially on eat, take

18、the card, Yong lazy luxury, extravagance and waste fees, privileges and other issues, timely and effective, without any discount to solve, to improve the style of real implementation of the requirements of real to the grassroots, real let group Benefit the public.(a) focus on solving the four winds

19、outstanding issuesThe central and provincial requirements, the county leadership and leading cadres of key performance concept is not correct, do not dare to play, to engage in image project, political project, a leadership guide, a set of ideas, orders and prohibitions, and a policy, there are coun

20、termeasures county. The units directly under the heavy focus on solving Yung lazy drag, buck passing skin, work is not implemented, the service is not active. The dynamic problem of law enforcement and supervision departments and window units, service industry mainly solve the door hard, ugly face,

21、something difficult, and arbitrary charges, fines, levies, and breach of privilege, chinakayao, not the problem of law. The township, street The collar of leading bodies and leading cadres to solve key does nottheir own conditions to develop the correct road, the maximum to avoid investment risk, ga

22、in profit.(three) vigorously promote the brand. To establish brand awareness, awareness of the use of brand, brand value, brand acquisition performance, enhance the competitive strength. Concentrated manpower, careful planning, packaging and publicity of a number of unique, market influence and cove

23、rage of the brand, the implementation of key breakthroughs, to enhance the competitive strength, walking business road the competition of alienation and characteristics, the pursuit of stability and development of the market.(four) to promote the integration of resources. To further broaden their ho

24、rizons, effective integration of resources within the group, the city resources, other industries and regional resources, mutual trust, mutual benefit, seeking win-win principle, in the framework of national policies and regulations, strict inspection and argumentation, legal consultation, examinati

25、on and approval procedures, strict regulation of economic activities, attract injection the social investment to the industry group, to achieve leveraging the development, ensure that the value of state-owned assets.(five) to strengthen the construction management personnel. Strengthen the managemen

26、t of education and training of cadres and workers of the existing business, firmly establish the concept of the market, enhance the sense of crisis to adapt to market competition, the sense of urgency, improve the ability to respond to market competition, improve management and operation of the mark

27、et. At the same time, according to the need of industrial development, vigorously the introduction of high-quality management management personnel, and strive to build a high-quality professional management team, hard work, and promote the entire workforce knowledge structure, age structure, structu

28、re optimization and upgrading ability, enhance core competitiveness, adapt to the need of market competition.(six) seriously study the policy for policy. Serious research about social support the development of cultural undertakings in the country and the XX policy, especially the policy of industri

29、al development, financial investment policy, financial policy and tax policy, and actively seek policy, projects and funds, enterprise and industry group mission to promote leapfrog development.1.编制依据 建筑施工扣件式钢管脚手架安全技术规范(JGJ 130-2011); 建筑施工安全检查标准(JGJ59-2011); 建筑施工高处作业安全技术规范(JGJ80-91); 本工程施工图纸和投标文件; 本

30、工程施工组织设计。2.工程概况1.本工程位于位于*大道旁。建筑高度为30.35m;地下1层,层高3.9m;地上7层,首层层高4.20m,二层层高3.60m,三至七层层高均为3.20m;结构形式为框架结构,基础类型为独立基础。根据本工程实际情况,外脚手架形式采用落地式双排钢管脚手架,搭设高度32m,外架搭设严格按照现行建筑施工扣件式脚手架安全技术规范(JGJ 130-2011年修订版)搭设。3.施工部署3.1.组织机构外架搭设由工长负责组织实施,其他人员配合。外架所需材料、劳动力计划均由外架工长负责编制,材料员、劳资员负责组织进场。技术交底工作由工长负责。3.2.设计总体思路 根据工程特点,采用

31、落地式双排钢管脚手架,架体在主体阶段主要用于安全防护,装修阶段既用于装修施工,也兼作安全防护。3.3.劳动力准备搭设阶段共需架子工8名,维护阶段共需架子工2名,拆除阶段共需外架工15名。所有架子工均需持证上岗。架子工由劳务公司提供。搭设阶段安排2名测量放线工配合。3.4.材料准备 所有钢管质量应符合碳素结构钢(GB/T700)中Q235-A级钢的规定,及直缝电焊钢管(GB/T 13793)、低压流体输送焊接钢管(GB/T 3092),并有产品出厂合格证。扣件采用可锻铸铁制作的扣件,其质量应符合国家标准钢管脚手架扣件(GB15831)的规定,并有出厂合格证。扣件在螺栓拧紧扭矩达65Nm时,不得发

32、生破坏。 脚手架配件数量匡算: 扣件式钢管脚手架的杆件配备数量需要一定的富余量,以适应构架时变化需要,因此按匡算方式来计算;根据脚手架立杆数量按以下公式进行计算: L -长杆总长度(m); N1 -小横杆数(根); N2 -直角扣件数(个); N3 -对接扣件数(个); N4 -旋转扣件数(个); S -脚手板面积(m2); n -立杆总数(根) n=210; H -搭设高度(m) H=32; h -步距(m) h=1.8; la-立杆纵距(m) la=1.6; lb -立杆横距(m) lb=0.80; 长杆总长度(m) L =1.1 32(210 + 1.60 210/1.80 - 21.6

33、0/1.80)=13900; 小横杆数(根) N1 =1.1 (32 /1.80 2 + 1) 210 = 2285;直角扣件数(个) N2 =2.2 (32/ 1.80 + 1) 210 = 8676;对接扣件数(个) N3 =13900/ 6.00 = 2317;旋转扣件数(个) N4 =0.3 13900/ 6.00 = 696;脚手板面积(m2) S = 1.1 ( 210-2) 1.60 0.80=292.86。根据以上公式计算得长杆总长13900m;小横杆2285根;直角扣件8676个;对接扣件2317个;旋转扣件696个;脚手板292.86m2。3.5.机具准备搭、拆架子所需机具

34、主要有架子扳手、吊线,由架子工自备。项目部应配备如下检查工具(可借用,但应符合要求):名称数量用途扭力扳手1把检查扣件拧紧力度游标卡尺1把检查焊接钢管外径和壁厚、外表面锈蚀深度塞尺1把检查钢管两端面切斜偏差钢卷尺1把检查钢管弯曲程度和搭设中的距离或长度水平尺1把检查水平杆高差角尺1把检查剪刀撑与地面的倾角注:建筑施工扣件式钢管脚手架(JGJ 130-2011)中提及的钢板尺用钢卷尺代替。3.6.技术准备施工前应按要求向架子工作好技术交底,三级教育和安全技术交底,对于身体健康有问题的不能用工,年龄偏大的也不能用工,人员变动后应重新交底。4.脚手架构造要求4.1.总的设计尺寸外架的立杆纵距1.6m

35、,横距0.8m(可平铺三块竹串脚手板,每块竹串脚手板宽250mm),步距1.83m,外排架栏杆步距0.915m(安全网规格为6m1.8m,拉紧后比1.8m略宽,如取步距1.8m,安全网不易拉紧,显得松垮,不美观,故按现场经验取1.83m)。外排架内侧设全封闭密目安全网(每10cm10cm,2000孔)。4.2.纵向水平杆纵向水平杆要求设置在立杆内侧,长度不宜小于三跨。接长宜使用对接。对接扣件应交错布置,两根相邻纵向水平杆的接头不宜设置在同步或同跨内,不同步或不同跨两个相邻接头在水平方向错开的距离不应小于500mm,各接头中心至最近主节点的距离不宜大于纵距的1/3。接长如采用搭接,搭接长度不应小

36、于1m,应等间距设置3个旋转扣件固定。本工程使用竹串脚手板,纵向水平杆应作为横向水平杆的支座,用直角扣件固定在立杆上。4.3.横向水平杆作业层上非主节点处的横向水平杆,宜根据支承脚手板的需要等间距设置,最大间距不应大于纵距的1/2。横向水平杆两端均应采用直角扣件固定在纵向水平杆上。横向水平杆靠墙一端外伸长度不小于200mm,以满足铺一块脚手板的要求。靠墙一端离外墙装饰面距离不大于100mm。4.4.脚手板作业层脚手板应铺满、铺稳,离开外墙装饰面100mm。脚手板应设置在三根横向水平杆上。脚手板的铺设可对接平铺,也可搭接铺设,搭接时接头必须支在横向水平杆上。作业层端部脚手板探头长度取150mm,

37、板长两端应与支承杆可靠固定。作业层必须铺设脚手板,并要求底层铺设一层脚手板,每隔10米铺设一层脚手板。4.5.立杆内立杆距外墙边300mm。每根立杆底部应设置垫板及方木(方木规格:90501500mm,垫板规格183001500)。相邻立杆的对接扣件不得在同一高度内。下端第一根立杆交错用6m杆和3m杆相互错开。4.6.连墙件采用刚性连墙件,连墙件水平方向三跨设置一个点,高度方向每楼层设置一道,相互错开成梅花形。做法详见附图。在钢管接料平台处和施工电梯接料平台必须在梁板上预埋钢管拉结点,施工电梯接料平台和周转材料接料平台的架体不能和外架连接,单独搭设。本工程连墙件拉结在预埋在砼楼板的钢管上,采用

38、扣件连接的方式。连墙杆内外两个受力方向均应采用不少于两个直角扣件固定。4.7.门洞脚手架应在安全通道出入口处设置门洞。门洞处挑空一根立杆。门洞处的空间桁架,除下弦平面外,应在其余5个平面内设置斜腹杆。斜腹杆采用旋转扣件固定在与之相交的横向水平杆的伸出端上,旋转扣件中心线至主节点的距离不宜大于150mm。安全通道处的门洞两侧立杆应为双管立杆,副立杆高度应高于门洞口1至2步(外排架2步,内排架1步)。安全通道、卸料平台、施工电梯通道不得与脚手架杆件连接。4.8.剪刀撑剪刀撑在外侧立面的两端设置,并应由底到顶延续搭设。斜杆与地面的倾角按45控制。每道剪刀撑宽度不应小于4跨。剪刀撑跨越立杆的最多根数为

39、7根。剪刀撑杆件油红白相间警示色。剪刀撑斜杆的接长宜采用搭接。搭接长度不应小于1m,应等间距设置3个旋转扣件固定。4.9.扣件螺栓拧紧扭力矩不应小于,且不应大于。主节点处固定横向水平杆、纵向水平杆、剪刀撑等用的直角扣件、旋转扣件的中心点的相互距离不应大于150mm。对接扣件开口应朝上或朝内。各杆件端头伸出扣件盖板边缘的长度不应小于100mm。4.10.基础采用素土夯实后浇筑100mm厚C20砼硬化后加设垫板的作法,土方回填时土质符合设计要求,并分层夯实,每层厚度不超过200mm,确保脚手架基础部下沉。4.11.上人斜道因室内楼梯受施工影响不能正常使用,在架体外指定位置(位置要求在施工现场决定)

40、搭设临时简易上人斜道。斜道坡度不宜大于1:3。设两侧扶手栏杆。扶手栏杆高1.2m。每踏步用两条短钢管搭设斜道底部,绑扎上脚手板预防坠物伤人,平台上满铺脚手板,并设踢脚板扶手拉杆拉设安全网。5.脚手架的搭设和拆除施工工艺5.1.落地脚手架搭设施工工艺 (1)工艺流程 在牢固的地基弹线、立杆定位摆放扫地杆小横杆,并与立杆和扫地杆扣紧装第一步大横杆并与各立杆扣紧安第一竖立杆并与扫地杆扣紧装扫步小横杆安第二步大横杆安第二步小横杆加设临时斜撑杆,上端与第二步大横杆扣紧(装设连墙件后拆除)安第三、四步大横杆和小横杆安装连墙件接立杆加设剪刀撑铺设脚手板、绑扎防护及档脚板、立挂安全网。 定距定位:根据建筑楼层

41、结构水平投影轮廓,用钢尺现场测量,定出内外立杆位置,并做好标记。 (2)搭设及要求 1)基础及底座要求:基础采用胶合模板,尺寸为18*300*1500mm。模板垫片 外架立杆基础示意图 2)施工现场采用明沟排水,截面为200300mm,排水沟距外架1米处,环绕外脚手架布置。施工现场临时排水图 3)当立杆基础不在同一高度上时,必须将高处的纵向扫地杆向低处延长两跨与立杆固定,高低差不应大于1m,靠边坡上方的立杆轴线到边坡的距离不应小于500mm(如下图)。 图4-5 纵、横向扫地杆构造 4)外脚手架搭设,立杆、外侧大横杆钢管油漆全部为黄色,所有钢管应涂防锈漆,面涂黄色油漆; 5)本工程双排落地脚手

42、架剪刀撑随立杆、纵横向水平杆同步搭设,用通长剪刀撑沿架高连续布置,全部采用单杆通长剪刀撑;(详见附图2) 剪刀撑每3步6跨设置一道,斜杆与地面的夹角在4560。斜杆相交点处于同一条直线上,并沿架高连续布置,剪刀撑的一根斜杆扣在立杆上,另一根扣在小横杆伸出的端头上,两端分别用旋转扣件固定,在其中间增加3个扣节点。所有固定点距主节点距离不大于150mm;剪刀撑采用搭接接长。搭接长度不小于1m。用三个扣件等距布置,剪刀撑下端要落地。并由底至顶连续设置。剪刀撑钢管油漆为黄黑相间; 6)安全色踢脚板由九夹板或其他材料制作,涂黄黑油漆,高度200mm,黄黑漆颜色相间300mm,警示带为黄黑相间的刚性挡板,

43、油漆颜色要鲜亮。 7)脚手架处于顶层连墙点之上的自由高度不得大于6m; 8)脚手板要求铺平铺稳,应用粗扎丝绑扎稳定,脚手板每隔三层铺设;使用竹串板(或跳板)的立杆、纵横向杆件布置剖面示意图竹串脚手板(或跳板)铺设示意图 9)脚手架的上下通道:脚手架需要设置安全马道,马道宽度不小于1m,马道的立杆、横杆间距应与脚手架相适应,基础按脚手架要求处理,立面设剪刀撑;人行斜道小横杆间距不超过1.5m;马道上满铺脚手板,板上钉防滑条;设置护身栏杆,上部护身栏杆1.2m,下部护身栏杆距脚手板0.6m。(详见附图3) 10)通道口搭设 脚手架应在安全通道出入口处设置门洞。门洞处挑空一根立杆。门洞处的空间桁架,

44、除下弦平面外,应在其余5个平面内设置斜腹杆。斜腹杆采用旋转扣件固定在与之相交的横向水平杆的伸出端上,旋转扣件中心线至主节点的距离不宜大于150mm。 安全通道处的门洞两侧立杆应为双管立杆,副立杆高度应高于门洞口1至2步(外排架2步,内排架1步)。具体详见附图4。5.2脚手架的拆除施工工艺拆架程序应遵守由上而下,先搭后拆的原则,一般的拆除顺序为:安全网拦杆脚手板剪刀撑横向水平杆纵向水平杆立杆。不准分立面拆架或在上下两步同时进行拆架。做到一步一清、一杆一清。拆立杆时,要先抱住立杆再拆开最后两个扣。拆除纵向水平杆、斜撑、剪刀撑时,应先拆中间扣件,然后托住中间,再解端头扣。所有连墙杆等必须随脚手架拆除

45、同步下降,严禁先将连墙件整层或数层拆除后再拆脚手架。分段拆除高差不应大于2步,如高差大于2步,应增设连墙件加固。应保证拆除后架体的稳定性不被破坏,连墙杆被拆除前,应加设临时支撑防止变形、失稳。当脚手架拆至下部最后一根长钢管的高度(约6m)时,应先在适当位置搭临时抛撑加固后再拆连墙件。工字钢拆除时,上部架体已经全部拆除完毕后方可进行工字钢的拆除作业,禁止拆除工字钢后再进行架体拆除。 6.目标和验收标准1、建筑施工安全检查标准(JGJ59-2011)表3.0.4-1总分10分,要求基本符合要求,达到8分以上。检查和验收应符合建筑施工扣件式钢管脚手架(JGJ 130-2011)要求。2、检查与验收标

46、准(1)脚手架及其地基基础应在以下阶段进行检查与验收:基础完工后及脚手架搭设前;作业层上施加荷载前;每搭设完1013m高度后;达到设计高度后;遇有六级大风或大雨后;停用超过一个月。(2)脚手架使用中,应定期检查下列项目:杆件的设置和连接,连墙件、支撑等的构造是否符合要求;地基是否积水,底座是否松动,立杆是否悬空;扣件螺栓是否松动;高度在24m以上的脚手架,其立杆的沉降与垂直度的偏差是否符合有关规范规定;安全防护措施是否符合要求;是否超载。(3)进行脚手架检查、验收时应根据下列技术文件进行:符合(2)、(4)、(5)的规定;施工组织设计(方案)及变更文件;技术交底文件。(4)脚手架搭设的技术要求、允许偏差与检验方法,应符合有关的规定。(5)安装后的扣件螺栓拧紧扭力矩应采用扭力扳手检查,抽样方法应按随机分布原则进行。抽样检查数目与质量判定标准,应按有关规定确定。不合格的必须重新拧紧,直至合格为止。7.安全文明施工保证措施7.1.材质及其使用的安全技术措施