pt松源珠宝首饰品建设项目施工组织设计.doc

上传人:本田雅阁 文档编号:2131173 上传时间:2019-02-20 格式:DOC 页数:127 大小:1.07MB
返回 下载 相关 举报
pt松源珠宝首饰品建设项目施工组织设计.doc_第1页
第1页 / 共127页
pt松源珠宝首饰品建设项目施工组织设计.doc_第2页
第2页 / 共127页
pt松源珠宝首饰品建设项目施工组织设计.doc_第3页
第3页 / 共127页
亲,该文档总共127页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《pt松源珠宝首饰品建设项目施工组织设计.doc》由会员分享,可在线阅读,更多相关《pt松源珠宝首饰品建设项目施工组织设计.doc(127页珍藏版)》请在三一文库上搜索。

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .松源珠宝建设项目松源珠宝首饰品建设项目施工组织设计马鞍山天立建设有限责任公司二八年八月二十五日目 录第一章 编制说明 -.4.第二章 工程概况

24、 -.6.第三章 工程项目管理体系 -.9.第一节 项目组织机构 - -.9.第二节 主要人员岗位职责 -.10.第四章 工程管理目标-.13.第五章 施工部署 -.16.第一节 施工总体安排 -.16.第二节 工程质量检验 -.19.第三节 过程控制点设置 -.20.第四节 专题施工方案 -.20.第五节 文件和资料的控制管理- -.21.第六章 施工准备及资源调配计划 -.22.第一节 施工准备 - -.22.第二节 施工协调管理-.23.第三节 劳动力调配计划 -.24.第四节 施工机具设备调配计划-.26.第五节 工程材料进场计划 -.27.第七章 施工现场平面布置- -.29.第一节

25、 施工现场总平面布置的原则-.29.第二节 施工临时用水用电 -.30.第三节 施工总平面布置图 -.32.第八章 土建工程主要施工技术方案 -.32.第一节 测量工程 -.32.第二节 基础工程 -.36.第三节 模板工程 -.42.第四节 钢筋工程 -.47.第五节 混凝土工程 -.52.第六节 砖砌体工程 -.54.第七节 外脚手架施工方法 -.58.第八节 抹灰工程 -.68.第九节 油漆涂料工程 -.71.第十节 楼地面地砖 -.73.第十一节 屋面工程 -.75.第十二节 水泥砂浆楼地面 -.78.第十三节 塑钢门窗安装 -.79.第九章 水电安装施工方案 -.81.第十章 工程质

26、量保证措施-.101.第一节 工程质量管理体系 - -.103.第二节 工程质检人员配备 -.103.第三节 施工质量保证技术措施 -.104.第十一章 进度计划及工期保证措施-.115.第一节 施工进度计划 - -.115.第二节 施工工期保证措施 -.166.第十二章 安全施工措施-.117.第一节 安全管理体系 -.117.第二节 安全管理活动 -.117.第三节 安全保证措施 -.120.第十三章 文明施工措施 -.127.第一节 总体要求 -.127.第二节 生产区文明施工 -.128.第三节 生活、办公区文明施工要求 -.130.第十四章 回访回修措施 -.132.第一章 编制说明

27、主要编制依据:1、安徽安博建筑设计有限公司土建、安装等施工图纸。2、招标文件和我公司投标文件的要求。3、现场实际情况;马鞍山市建筑行业管理的有关规定;我公司的技术、质量、机械设备等情况及管理制度。4、我公司根据GB/T19001-2000 idt ISO9001:2000标准建立的质量管理体系,以及相应的质管理手册等体系文件。5、马鞍山天立建设有限责任公司施工工艺标准。6、国家和行业现行的相关施工规范、标准及有关规定。如:建筑工程施工质量验收统一标准(GB50300-2001)混凝土结构工程施工质量验收规范(GB50204-2002)砌体工程施工质量验收规范(GB50203-2002)建筑地基

28、基础施工质量验收规范(GB50202-2002)屋面工程施工质量验收规范(GB50207-2002)防水工程施工质量验收规范(GB50208-2002)建筑地面工程施工质量验收规范(GB50209-2002)建筑给水排水及采暖工程施工质量验收规范(GB50210-2001)建筑电气安装工程施工质量验收规范(GB50303-2002)建筑装饰装修工程施工质量验收规范(GB50210-2001)通风与空调工程施工质量验收规范(GB50243-2002)建筑防腐蚀工程施工及验收规范GB50212-91建筑防腐蚀工程质量检验评定标准GB50224-95火灾自动报警系统施工及验收标准GB50166-92

29、起重设备安装工程施工及验收规范GB50278-98建筑机械使用安全技术规程(JGJ33-2001)施工现场临时用电安全技术规范(JGJ46-88)建筑施工安全检查标准(JGJ59-99)建筑施工高处作业安全技术规范建设工程安全生产管理条例建设工程文件归档整理规范GB/T50328-2001等等。第二章 工程概况本工程为马鞍山松源珠宝首饰有限公司投资兴建的绿松石饰品项目,该项目位于马鞍山市经济开发区太白大道与西塘路交叉口西南角。共有2栋四层钢筋混凝土框架产品组装楼(4#,5#)、2栋二层钢筋混凝土框架职工食堂(6#,7#)、1栋五层钢筋混凝土框架办公楼(8#),总建筑面积10964,其中4、5#

30、楼均为2826,6、7#楼各为600,8#楼为4112(其中地下为1025)。4、5#楼建筑高度总高为19.5米;6、7#楼为12.6米;8#楼为21.45米。该工程由安徽安博建筑设计有限公司设计,化工部马鞍山地质工程勘察院勘察。工程设计按六度抗震设计,丙类设防。框架抗震等级为四级。建筑物场地类别为类,建筑耐火等级按二级设计,建筑安全等级为二级。该项目0.000m相当于黄海高程(4#楼为9.05m;5#楼为8.95m;6#楼为8.75M;7#楼为8.65m;8#楼为8.55m).本工程建筑、结构设计特点具体如下表所示。结 构 特 征名 称内 容基 础基础为钢筋混凝土独立承台。承台底标高为-1.

31、55米。承台垫层砼强度等级为C10,承台砼强度等级为C25。上部结构该工程4、5#楼主体结构为4层,6、7#楼主体结构为2层,8#楼主体结构为5层,地下结构为1层。4、5、8#楼一层层高为4.5m,二层及以上为3.6m,6、7#楼标准层高为3m。框架梁主要截面尺寸为梁宽250 mm,梁高为350800 mm不等。楼板厚度为100mm。墙 体0.000m以下采用MU10烧结标准砖; 0.000m以上采用MU5烧结多孔破砌筑.120墙后砌,采用MU10烧结多孔砖砌筑.砂浆: 0.000m以下M5.0水泥砂浆砌筑; 0.000m以上M5.0混合砂浆砌筑砼强度等级基础及上部结构均为C25钢筋保护层(单

32、位:)1、基础:承台302、梁、柱:303、板::20建 筑 特 征名 称内 容外 装 饰外墙面主要以花岗岩(石材)饰面为主。内 墙内墙面水泥砂浆刷白色乳胶漆。水泥砂浆踢脚线。天 棚天棚面水泥石灰砂浆刷白色乳胶漆。楼 地 面1、防滑地砖楼地面(厨房、卫生间)。2、其余房间10厚地砖地面。门 窗外门采用铝合金框夹丝安全玻璃;外窗为塑钢窗,中空玻璃。屋 面4厚SBS防水卷材及60厚聚乙烯泡沫板。本工程给排水系统包括生活给排水系统、消防栓给水系统。其中排水系统采用废污水合流制,经化粪池处理后排入城市下水管道。生活给水系统供水管DE50采用PP-R给水管及配件。生活排水系统采用芯层发泡聚氯乙烯管及配件

33、。消防管材为热镀锌钢管。明露室外管道要做50mm厚离心玻璃棉管壳,外包铝皮。本工程电气系统包括照明系统、防雷及接地系统、宽带网及电视电话弱电系统等部分。配电采用三相四线制,进线电缆埋地敷设,照明部分为UPVC可增塑阻燃管案敷设。防雷接地采用联合接地方式,按三级防雷建筑物设防,接地电阻小于1欧;防雷引下线利用结构柱内靠外侧2根16(或更大)主筋将其通长焊连引下。区域火灾报警控制系统采用箱式挂墙安装,手动报警按钮暗装,线路穿钢套管暗敷在结构墙体内。第三章 工程项目管理体系第一节 项目组织机构一、本工程的施工组织机构设置本工程施工中,我公司项目部严格按照公司根据ISO9001:2000国际标准建立的

34、质量管理体系并按项目法组织施工,实行项目经理责任制,建立以项目经理为核心的项目管理班子,由于该工程工期紧、任务重、质量要求高,公司将挑选施工实践经验丰富、组织管理能力强的各专业骨干管理人员成立“工程项目部”,项目经理将对质量、工期、安全、成本及安全文明施工全面负责。公司还成立领导牵头有关部门负责人组成的“工程领导小组”,协调处理项目施工过程中遇到的重要事情。二、项目部主要管理人员情况见下表主要施工人员配备表姓 名岗 位岗位资格证职 称 邰传宝项目经理二级建造师 高级工程师刘佩君技术负责人高级工程师高级工程师魏兆金质 检 员质检员上岗证工 程 师曹应柱施 工 员施工员证工 程 师杨大荣安 全 员

35、安全员上岗证工 程 师李 维统 计 员统计员上岗证经 济 师陈国琴会 计 员会计员上岗证会 计 师石仁华见证取样见证取样员上岗证助理工程师第二节 主要人员岗位职责1、项目经理项目经理是公司总经理在该工程上的委托人,负责施工现场的生产、安全、经营、质量等管理工作。严格履行工程施工合同,确保工程质量、安全、进度要求;领导、监督并保证质量体系的有效运行,确保质量目标的实现;组织制定项目部工程质量和安全生产责任制等内部管理制度,明确岗位职责并督促检查,同时接受公司职能部门的管理。统筹劳动力、物资和施工机具等资源,做好工程质量、安全、进度和成本控制;负责施工过程质量控制,过程检验和试验、最终检验和试验,

36、工程防护和交付以及服务的实施;负责组织新员工上岗培训,组织全体员工质量安全学习,确保各类施工人员持证上岗;负责使顾客满意及施工后的保修服务。负责与甲方、监理、土建及其他专业施工队伍的配合与协调。2、技术负责人协助项目经理贯彻实施公司质量管理体系;负责现场的技术、质量管理和相关质量记录的收集整理文件。负责编制项目质量计划、施工组织设计和各类专题施工方案。负责组织项目的图纸预审、会审、技术变更工作,分部分项工程施工前进行技术交底。负责或参与对不合格品的评审、处置及制定相应的纠正、预防措施。负责“四新”技术的应用和推广工作。负责项目部数据分析的应用、指导工作。负责项目部计量管理工作。参与现场标识管理

37、工作。负责特殊过程的确认和控制;负责与业主、监理单位、设计院等部门联络处理有关问题;负责施工过程质量控制,过程检验和试验、最终检验和试验,工程防护和交付以及服务的实施;负责工程资料收集、整理、报验工作等。3、 质检负责人负责监督项目部贯彻实施质量管理体系和质量改进措施。负责对特殊过程进行技术复核。负责分项工程检验和质量等级核定,参与分部工程和工程最终预验工作。对施工过程中质量进行监督、检查,严格把好质量安全检验关,确保按照图纸、规范、批准的方案及工艺文件进行施工。 负责对工程潜在不合格因素的预防和纠正措施的跟踪检查。参与图纸预会审和工程质保资料、验收资料的管理工作。参与工程回访回修工作。组织编制施工质量计划及质量检验计划。负责进货物资的质量检查和验证。负责室内环境检测检验工作管理。负责协调、联络第三方检验和专家监督工作。4、安全负责人协助项目经理负责现场安全管理工作,对安全管理直接责任。参与本工程安全管理制度的制定并具体负责组织实施。检查落实各项安全管理措施及安全技术交底措施。在安全管理上独立行使职权,每天检查巡视施工现场,随时制止任何安全违章行为。负责安全统计报表的编制及上报。执行有关安

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1