qi永川至泸州一级公路(永川段)路面工程施工组织设计.doc

上传人:本田雅阁 文档编号:2131897 上传时间:2019-02-20 格式:DOC 页数:108 大小:858.01KB
返回 下载 相关 举报
qi永川至泸州一级公路(永川段)路面工程施工组织设计.doc_第1页
第1页 / 共108页
qi永川至泸州一级公路(永川段)路面工程施工组织设计.doc_第2页
第2页 / 共108页
qi永川至泸州一级公路(永川段)路面工程施工组织设计.doc_第3页
第3页 / 共108页
亲,该文档总共108页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《qi永川至泸州一级公路(永川段)路面工程施工组织设计.doc》由会员分享,可在线阅读,更多相关《qi永川至泸州一级公路(永川段)路面工程施工组织设计.doc(108页珍藏版)》请在三一文库上搜索。

1、procs de taller dhores de treball per a la distribuci dassignaci. 105th semi-acabat es refereix a determinats processos de producci i magatzem de producte qualificat enviar semi, per no encara fa hora perqu els productes bsics, productes intermedis del procs ha de continuar. Taller dirigit per quan

2、la fabricaci semielaborats, a anar a travs de la requisitioning procediments. Delegat unitats processament trmits semielaborats, semielaborats ha, al mateix temps cal definir major principal extern semielaborats. 106th articles semielaborats es basa en semi-acabat declaraci final equilibri de clcul

3、semielaborats cost cost real pot ser incompleta tancament i costos reals que tamb pot prendre a prop. 107th es refereix a lacabat ha completat el procs de producci i s lacceptaci demmagatzematge estndard i tcnic condicions segons les condicions estipulades en el contracte, per ordre, o es poden vend

4、re com a producte de la mercaderia, incloent-hi el segent: 1, s de la matria de lempresa fabricaci productes elegibles i productes deficients; 2, dacceptar la altra transformaci de productes i el processament per altres unitats amb fix; 3, pot ser extern venda de productes de qualitat inferior; 4, s

5、olia venda semielaborats. 108th per tal de reforar la gesti de productes acabats, assegurant magatzem de producte acabat de qualitat, el nombre correcte, acabat i han de ser certificats i estricte implantaci del sistema acabat. 109th acabat en comptabilitat general major: reflexionar i controlar els

6、 canvis a inventaris elaborats i equilibri, el conjunt de tresoreria el acabat, un general compte comptable, productes acabats rebre, enviament, dipsit de la Comptabilitat General major. Quan va acabar demmagatzematge de productes, es basa en la llista de productes, gesti completat detall producte,

7、acreditat del dbit compte productes acabats, venuts o utilitzant quan acabi, li atribueix al compte de productes acabats Crdit, dbit equilibri, real cost de fabricar inventaris. 110th segons el tipus de producte, mida i ubicaci, conjunt major de productes acabats de major de productes acabats acabat

8、 mtodes de comptabilitat del bns desglossament compte sub-major igual com material de comptabilitat. Secci de 111th acabat de cost unitari, calculat utilitzant el mtode didentificaci especfica, la fbrica seran no arbitrriament canviar per aquest mtode. 112th gesti dinventaris, dirigir segells, regul

9、ar o no regular inventari, inventari de la Tresoreria activament ha organitzar departaments pertinents per tal de garantir el partit, seu inventari s el material principal de productes, productes acabats, inventari de bns semielaborats, per determinar el nombre real al disc, danys, prdues i acumulac

10、i dinventaris de manera oportuna i tractades de manera oportuna. 113 fbrica per millorar la gesti destocs i control, en la mesura possible, reduir la inversi de capital i consum, en el menor tempsestndard i grau de compactaci estndard de subgrade amb compactaci pesats capes, estndard de compactaci d

11、e el subgrade i embalatge dels requisits fora mostrats a la taula segent: projectes categoria carretera-profunditat (cm) embalatge la intensitat mnima (CBR, %) Grau de subgrade de compactaci (pesat, %) Dimetre mxim dembalatge (cm) ple llit subgrade a la carretera 0-30 8 10 carretera 5 30-80 96 10 de

12、 terrapl carretera sota 80 4 de 94 150 plenes i tallar la carretera-0-30 8 96 10 la protecci de m. tenint en compte els terrenys a ambds costats de rpid desenvolupament en protecci de talussos subgrade en principi, sadhereixen a la protecci ecolgica, suport lleuger com un suplement. Aquest projecte,

13、 terrapl i excavaci pendent dissenyat segons lespecificaci, excavaci profunda o alta individual recolzat per retenir llum. (5) carretera disseny daquesta carretera carretera flexible estructura, carretera de vehicles de motor i el carril mixt carretera estructura capa total gruix 91cm; s lestructura

14、 de capa respectivament de Shang per Xia seguit per: 4cm gra gruixut tipus asfalt formig (AC-13) + 6 cm de gruix en lasfalt de gra tipus concret (AC-20) + 14 cm gra gros gran dimetre asfalt estable de grava (LSM-30) + 12 cm gruix distribuci nivell grava 40 cm gruix Petar material base + 15 cm de gru

15、ix de capa de grava coix de cribratge no. Lestructura de paviment de dalt a baix: Arena gruixuda capa en pors 6cm 3 cm + 15 cm, gruixut classificada. 1.3 aquesta secci de drenatge de la carretera dissenyar sistemes de drenatge amb combinen sistemes de clavegueram, dimetre de la canonada drenatge per

16、 D300-D2200mm. Canonades de drenatge D300-d1000mm fet de canonada (HDPE) de polietil de alta densitat (GB/T19472.2-2004), tapa superior 5M, SN 8KN/m2, canonada que cobreixen ms de 5M de menys de 6m, SN 10KN/m2, interfcie utilitzada en tots els connexi elctrica de fusi; Dimetre s superior a la fuga d

17、e D1000mm amb tubs de formig armat, canonada de canonada embolcall 6m nivell de formig armat, base de formig de 180 graus, tub superior-sl 6m tub de formig armat de dos nivells, base de formig de 360 graus, interfcie segons construcci 06MS201-1. Nmero 2, els principals projectes: (1) lexcavaci subgr

18、ade de moviment de terres: 753702m 3 caixa de la carretera: omplir de subgrade 48054m 3: rebliments 57707 m3 de runa: 8477 M3 estany dragatge i omplert: obres de drenatge (2) 13617m 3: canonada de polietil (HDPE) D300 alta densitat: canonada de polietil (HDPE) 969m D400 alta densitat: 303m. Granit C

19、urbstone 27cmx12cm:13080 m 30cmx12cm:3488 Shi m Shi 40cmx12cm:7412 m, Ma Shiping, pedra collocaci de costat de granit C20:4366 m maons permeables de paviments de formig: 15696 m 2 3, les caracterstiques de construcci: (1) estat del paisatge, els turons, parcel dhortalisses, creixement vegetatiu, ms

20、gran que 15 cm sn un munt de arbres, trasplantat o caiguts perIn order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety a

21、nd reduce losses principle, according to the local conditions, make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of President security work leading group. The head teacher to the leadership team is responsible for, implementatio

22、n of the accountability system. 2, school monthly student knowledge about safety education, education should be diversified in the form every safety education for students of classes per week should be targeted. To carry on emergency issues dealing with education in General, self-help and mutual res

23、cue knowledge. Emergency calls (such as 110, 119, 122, 120, and so on) use common sense in education. 3, the establishment of major accident reporting system. School students report major accident within an hour of education; student run and disappearances to report; report of the accident to a writ

24、ten report in triplicate, a correctional centre, a police station, a township peoples Government shall not conceal the accident. 4 week, teachers are on duty system, establish and improve the leadership values; strengthen the education, management of teaching activities in schools to ensure normal t

25、eaching order; responsible for school safety leadership always maintained close contact and district police stations, canvassing support from the police station on school safety and help. 5, strengthening teachers moral education, establish a dedicated love, improving education quality, observe the

26、students psychological changes at any time and take preventive measures, no corporal punishment and covert corporal punishment on students, student out of the classroom, schools may not be. 6, units or departments use student Street propaganda or participate in the celebrations, as well as participa

27、ting in other social work, without approval of the Correctional Centre, school principals consent, without organization. Without the approval of relevant departments, may organize students to participate in fire fighting, disaster relief and so on. 7, schools should educate students to obey the scho

28、ol rules and regulations, on time, on time home to prevent accidents. 8, school to school inspections on a regular basis, found hidden in time, and in severe cases, it is hard to eliminate immediately closed, and reported to the local peoples Government, education, and rule of law section. 9, the sc

29、hool should always check the internal walls, retaining walls, ponds, railings, handrails, doors, Windows, staircases and a variety of sports, extracurricular activities, facilities such as fire safety, infrastructure security, unsafe facility to immediately repair and demolition to ensure that teach

30、ers and students work, learn, live venues and facilities are safe and reliable. Song Lin Xiang Liu Jia ping elementary school March 2016 song Lin Xiang Liu Jia ping primary school fire safety systems to enhance fire safety, protection of public property and the life and property safety of teachers a

31、nd students, school fire safety into day-to-day management, is developing the following fire safety system. 1, strengthen fire safety education of the whole school. According to the requirements of the Fire Services Act, so that everyone has of keeping fire control safety, protecting fire control fa

32、cilities, fire prevention, reports of fire永川至泸州一级公路(永川段)路面工程 施工组织设计目录一、 编制说明1二、工程概况2三、施工准备工作安排6四、施工方案及工艺技术方案12五、现场平面布置方案84六、施工计划进度安排87七、资源供应计划89八、施工组织与劳力结合94九、技术组织保证措施95十、质量管理和质量控制组织保证措施98十一、安全组织保证措施102十二、文明施工与环境保护105procs de taller dhores de treball per a la distribuci dassignaci. 105th semi-acabat

33、 es refereix a determinats processos de producci i magatzem de producte qualificat enviar semi, per no encara fa hora perqu els productes bsics, productes intermedis del procs ha de continuar. Taller dirigit per quan la fabricaci semielaborats, a anar a travs de la requisitioning procediments. Deleg

34、at unitats processament trmits semielaborats, semielaborats ha, al mateix temps cal definir major principal extern semielaborats. 106th articles semielaborats es basa en semi-acabat declaraci final equilibri de clcul semielaborats cost cost real pot ser incompleta tancament i costos reals que tamb p

35、ot prendre a prop. 107th es refereix a lacabat ha completat el procs de producci i s lacceptaci demmagatzematge estndard i tcnic condicions segons les condicions estipulades en el contracte, per ordre, o es poden vendre com a producte de la mercaderia, incloent-hi el segent: 1, s de la matria de lem

36、presa fabricaci productes elegibles i productes deficients; 2, dacceptar la altra transformaci de productes i el processament per altres unitats amb fix; 3, pot ser extern venda de productes de qualitat inferior; 4, solia venda semielaborats. 108th per tal de reforar la gesti de productes acabats, a

37、ssegurant magatzem de producte acabat de qualitat, el nombre correcte, acabat i han de ser certificats i estricte implantaci del sistema acabat. 109th acabat en comptabilitat general major: reflexionar i controlar els canvis a inventaris elaborats i equilibri, el conjunt de tresoreria el acabat, un

38、general compte comptable, productes acabats rebre, enviament, dipsit de la Comptabilitat General major. Quan va acabar demmagatzematge de productes, es basa en la llista de productes, gesti completat detall producte, acreditat del dbit compte productes acabats, venuts o utilitzant quan acabi, li atr

39、ibueix al compte de productes acabats Crdit, dbit equilibri, real cost de fabricar inventaris. 110th segons el tipus de producte, mida i ubicaci, conjunt major de productes acabats de major de productes acabats acabat mtodes de comptabilitat del bns desglossament compte sub-major igual com material

40、de comptabilitat. Secci de 111th acabat de cost unitari, calculat utilitzant el mtode didentificaci especfica, la fbrica seran no arbitrriament canviar per aquest mtode. 112th gesti dinventaris, dirigir segells, regular o no regular inventari, inventari de la Tresoreria activament ha organitzar depa

41、rtaments pertinents per tal de garantir el partit, seu inventari s el material principal de productes, productes acabats, inventari de bns semielaborats, per determinar el nombre real al disc, danys, prdues i acumulaci dinventaris de manera oportuna i tractades de manera oportuna. 113 fbrica per mil

42、lorar la gesti destocs i control, en la mesura possible, reduir la inversi de capital i consum, en el menor tempsla seva aprovaci abans que es pot excavar. El projecte s un nou cam, especialment la terra excavaci una gran quantitat dexcavaci del sl-Roca de subgrade 753,000 plaa, excavaci de K0 + 440

43、, K1 130 K1 + 480, K1 + 920 i diversos turons forma conjunt. (2) a travs del reconeixement, camp trobat dins apilats gran de sl diversos omplir i pigment omplir sl i part demolici edifici escombraries, principal apilats a K0 060-K0 + 240 i K0 + 380-K0 + 520, seccions, segons a la prospecci mostren,

44、sobre el moviment principal de sl abandonat i planta arrels i escombraries edifici mixt format, apilades gruix per 1.2 m - 7 m, sobre sls omplir diversos, i pigment omplir sl i construcci escombraries necessitava tot excavat excepte Sinotrans. (3) el projecte s una carretera nova, especialment en le

45、xcavaci de terra una gran quantitat dexcavaci del sl-Roca subgrade 753,000 quadrats, plaa de K0 + 440, K1 130 K1 + 480, K1 + 920 i diversos turons forma conjunt, pla de construcci segmentar basat en les caracterstiques anteriors i raonable de treball. Intercalades amb trnsit simple poble al llarg de

46、 la K0 + 000-K1 secci 620, construcci de principi raonablement es poden per a la construcci de vorera de moviment de terra en lmbit per proporcionar condicions bsiques. 4, condicions de construcci (1) lloc visita les obres, s a prop desmerilat aigua, alimentaci, construcci segons circumstncies concr

47、etes, disposici raonable. (2) pot utilitzar carretera de poble existent en la construcci de principi, mecnica accs ms cmode, per desprs dentrar immediatament requerit per la pionera carretera-edifici en lmbit. (3) coordinaci s difcil per a la construcci de la canonada. El projecte s un nou projecte,

48、 ms metro aplicar la nova canonada integrat, principal terrapl, canalitzaci i canonada travessia construcci pertorbacions de laigua, gas s gran, amb moltes unitats de gesti de canalitzaci, construcci molt difcil. 5, Enginyeria dificultats, centrant-se en: (1) base flexible de control de tcniques de construcci clau en aquest disseny utilitza tecnologia nova de lestructura de paviment amb base flexible, que classificava base de grava, xip de sincronitzaci-quitr segellar, grava d

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1