sj下穿哈大客运专线框构桥施工方案.doc

上传人:本田雅阁 文档编号:2133980 上传时间:2019-02-20 格式:DOC 页数:125 大小:943.51KB
返回 下载 相关 举报
sj下穿哈大客运专线框构桥施工方案.doc_第1页
第1页 / 共125页
sj下穿哈大客运专线框构桥施工方案.doc_第2页
第2页 / 共125页
sj下穿哈大客运专线框构桥施工方案.doc_第3页
第3页 / 共125页
亲,该文档总共125页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《sj下穿哈大客运专线框构桥施工方案.doc》由会员分享,可在线阅读,更多相关《sj下穿哈大客运专线框构桥施工方案.doc(125页珍藏版)》请在三一文库上搜索。

1、2016 learning implement to tube main leaders topic seminar spirit counselling material 2016 learning implement to tube main leaders topic seminar spirit counselling material March 7, XI General Secretary to I province delegation participate in considered and published has important speech, on XXX pr

2、ovince people for China revolution victory and Socialist construction made of contribution give has certainly, on I province past five years implementation focus strategy, and grasp focus industry, economic social development made of results give has certainly, Clarified the demands for development

3、of XXX, referring to both directions, tasks and issues, teaching methods, for the current and future development in Heilongjiang province, is of great practical significance and far-reaching historical significance. March 22 to 24th, provincial held has province tube main leaders topic seminar, prov

4、incial Secretary Wang Xiankui comrade in seminar opening province do has important speech, Wang Xiankui stressed: in-depth learning acquisition General Secretary of speech, is on XXX a political account, we must put learning implement XI General Secretary important speech spirit as major political t

5、ask, adapted and led economic development new normal, insisted to economic construction for Center not shake, implement implementation new development concept, weaknesses, and swagger grams short, and yangchangbuduan, Stimulate the endogenous dynamics, formation effect of EMU, firm implementation of

6、 the five planning, the development of key industries, open Dragon River comprehensive revitalization new journey, struggling to get out of a high quality, efficient, better structure and development road of revitalization of the advantages into full play. March 29 to 30th, the Committee organized a

7、 pipe major thematic seminar of leading cadres prefectural comrade Jia Yumei made an important speech at the opening ceremony. Jia Shuji stressed, full district upper and lower must to effective enhanced learning publicity implement implementation XI General Secretary important speech spirit of poli

8、tical consciously, and thought consciously, and action consciously and mission consciously, put learning XI General Secretary and provincial Secretary Wang Xiankui speech spirit as current primary political task, to more strongly of attitude, and more powerful of measures, and more full of drive pro

9、moted forest transformation development, struggled to out of forest transformation development new, ensure as scheduled achieved full built forest society of target. Today the County for convening this Conference, is to fully implement the arrangements of the provincial, prefectural, and is a major

10、political task. County-wide each of the party members and cadres must earnestly study, deeply understand, enter into the heart, done outside the heart, of the line armed with Jia, Secretary of spirit and mind, practice, work, below, I XX practical study Jia Shujis important speech spirit with you. A

11、wareness, deepen the County, General Secretary 长春市四环路建设工程下穿哈大客运专线框构桥工程施工组织设计长春市四环路建设工程下穿哈大客运专线框构桥工程施工组织设计中铁九局集团有限公司further clarify the transformational development, XI Jinping stressed that XXX has its advantages, also have their own boards, key to focus on weaknesses, short swagger grams, yangchang

12、buduan, integrated effect of policy measures towards the target solid forward. This important statement for us to do a good job providing a dialectical thinking and the scientific method, fully embodies the dialectical unity of subjective and objective law. We must speak to the spirit for guidance,

13、and further deepen understanding, targeted to long Yang well, Hawk shelters make good short, released in full development potential. 一 . Potential and the big five short Board, that is, ecological environment, resources, water, economic development advantage advantage, advantage as policy overlap, c

14、ultural enrichment, and industrial boards, institutional weakness, short people short, short of funds and talent. From the perspective of ecological environment, our region as an important guarantee of national ecological safety, high forest cover, water, air and soil environmental indicators, such

15、as the nature, is the development of green food and preserving pension ideal places, forest carbon sinks and other industries. From the perspective of the priority of characteristic resources, wild blueberry, Northern forest resources such as drugs, big snow, big wetlands, River and forest tourism r

16、esources, variety, large reserves of mineral resources such as molybdenum, lead and zinc, has translated into strong material conditions for economic advantage. Economic development out of the water, total more than 16 billion cubic meters of surface water resources and hydro-junction project of dev

17、elopment prospects; recoverable reserves of high quality mineral water resources million tons, is the base of rare natural and pollution-free mineral water. Seen from the advantages of cultural enrichment, with Northern culture, and Xianbei cultures, Oroqen culture and a number of cultural resources

18、, rock only found more than 1000 paintings, cultural industry development has great potential. From the perspective of policy overlap advantage, with the State Forestry Administration and the provincial government two channels of policy towards direct enjoyment of natural forest protection program,

19、Western development, resource-based cities sustainable development and main function region construction national policy planning. As long as we put these resources to use and exploit the advantages of good, could give guanghui, snow, cold region and black Glebe into gold and silver, will provide st

20、rong support for forest development. (In addition to Jia Shuji mentioned advantages, XX we have in agriculture, water conservancy and other unique resources. Agricultural resources, 1.129 million mu of arable land throughout the County, da hinggan Ling was the only predominantly rural administrative

21、 districts, green planting area of 850,000 acres. Water resources, in a river over more than 180, many river hydropower development project conditions, rich in three five Luo and 117 中铁九局集团有限公司 目 录1.编制依据、编制原则1 1.1编制依据1 1.2编制原则12.工程概况1 2.1桥梁工程概述2 2.2道路工程概述2 2.3排水工程概述2 2.4工程特点23. 施工部署33.1施工总体部署3 3.2工程

22、施工目标3 3.3施工总平面图和进度计划情况4 3.3.1施工总平面布置4 3.3.2进度计划情况54.拟投入劳动力、材料、机械设备计划和保证措施8 4.1拟投入劳动力、材料、机械设备8 4.2材料保证措施105.主要施工方法11 5.1桥梁施工11 5.1.1概述11 5.1.2施工测量方案11 5.1.3试验方案13 5.1.4基坑开挖和降水13 5.1.4.1基坑开挖13 5.1.4.2 基坑降水13 5.1.5桥梁工程16 5.1.5.1钻孔桩施工16 5.1.5.2承台施工22 5.1.5.3墩柱、墩帽施工225.1.5.4T梁架设255.1.5.5预应力施工275.1.5.6框构桥

23、施工325.1.5.7桥面及附属工程施工335.2U型槽施工345.3排水工程365.3.1管道施工365.3.2砖砌检查井395.4道路工程415.4.1施工准备415.4.2土工试验415.4.3路基填筑施工425.4.4台背回填455.4.5路面底基层、基层施工465.4.6沥青砼路面面层的施工49 5.4.6.1稀浆封层施工方法50 5.4.6.2热拌沥青混合料下面层施工50 5.6.6.3SBS改性沥青混合料施工525.4.7附属工程58 5.4.7.1人行道铺装及道路侧平石施工58 5.4.7.2混凝土挡土墙施工596.质量保证措施及质量保证体系60 6.1.分项工程质量控制措施6

24、66.2质量目标及保证体系666.3质量责任制747.安全保证措施及保证体系90 7.1安全目标90 7.2安全生产保证体系90 7.3安全保证措施90 7.4安全生产责任制967.5安全生产创优达标实施细则978.文明施工及环境保护措施99 8.1文明施工目标及保证体系99 8.2环境保护目标及保证体系103 8.3环境保护创优达标实施细则1059.雨季施工措施10710.工程应急预案1091.编制依据、编制原则1.1编制依据1.1.1我公司与业主签订的施工合同 1.1.2长春市四环路建设工程下穿哈大客运专线框构桥工程施工图设计 1.1.3国家、行业及地方相关的规范、标准、规程和规则。1.1

25、.4施工现场及其周围环境进行调查所掌握的有关资料。1.1.5本单位建设同类工程的施工经验、施工能力及科技成果。 1.1.6市政工程预算定额和本投标人的企业劳动定额及其它有关文件等。1.1.7国家、当地政府及业主在施工安全、文明施工、水土保持、环境保护和土地租用等方面有关的法律、规定。1.2编制原则1.2.1以满足招标文件及合同条款的要求为指导思想,以确保本工程的质量、安全、工期、环保目标为出发点,本着优质、高效、经济、合理的原则,按ISO9000标准建立的质量体系要求运作;按照ISO14000、OSHMS18000标准建立与本工程相适应的环境保护体系和职业健康安全体系。1.2.2以确保工程质量

26、为原则,安排专业化施工队伍,配备先进的机械设备,采用先进的施工方法。1.2.3以确保安全生产为原则,针对当地自然条件、高空作业、不良地质地段施工的特点,制订各项技术组织措施,严格执行各项操作规程。1.2.4以确保总工期及阶段性工期目标并适当提前为原则,综合分析各方面影响和控制因素,科学组织合理进行施工力量配置,并利用网络计划技术进行适时控制及优化。1.2.5以文明施工、保护环境为原则进行施工总平面布置和组织施工;采取有效措施,减少用地,复耕还田。1.2.6加强施工管理,严密组织施工,综合协调管理,做好各方面保障。推广应用“四新”技术,采用先进施工工艺,降低工程成本。2.工程概况根据长春市四环路

27、总体规划,该处为规划四环路下穿哈大客运专线动车走行线左线、右线及哈大客专铁路桥。2.1桥梁工程概述2.1.1框构桥:车行框构桥中心线与左线交叉点铁路里程D1K0+702.438,斜交角度为93.66。左侧辅道框构桥中心线与左线交叉点铁路里程D1K0+740.757,斜交角度为88.53。,右侧辅道框构桥中心线与左线交叉点铁路里程D1K0+663.149,斜交角度为98.82。车行道框构桥车行桥为2孔连续式,每孔净宽为18.5m,框构顶板厚1.2m,底板厚1.3m,中墙1.0m,两侧墙厚1.2m。车行框构桥全高9.85m,全长9.12m。辅道框构桥位于车行桥两侧,距车行桥中心线约30m,各为一孔

28、独立的框构结构,净宽14.5m。2.1.2四环路立交中桥:为4孔24米预应力混凝土梁桥。下部结构:基础为24根钻孔灌注桩,桥墩为重力式桥墩,灌注桩和桥墩由承台连接。上部结构:采用24mT梁。2.2道路工程概述 引道U形槽:车行道U形槽共29段,UIIU18段侧墙均宽1.4m,底板厚1.4m;U08U10、U19U22段侧墙均宽1.2m,底板厚1.4m;U05U07、U23U26段侧墙均宽1.0m,底板厚1.2m;U01U04、U27U29段侧墙均宽0.8m,底板厚1.0m。U形槽设抗拔桩,抗拔桩与底板用冠梁连接。U形槽纵向分段长度为1520m,U形槽顶部接人行栏杆。2.3排水工程概述 雨水管道

29、和雨水口连接管均采用钢筋混凝土排水管,管径为d300d1200,共计2330m;检查井54座,沉淀井1座,雨水口64座。框构桥南北两侧车行道及近期人行道雨水由雨水口收集后,分别汇至雨水主管道,排至U型槽外后汇合,最后排至市政雨水泵站。2.4工程特点 2.4.1长春市四环路建设工程下穿哈大客运专线框构桥工程工程量大,工期要求紧,工程质量要求高。2.4.2工程施工期间穿插交叉作业多,施工组织、施工管理难度大,成品保护难。3.施工部署3.1施工总体部署项目部下设桥梁队、U型槽一队、U型槽二队、路基路面队、排水队和桩基队六个施工队,桥梁队负责立交桥两座桥梁施工;桩基队施工全部钻孔桩;路基路面队负责全部

30、路基填方、路面工程及附属施工;排水队负责排水工程施工;U型槽一队负责U01U14施工、U型槽二队U1529U及DQ01、DQ02施工。本工程路基工程和排水工程穿插交叉作业较多,施工前熟悉图纸,合理安排排水工程和路基工程施工顺序,减少不必要的返工。根据设计图纸及现场实际情况计划先进行桥梁工程、挡土墙、路基挖方、场地内填方及排水工程施工,在具备条件的路段进行路基填方施工。确保各工序衔接,避免重复作业。本工程混凝土采用商品混凝土。桥梁施工要按照设计施工顺序,合理安排工期、施工方法,确保工程保质保量的完成。3.2工程施工目标工程施工总体目标详见下表总体工作目标表项 目工 作 目 标质量目标确保工程质量

31、达到优质工程,杜绝各类质量事故。分项工程一次检验合格率100%;单位工程检验合格率100%。工期目标本工程计划于2009年7月25日开工,2010年10月15日竣工,总工期为448天。安全目标在实施本合同工程的全过程中,坚持“安全第一,预防为主”的方针,做到“三无、三消灭、一创建”,即:无因工死亡事故、无行车和人身安全的重大、大事故、无火灾爆炸事故;消灭违章指挥、消灭违章作业、消灭惯性事故;创建安全文明样板工地。环境保护施工现场及各种临时设施严格按环境保护有关规定进行规划并实施,满足环保部门及当地政府有关环保要求,减少占地、复耕还田。文明施工工程质量、施工资料、安全管理、施工现场及各种临时设施

32、等严格按文明工地标准执行,创文明施工样板工地。3.3施工总平面布置和进度计划情况3.3.1施工总平面布置根据现场实际考查,结合工期要求,本着就近、交通便利、少占耕地农田、减少污染、施工方便、标准化管理的原则布置施工场地。3.3.1.1生产、生活用房及工作场地本工程临时设施利用施工范围内的场地。项目经理部设在A匝道与B匝道中间的空地内,搭设彩钢板房。各施工队在场地范围内采用活动板房搭设。项目部设标准养护室和储料仓库,标准养护室结构为砖混结构,内部配有恒温恒湿养护箱、空调、喷淋装置、温度计等。3.3.1.2监理工程师驻地按照招标文件要求的标准执行,按要求配备办公、生活用品、交通工具等,保障其工作条

33、件满足业主要求。3.3.1.3工地试验室本工程试验全部委托具有试验资质的试验室进行试验。项目部设配备标准养护室用来对混凝土、砂浆等试块进行标准养护,以满足本工程试验检测需要。3.3.1.4施工用水施工用水和生活用水从当地管网接入,并配备运水车保证施工及生活用水。3.3.1.5施工用电工程用电与当地电业部门联系,采用地方电网,由高压线引入,同时配备变压器,以保证整个工程用电,并配备适量发电机组,以备临时停电应急使用。3.3.1.6施工通迅沿线通讯条件较好,项目部、监理驻地利用当地通信线路,接通程控电话,施工通讯采取手机通讯方式,接通宽带,进行网上办公,并设传真机,便于与业主建立图文联系。3.3.

34、1.7临时便道施工现场交通条件较好,根据施工需要,利用原有道路进场后,在清表的同时,沿线利用人行道位置修筑施工便道,并在U型槽两侧修筑临时便道,以满足施工需要。便道宽6.0m,纵坡在2%以下,采用泥结碎石路面。施工总平面布置见施工总平面布置图3.3.2进度计划情况为按照业主要求的工期如期完工,本工程开工前做好充分的准备,开工后狠抓每个施工环节,在确保质量及文明施工的前提下,加大投入、加班加点,全力以赴的进行施工。本工程计划2009年7月25日开工,2010年10月15日竣工。我单位根据实际情况编制了施工计划,本计划按照合同工期进行编制。分部工程计划如下:施工准备 2009年7月25日-2009

35、年8月5日桥梁工程 基坑开挖 2009年8月5日2009.8.20钻孔桩基础 2009年8月18日-2009年8月30日下部结构 2008年8月28日-2009年10月15日T梁架设 2010年4月1日-2010年4月15日桥 面 系 2010年5月1日-2010年6月15日车行道框构桥 2009年9月1日2010年5月15日左侧辅道框构桥 2009年9月15日2010年5月31日右侧辅道框构桥 2009年9月20日2010年6月5日排水工程 2010年7月20日-2010年8月31日U型槽施工基坑开挖 2009年8月5日2009年10月15日 桩基施工 2009年8月25日2009年10月3

36、1日 U型槽施工 2009年9月15日2010年7月31日道路工程挡 土 墙 2010年5月1日-2010年6月30日路基填方 2010年7月1日-2010年8月10日路面基层 2010年8月1日-2010年9月10日路面面层 2010年9月12日-2010年9月30日竣工验收 2010年10月1日-2010年10月15日施工进度计划见施工进度计划横道图4.拟投入劳动力、材料、机械设备计划和保证措施4.1拟投入劳动力、材料、机械设备根据施工总体部署和实际施工需要,合理、有序地安排施工人员、机械设备和原材料进场。材料进场计划详见材料进场计划表。所投入的人员和机械设备具体见劳动力计划表和机械设备一

37、览表。劳动力计划表工种按工程施工阶段投入劳动力情况2009年2010年7月8月9月10月4月5月6月7月8月9月10月管理人员1520404040404040404020钢筋工03045458080808030300木工02030558080808020200混凝土工0210102020202010100架子工0010101010101010100电焊工05101020202020550普通工301008080150150150150606050司机55050502020202020205合计5022727530042042042042019519575材料进场计划表 项目月份钢筋(t)混凝土

38、(m3)混凝土管(m)模板()木材(m3)碎石(m3)石灰(t)2009.0700000002009.0810001000050030002009.09120050000500050002009.105007000050000002010.041500115000150000250002010.051200170000150000400002010.06120018000015000150040005002010.077001700080003700150035002010.082007000140002000032002010.0930500000002010.100000000主要施工机械

39、设备一览表序号机械或设备名称型号规格数量国别产地制造年份额定功率(KW)生产能力用于施工部位备注1反循环钻机KPZ20008中国 郑州200745桥梁 U型槽2冲击式钻机CZ-58中国 秦皇岛200740桥梁 U型槽3吊车25T4中国 徐州200725T桥梁 U型槽4挖掘机CAT330BL6美国2007道路 U型槽5混凝土输送泵HBT60C3中国 徐州200647m桥梁 U型槽6千斤顶YCW400T4中国 四平2007桥梁 7挤压机GYJ5001中国 四平2007桥梁8注浆泵SNC-3002中国 四平200775桥梁9混凝土输送泵车SY5385THB-48III2中国 长沙200848m桥梁 U型槽10推土机220HP2中国 山东2006103道路 U型槽11振动压路机15T3中国 徐州200612018t道路12振动压路机20T3中国 徐州200612018t道路13平地机PY1801中国 上海2006道路14张拉设备ZB4-5004中国 四平2006桥梁15大口井降水设备管径0.8m5中国 吉林2008U型槽16沥青砼摊铺机ABG4232德国2005道路17双钢轮压路机DD1102美国2006道路18光轮压路机18T1中国 徐州200612012t道路19自卸车10T20中国