wz云南烟叶醇化仓储中心项目施工组织设计1.doc

上传人:本田雅阁 文档编号:2138482 上传时间:2019-02-21 格式:DOC 页数:157 大小:1.31MB
返回 下载 相关 举报
wz云南烟叶醇化仓储中心项目施工组织设计1.doc_第1页
第1页 / 共157页
wz云南烟叶醇化仓储中心项目施工组织设计1.doc_第2页
第2页 / 共157页
wz云南烟叶醇化仓储中心项目施工组织设计1.doc_第3页
第3页 / 共157页
亲,该文档总共157页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《wz云南烟叶醇化仓储中心项目施工组织设计1.doc》由会员分享,可在线阅读,更多相关《wz云南烟叶醇化仓储中心项目施工组织设计1.doc(157页珍藏版)》请在三一文库上搜索。

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .云南烟叶醇化仓储中心项目(一期)二标段建设项目投标文件(技术标)招标编号:SZZB15G025 项目名称: 云南烟叶醇化仓储中心项目(一期)二

24、标段施工文件内容: 投标文件技术部分 投标人(盖公章): 法 定 代 表 人或其委托代理人(签字): 日 期: 年 月 日4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to pro

25、vide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same.

26、 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service char

27、ges (meter prices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up a

28、nd down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and

29、 the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Pla

30、nning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service ch

31、arges (meter prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount

32、 as a base for a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale

33、 of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th ch

34、apter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting docume

35、nts, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .目 录第一章 编制说明1一、编制原则1二、编制依据1三、 执行的规范标准1第二章 施工部署及组织机构31、施工原则及施工区域划分32、机构设置33、总包管理和与发包人、监理及设计人的配合4第三章 施工技术

36、方案5第一节 土建工程施工技术方案5一、测量方法5二桩基础施工7三、基础土方开挖及回填施工技术方案11四、基础工程施工方法17五、砌体工程30六、预埋件工程施工方法32七、装饰装修工程施工方法35八、门窗工程36九、地面工程38十、 涂饰工程40十一、脚手架工程施工方法42第二节钢结构制作安装施工技术方案55一、钢结构制作施工方法55二、钢结构安装方案62第三节 给排水安装施工技术方案73第四节 电气工程施工技术方案79第四章 主要施工工艺101第五章 冬季和雨季施工方案103第一节 冬季施工技术措施103第二节 雨季施工技术措施108第六章 质量承诺及保证措施110第一节 项目质量计划110

37、一、质量方针110二、质量承诺110三、质量目标110四、组织措施110五、计量管理111第二节 质量控制和保证措施111一、施工准备阶段的质量控制和保证措施111二、土建工程质量保证措施:112三、钢结构制作安装阶段的质量控制114五、电气工程质量控制保证措施115六、外观质量控制115七、交工验评阶段的质量控制115六、质量保证控制体系图116第三节 项目质量体系的运行117一、文件和资料的管理:117二、采购物资的管理117三、施工过程控制117四、检验和试验118第七章 安全文明施工及保证措施119第一节 安全管理目标与保证措施119一、安全生产方针及安全管理承诺119二、安全管理目标

38、120三、安全保证体系120四、施工安全管理120五、安全管理保证制度121第二节 文明施工保证措施128一、目标及承诺128二、场容场貌管理128三、施工现场管理129四、现场总图规划管理129五、生活卫生管理130第三节 环境保护措施130一、环境管理目标130二、环境保护措施130三、环境管理体系的审核132四、对周围管线、建筑物的保护措施132第三节施工场地治安保卫管理计划;133第八章 工期承诺和保证措施133一、工程工期承诺133二、工期保证措施133第九章 成品保护和工程保修措施和承诺136第十章 施工进度计划144第十一章 劳动力投入计划145第十二章 施工机械投入计划147第

39、十三章 施工总平面布置图151151152第一章 编制说明一、编制原则2.1.符合业主招标文件的要求,按照标书目标及要求来编制施工组织设计,积极响应招标文件;2.2.符合基建工程施工的程序和客观规律以及本项目施工的工程特点;2.3.以我公司先进的技术、装备、人员素质为基础,采取科学的施工方法、先进的管理模式、现代化的配置、完善的措施,实现创优目标;2.4.针对本工程的特点及现场条件,选取先进合理的施工工艺;二、编制依据3.1. 云南烟叶醇化仓储中心项目资格预审文件,(招标编号:SZZB15G025)。3.2. 现行的国家技术规范、规程及标准;3.2. 我司对工程地形状况的熟悉掌握;3.5. 我

40、公司承担类似工程的施工经验。 三、 执行的规范标准 序号法规、标准及规范名称法规/标准号1建设工程安全生产管理条例国务院令第393号2建筑施工安全检查标准JGJ59-20113用电安全导则GB/T13869-20084施工现场临时用电安全技术规范JGJ46-20055建筑施工现场环境与卫生标准JGJ146-20046建筑机械使用安全技术规程JGJ33-20017建筑施工高处作业安全技术规范JGJ80-918施工现场消防安全技术规范GB5072020119工程测量规范GB50026-9310钢结构施工规范GB50755-201211钢结构工程施工质量验收规范GB50205-200112建筑工程施

41、工质量验收统一标准GB50300-200113建筑钢结构焊接技术规程JGJ81-200214钢结构焊接规范GB50661-201115气焊、手工电弧焊及气体保护焊焊缝坡口基本形式与尺寸GB/T986-198816钢结构高强螺栓连接的设计、施工及验收规范JGJ81-199117钢结构制作安装施工规程YB9254-9518钢焊缝手工超声波探伤方法和探伤结果分级GB/T11345-198919金属熔化焊焊接接头射线照相GB/T3323-200520涂装前钢材表面锈蚀等级和除锈等级GB8923-198821建筑防腐蚀质量检验评定标准GB50224-9522钢结构防火涂料GB14907-200223钢结

42、构防火涂料应用技术规范CECS24-9024屋面工程施工质量验收规范GB50207-200225建筑工程施工质量评价标准GBT 50375-200626低合金高强度结构钢GB/T1591-200827碳素结构钢GB/T700-200628碳钢焊条GB/T5117-9529低合金钢焊条GB/T5118-9530气体保护电弧焊用碳钢、低合金焊丝GB/T8110-200831埋弧焊用碳钢焊丝和焊剂GB/T5293-199932埋弧焊用低合金钢焊丝和焊剂GB/T12470-200333六角头螺栓 C级GB/T5780-200034六角头螺栓GB/T5782-200035钢结构用高强度大六角头螺栓GB/

43、T1228-200636钢结构用高强度大六角头螺栓、大六角螺母、垫圈技术条件GB/T1231-200637冷弯薄壁型钢结构技术规范GB/T50018-200238建筑用压型钢板GB/T12755-9139建筑施工扣件式钢管脚手架安全技术规范JGJ130-200140纲结构焊缝外形尺寸JB/T7949-199941建筑结构用钢板GB/T19879-200542云南省建筑工程施工质量验收统一规程DBJ53/T-23-200843云南省建筑工程施工质量验收统一规程DBJ53/T-23-200844建筑地基处理技术规范JGJ79-200545建筑桩基技术规范JGJ94-200446混凝土结构工程施工规

44、范GB50666-200247给水排水构筑物工程施工及验收规范GB50141-200348屋面工程技术规范GB50345-200249建筑内部装修防火施工及验收规范GB50354-200550外墙外保温工程技术规程JGJ144-200451建筑钢结构焊接技术规程JGJ81-200252建筑基桩检测技术规范JGJ106-200353建筑地基基础工程施工质量验收规范GB50202-200254混凝土结构工程施工质量验收规范GB50204-200255钢结构工程施工质量验收规范GB50205-200156建筑装饰装修工程质量验收规范GB50210-200157给水排水管道工程施工及验收规范GB502

45、68-200858建筑施工安全检查标准JGJ59-201159建设工程文件归档整理规范GB/T50328-200160建筑工程施工质量验收标准GB50300-2001第二章 施工部署及组织机构1、施工原则及施工区域划分施工原则坚持先准备、后施工;先预制、后安装;先地下、后地上;先大件后小件;先室外、后室内,由低到高的施工顺序。根据厂房平面布置情况,拟将本工程施工化分为两个流水作业段,3#醇化库为第一个流水作业段,4#醇化库为第二个流水作业段,拟安排两个施工队同时施工。2、机构设置3、总包管理和与发包人、监理及设计人的配合3.1该工程不允许分包,不存在总包管理3.2与发包方配合(1)施工准备阶段

46、,项目经理参与工程合同的洽谈,明确施工方与业主方的责权关系,业主应为工程顺利开工提供材料、设计图纸、场地、外部水、电;施工单位应落实施工必需的劳动力、材料、机具、大临设施等。(2)施工单位主动配合业主,做好建设过程中的准备工作及时提出积极建议,想业主所想,急业主所急。(3)施工单位及时提出应由业主供应的设备、材料供应计划,并对业主提供的设备、材料进行交接、验收。(4)施工单位对工程质量严格要求,尊重业主的监督,对重要的隐蔽工程,请业主参加认证签字,方可进行下工序施工。并随时向业主提供材料、设备和报验单及隐蔽工程验收通知等资料。(5)工程施工过程中,出现承包合同条约以外的重大设计变更。材料代用等时,施工单位及时向业主办理手续,业主应积极配合,以此作为交工和结算依据。工程全部竣工,双方应按规定办理交工验收手续,施工单位应在规定时间内提供完整的竣工资料,对验收过程中存在的问题,应采取有效措施,尽快达到设计、合同、规范要求。3.3与监理配合(1)开工前,施工单位为监理开展工作提供必要的条件。(2)工程施工过程中随时接受业主代表和监理单位对工程质量进行监督管理,配合好监理单位对施工质量的随时进行检查或委托有资格的质检部门进行重点抽查。为其开展工作提供方便,提供规定原始记录、检查记录技术及其它资料。(3)隐蔽工程验收提前通知监理,并提供完整的隐蔽工程验收资料,任何分项工程必须通过监

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1