1、thrift of excellent traditional and style lack deep of understanding, one-sided think in now of good situation Xia, economic smooth more fast development, and reform made major progress, and people living significantly improve, and social the career made new progress, no necessary always hard has, n

2、o awareness to China also has many poverty area, and also has many poverty population of exists, more living improve has, more need keep hard of style. Three is not strictly honest. Total thought units is a water sector, clean self-discipline away from himself too far, no real processing good living

3、 of improve and hard, and thrift excellent traditional of relationship, no effective do comply with Constitution and party of regulations must from I do up, no right mercy good bitter Le, and wealth of relationship, no right awareness to in comply with Constitution and party of regulations aspects e

4、veryone has accountability. Four, future direction and improvement measures 1, belief and faith, strengthen party spirit. One is to firmly establish the noble ideals of struggle for the ideals of communism, communist struggle for life, ready to sacrifice everything for the party and the people. Seco

5、nd is to continuously improve the quality and standard of political, conscientiously study Deng Xiaoping theory and three represents important thought and the scientific Outlook on development, implement the partys basic program for the primary stage of socialism, adhere to the correct political ori

6、entation, maintain highly consistent with the CPC Central Committee, is good at theories of socialism with Chinese characteristics to analyze and solve problems. Third, strengthening the party spirit and the world transformation, perseverance of the party Constitution, relive Party vows to establish

7、 correct world Outlook, Outlook on life and the world, practically embodies ideals and beliefs into action, combine lofty ideals and practical activities, transforming the objective world, actively participate in the great practice of building socialism with Chinese characteristics. 2, keep the purp

8、ose in concept, changing the style of work. First, keep in mind that the purpose of serving, adhere to assuming power for the people, keep in mind the people and care about people, and the joys and sorrows of the masses, .According to city discipline, and municipal organization Department requiremen

9、ts, today we held implement implementation independent Commission against corruption guidelines effective strengthening led cadres style construction topic democratic life, main task is close contact thought, and work actual, control check district Standing Committee team and the personal in impleme

10、ntation independent Commission against corruption guidelines Shang exists of problem, in-depth carried out criticism and self-critical, further clear rectification direction and measures, effective enhanced clean politics of consciousness and initiative, firm set good of ruling image. Before the mee

11、ting, the way we take surveys solicited a views, combed, related to team building环压式薄壁不锈钢管道安装施工工法申报资料山西一建集团有限公司二0一二年十二月目 录一、山西省省级工法申报书二、工法关键技术鉴定证书三、工法文本四、经济效益和社会效益证明材料五、工程应用证明材料六、工法实际应用操作要点的照片七、山西省省级工法评审意见表一、山西省省级工法申报书山西省省级工法申报书工法名称:环压式薄壁不锈钢管道安装施工工法申报单位:山西一建集团有限公司申报时间:二O一二年十二月 山西省住房和城乡建设厅制工法名称环压式薄壁不

12、锈钢管道安装施工工法主要完成单位山西一建集团有限公司通讯地址太原市平阳路一号金茂国际数码大厦A座6层邮编030012联系人王江平电话13753586404主要完成人员姓名职务职称所在工作单位梁九江经理工程师山西一建集团有限公司支恩生主任工程师工程师山西一建集团有限公司王虎项目经理工程师山西一建集团有限公司马钊项目工程师助工山西一建集团有限公司董亚丽技术科长工程师山西一建集团有限公司本工法应用的工程名称及时间本工法应用于临汾新医院住院楼、华亭影剧院工程应用时间:2012年6月-2012年11月本工法关键技术名称及鉴定时间1、连接采用专用环压工具。2、用量具确定所需管材长度后,用专用断管器断管。3

13、、管材与管件采用圆筒状弹性硅橡胶密封圈密封。4、连接时用环压工具从外部沿承口施压,迫使承口连同管材局部均匀地压缩至变形下凹,从而达到管材、管件承口密封、接口紧固的效果。鉴定时间:2012年12月6日本工法关键技术获成果奖励情况1、获企业级优秀工法。2、经山西省建设厅组织鉴定委员会鉴定,达到国内先进水平。注:1、表中的通讯地址和联系人之第一完成单位;2、主要完成人员最多不超过5人;3、表格空间不够的可附页。工法内容简述:1、工艺原理该技术是一种环压连接方式,即将套有圆筒状、弹性体密封圈的管材插入环压式管件(剖面呈阶梯形没有收口)的承口,采用专用环压工具从外部沿承口圆周施加一定的压力,迫使承口连同

14、管材局部均匀地压缩至变形下凹,从而达到管材、管件承口密封,接口紧固的作用。并且将整个管道组合为一体,同时起到不渗不漏的作用。2、施工工艺流程环压安装准备预制加工干管安装立管安装支管安装管道水压试验管道冲洗管道保温。 3、操作要点(1)检查所用模块规格与待安装管路规格是否一致。应注意:生产的管材、管件,必须配套使用专用安装工具进行施工安装。(2)用量具确定所需管材长度。断管应采用机械方法断管,断面应与管材垂直,并去除端面内外毛刺。(3)管材与管件采用圆筒状弹性硅橡胶密封圈密封。将管材插入至管件底部,先画线定位,然后将密封圈套至有标识线处,将套好的管材再次插入管件底部,并使密封圈与管件密封段端口齐

15、平。(4)连接时,将管道放入专用环压工具的钳口中,使管件的端口位于对应的压缩模块上定位。环压钳合口后,将两支圆柱销插到位才可加压操作。卸压后取出环压成型管道,完全卸压后才可打开钳头。关键技术及保密点(有专利权的,请注明专利号):1、连接采用专用环压工具。2、用量具确定所需管材长度后,用专用断管器断管。3、管材与管件采用圆筒状弹性硅橡胶密封圈密封。4、连接时用环压工具从外部沿承口施压,迫使承口连同管材局部均匀地压缩至变形下凹,从而达到管材、管件承口密封、接口紧固的效果。技术水平和技术难度(包括与国内外同类技术水平比较):1、技术水平:环压式薄壁不锈钢管道安装施工工法关键技术经鉴定,达到国内先进水

16、平,为今后施工提供了依据。2、技术难度:(1)连接采用专用环压工具:所用模块规格与待安装管路规格必须一致,且使用配套工具才能达到环压效果。(2)下料必须准确:用量具确定所需管材长度后(L总=L+2L1),用专用断管器断管。(3)采用圆筒状弹性硅橡胶密封圈:密封圈上不得存有沙粒、破损、油污等现象。密封圈套在管材上,应做到规整顺直,不得出现扭曲现象。(4)与配套管件的连接:工具钳口的凹槽必须与管件凸部靠紧,工具钳口应与管子轴心线垂直,环压压力必须符合要求。工程应用情况及推广应用前景:该工法操作简便,技术先进,密封性能良好,外表美观,在实际工程中管道安装后均能一次试压合格,无漏水隐患。投入使用后不存

17、在返修现象,无维护费用,能够满足和匹配高档装修的要求,提升建筑物的整体档次。在我公司施工的临汾新医院和华亭影剧院两个工程中应用后,都得到了建设单位和监理单位的好评。综上所述,该工法的社会效益和经济效益是十分显著的,值得广泛推广与应用。经济效益或社会效益:1、经济效益:以DN50管道为例,每100米环压连接不锈钢管安装工程直接费为14631.6元,而同等条件下的钢塑复合管为19799.3元,PP-R管为15908.6元。2、社会效益:该技术施工工艺操作简便,技术先进,密封性能良好,外表美观。在实际工程中管道安装后均能达到一次试压合格,无任何渗漏现象。在使用过程中安全可靠,无任何返修现象,并给各相

18、关方都带来非常良好的经济和社会效益。通过应用该技术,解决了热镀锌管及钢管易锈蚀、影响水质,PVC管不能加热等不足,深得建设、监理等单位的一致好评。工法主要完成单位意见环压式薄壁不锈钢管道安装施工技术已经成功应用于临汾新医院工程中,应用效果良好。该技术对以往施工工艺进行了改进和创新,为此,我们对其进行了总结,编制了施工工法,该工法的关键技术于2012年12月6日顺利通过了山西省住房和城乡建设厅科技成果鉴定委员会的鉴定, 达到国内先进水平,因此,我单位推荐申报省级工法。年 月 日(公章)申报市或部门推荐意见年 月 日(公章)专家评审意见年 月 日(公章)省住房和城乡建设厅审定意见年 月 日(公章)

19、二、工法关键技术鉴定证书鉴 定 意 见 NO.12012年12月6日,山西省住房和城乡建设厅组织有关专家组成鉴定委员会,对山西一建集团有限公司完成的薄壁不锈钢管环压连接施工工法关键技术进行了鉴定,经过听取汇报、审查资料、认证讨论后形成如下鉴定意见:一、提供的鉴定资料基本齐全、完整,工艺原理简洁明了,符合工法关键技术鉴定的要求。二、薄壁不锈钢管具有重量轻、力学性能好、使用寿命长、摩阻系数小、不易产生二次污染等特点,近几年广泛应用于给水和热水系统工程中。三、该工艺施工简单快捷,工期短,成型效果美观,一次安装成功率高。社会效益和经济效益较显著,有推广与应用的前景。该项关键技术达到国内先进水平。建议尽

20、快总结,形成工法,以便推广应用。主审:要明明鉴定委员会主任签字: 2012年12月6日to make the following points: the room temperature between relative humidity maintained at 30%-55%, and 7 days a week, 24 hours a day is required. Keep free of dust and well ventilated, brightness of at least 50 candle light. Provide the right door, the doo

21、r should open outward. To have a sufficient number of dedicated power outlet, provides volt 15 amp AC power to the device. This power supply for power and air conditioning or lighting circuits apart. the whole systems color management according to the design of the comprehensive wiring system, the w

22、hole system to the implementation of an integrated color management, that is, different regions using different colors to the mark, specific color meanings are as follows: Blue: represents the regional level subsystems, terminating in the blue area of the cables between the junction between levels t

23、o information outlets. White: represents the vertical cable subsystem, terminating in the white areas of the main cable wiring and wiring between floors. Green: input from the Central Office trunks Purple: from the data of common devices such as switches to lead. 2.6.7 design results in accordance w

24、ith the ideas for the design of comprehensive wiring system, in line with the new plant office building, workshop technology requirements, 155Mbps ATM, and video transmission and other requirements, in line with the 15-20 development of data communication within the development trend of the future.

25、Based on the above design, design the system diagram in Appendix; other engineering equipment offer is attached. Part III, section I of the computer network system, Systemproject work, cadres, cadres selection and other aspects of a total of 19, further defined the direction of rectification, enhanc

26、ing the pertinence and effectiveness of democratic life. Good for this meeting, we requested the Standing Committee of the municipal party Committee, municipal Secretary General Tang Wenjin, the City Commission for discipline inspection Standing Committee Yang Xu, Jiang Jixue, Deputy Director of the

27、 personnel office, and other leading comrades present guidance allows us to warm applause for their welcome and thanks! Below, I first District Committee member of the 20XX team annual democratic meeting implementation of the corrective measures, as well as member of the team and of my own report gu

28、idelines for the implementation of the independent Commission against corruption statement invited leaders and comrades criticism. First, annual party on the 20XX team, Member of democratic life action plan implementation year 20XX, district democratic meeting a member of the team on study and pract

29、ice the scientific Outlook on development theme, find a project supporting strong enough, the industry well enough, urban construction management level needs to be improved, livelihood improvement needs to be strengthened, district team itself, such as the five aspects. Year of 20XX, we find out the

30、 problems mentioned above, based on actual Shunqing construction and development, conscientiously sum up improvements, achieving significant development results and effectiveness of their work. (A) highlight the project handle, maintain high growth of investment. Adhere to the strategy as a Foundati

31、on, carrying out projects to promote increased stamina important. One is to increase the intensity of projects towards. Actively seek national and provincial policy support, superior special transfer payments, a variety of additional income will top 700 million Yuan, a number of key infrastructure p

32、rojects, livelihood projects, industrial projects into the cage. Second, increasing the project attracts. This year a total of 23 signed a major project, of which 14 billion project, China Metallurgical group, vanke group, Guangdong hengda group, Taiwan Ruentex group, on the RI group, Shenzhen Kaisa

33、, jifeng agricultural machinery, Mercedes-Benz, Audi 4S store and other large enterprises and projects have settled in Shunqing. Third, strengthen project construction. Annual implementation focus project 39 a, fixed assets investment total will breakthrough 12 billion yuan, created district yilai h

34、istory high, South door dam, and five in shop old city transformation, and Ying China industrial concentrated district construction, and city main road construction, and Northeast steam Trade Center, and modern farmers industry Park, and vocational education city, and low rental, and also room const

35、ruction, and features blocks build, and farmers market transformation, and rural version Street transformation, focus engineering speed up implementation, effectiveness obviously. Expected to be achieved this year, area-wide GDP 17 billion三、工法文本环压式薄壁不锈钢管道安装施工工法山西一建集团有限公司1 前言薄壁不锈钢管与其配套的环压式连接件,是我国近年来发

36、展成熟的新型建筑材料,非常适用于给水、热水、饮用纯净水等工程。该材质能够克服镀锌管及钢管易锈蚀,影响水质;PVC管不能加热等不足。该施工工艺操作简便,技术先进,密封性能良好,外表美观。在使用过程中安全可靠,一次试压合格后基本不存在返修现象,维护费用小,能带来非常良好的经济和社会效益。我们通过在山西临汾新医院和华亭影剧院两个工程实践应用,并对其进行了总结,编制了施工工法,该工法的关键技术于2012年12月6日顺利通过了山西省住房和城乡建设厅科技成果鉴定委员会的鉴定, 达到国内先进水平,该方法很有推广与应用价值。2 工法特点2.1管道外型美观;管件连接紧凑,尺寸小。整个管道系统具有简洁明快、和谐流

37、畅的观感效果。2.2安装施工机具轻巧,无需大型设备;管材也无需套丝、滚槽、现场焊接等工艺。只需采用专用环压工具压接成型。2.3安装快捷,省时省力,一次性安装成功率高。可大大提高劳动效率。2.4管道通径流量损失小,环压效果不改变管材断面的几何尺寸和形状,连接处流量损失小,可忽略不计。1/112.5环压连接可靠性高,使用过程中不易受环境变化,而改变其连接状态,在正常使用条件下终身不用维修。2.6节能环保效果也比较好。不会对大气造成废气污染;也不会给环境带来噪音影响。3 适用范围环压式连接薄壁不锈钢管道使用于冷热水、直饮水、燃气以及消防喷淋等民用低压流体管道工作压力小于或等于1.6MPa,流体温度小

38、于100。4 工艺原理该技术是一种环压连接方式,即将套有圆筒状、弹性体密封圈的管材插入环压式管件(剖面呈阶梯形没有收口)的承口,采用专用环压工具从外部沿承口圆周施加一定的压力,迫使承口连同管材局部均匀地压缩至变形下凹,从而达到管材、管件承口密封,接口紧固的作用。并且将整个管道组合为一体,同时起到不渗不漏的作用。见图4.1管材密封圈管件锁紧段承插段图4.1 不锈钢管与环压环连接方式示意图5 施工工艺流程及操作规程5.1施工工艺流程环压安装准备预制加工干管安装立管安装支管安装管道水压试验管道冲洗管道保温。 5.2操作要点2/115.2.1环压安装准备1 专用环压工具检查1)检查所用模块规格与待安装

39、管路规格是否一致。应注意:生产的管材、管件,必须配套使用专用安装工具进行施工安装。2)查看模块着色挡板朝向是否相一致,即上、下着色挡板朝在同一侧。上下四个滑动模块回退是否灵活,模块与模块之间有无污物、颗粒杂质。模块台阶面的一端应靠向着色挡板。严禁在模块残缺、不成组情况下强行环压施工。3)检查液压泵工况,出现工作不正常、漏油等现象严禁使用。4)检查压力表,油泵上必须加装压力表。压力表每月须校对一次。压力表无法正常工作时,严禁使用。2 安装前技术准备结合施工现场,熟悉施工图纸,参看有关专业设备图和装修建筑图的基础上,核对各种管道、装修做法的位置、标高等是否有交叉冲突,管道排列所用空间是否合理。图5

40、.1 吊顶内管道排列图3/115.2.2预制加工 1 根据设计图纸规定的坐标和标高线,并结合现场实际情况,绘制吊顶内综合排列图,标出管道分路、管径、变径、预留管口、阀门位置等,在实际安装的结构位置做标记,按标记分段量出实际安装的准确尺寸,记录在施工草图上,按图进行管段的预制加工和预装配。2 同时根据综合排布图确定支架的标高和管道安装位置进行成批量的支架制作、安装。 图5.2 走廊支架排布图5.2.3干管安装 将预制加工好的管段按编号运至安装部位进行安装。将各管段进行环压连接,其操作步骤如下:1 断管不锈钢管材的断管应采用机械方法断管,不宜采用砂轮机等会产生高温的断管工具。常用专用工具有断管器、

41、锯弓。断面应与管材垂直,并去除端面内外毛刺。2 下料用量具确定所需管材长度4/11所需管材总长度计算式: L总=L+2L1管件管件管材其中:L总所需管材总长;L1 管件插入长度(见附件3 管件安装尺寸);L 管件间距,应不小于1cm;3 预装密封圈1)将管材插入至管件底部,并在密封圈预装位置做记号画线定位,见图5.3。图5.3 画线定位2)拉出管材,将密封圈套至有标记处,见图5.4。图5.4 套密封圈3)将套好的管材再次插入管件底部,并使密封圈与管件密封段端口齐平,见图5.5。图5.5 密封圈与管件密封段端口齐平5/114 环压连接确认后用专用液压钳卡住管件端部,通过液压工具加压完成管道的环压

42、连接。安装完成后检查压接质量,要符合以下三点:1)压接部位360压痕应凹凸均匀;2)管件端面与管材结合处应紧密无间隙;3)管件端面与管材压合缝露出的残余密封圈能轻松去除。残余密封圈环压压痕图5.6 压接后的效果5.2.4立管安装将预制加工好的立管段运至安装现场,并将各管段进行环压连接。立管安装时,管道井立管排列严格按施工图尺寸进行安装,立管穿越楼板处应加设钢套管,套管高出地面20mm,管道安装一定要在墙壁粉饰完成后进行,以免污染管道。5.2.5支管安装将预制好的支管运至施工现场组装,明装支管一般沿墙敷设,并设有23的坡度,坡向配水点。 5.2.6管道固定6/11用角钢门字架固定在墙或梁、顶板上

43、, 将管道采用U型卡环固定,不得有松动现象。5.2.7管道敷设敷设时严禁产生轴向弯曲和扭曲,穿过墙或楼板时不得强制校正。当与其它管道平行敷设时,应按设计要求预留保护距离,当设计无规定时其净距不宜小于100mm。5.2.8水压试验水压试验时,管道末端封堵,缓慢注水,以放净空气,充满水后进行严密性试验,然后宜用手动泵缓慢升压,升压时间不得小于10min,升压规定压力后,停止加压,稳压1h,观察接头部分是否有漏水现象,稳压1h后,补压至规定压力值,15min内压力降不超过0.05MPa为合格。5.2.9管道冲洗以给水系统为例,管道冲洗用每升水中含20-30mg游离氯的清水灌满管道静置24h后,再用饮

44、用水冲洗,经卫生部门取样检验符合现行的国家标准生活饮用水卫生标准后,即可使用。5.2.10管道保温给水、热水及回水管道均采用W38贴面超细玻璃棉保温,热水及回水管道厚度50mm;给水厚度为20mm。保温施工时必须包扎严密、均匀、表面平整,无凹凸不平现象。所有保温、防结露材料均必须采用不燃材料。保温及防结露必须在压力试验、灌水试验完毕后方可进行。6 材料与机具设备7/116.1生活饮用水环压式不锈钢管道系统的管材和管件应具备合格证、检验报告或认证文件,并应有明显标志标明规格和产品商标。6.2环压式不锈钢管道必须使用同一公司生产的管材、管件和相应的配套安装工具。6.3机械:砂轮据、台钻、电锤、手电

45、钻、电焊机、电动试压泵等。6.4工具:环压工具钳、管钳、压力钳、手锯、手压泵、断管器等。6.5其他:水平尺、线坠、钢卷尺、压力表等。6.6劳动组织:根据工作面、工作量合理调配施工工人员,一般以2-3名水暖工人为一组,配合安装1个立管系统。7 质量控制措施7.1管材下料截管后,对管子内外的毛刺必须用专用锉刀或专门的除毛刺器除去,若清除不彻底则插入时会割伤橡胶密封圈而造成漏水。7.2管子插入管件前须确认管件O型密封圈已安装管件端部的U形槽内,安装时严禁使用润滑油。7.3管子必须垂直插入管件,若歪斜则易使O型密封圈割伤或脱落而造成漏水,插入长度必须符合表1的规定,否则会因管道插入不到位而造成连接不紧

46、密出现渗漏。7.4环压连接时工具钳口的凹槽必须与管件凸部靠紧,工具钳口应与管子轴心线垂直,环压压力必须符合要求。开始作业后凹槽部应咬紧管件,直至产生轻微振动才可结束。7.5薄壁不锈钢管与丝扣件的连接:与阀门、水表、水嘴等丝扣件的连接必须采用专用的薄壁不锈钢内外丝转换接头,严禁在水管上套丝。8/117.6直饮水薄壁不锈钢管道的消毒冲洗:饮用水薄壁不锈钢管道在试压合格后宜采用0.03%高锰酸钾消毒液灌满管道进行消毒,应将消毒液倒入管道中静置24h。排空后再用饮用水冲洗。冲洗前应对系统内的仪表加以保护,并将有碍冲洗的节流阀、止回阀等管道附件拆除和妥善保管,待冲洗后复位。饮用水水质应达到现行标准生活饮用水卫生标准的要求。7.7管道支架的设置7.7.1按不同管径和要求设置管卡或吊架,埋设应平整,管卡与管道接触应紧密,但不得损害管道表面。7.7.2固定支架的间距不宜大于15m,热水管固定支架间距应根据管线热胀量、膨胀节允许补偿量等确定。固定支架宜设置在变径、分支、接口及穿越承重墙、楼板的两侧等处。7.7.3金属支架或管卡与薄壁不锈钢管材间必须采用塑料或橡皮垫片隔离,以避免不锈钢管受到腐蚀。