《河北省南水北调配套工程石津干渠工程沧州支线压力箱涵(沧州市段)工程土建施工二标.doc》由会员分享,可在线阅读,更多相关《河北省南水北调配套工程石津干渠工程沧州支线压力箱涵(沧州市段)工程土建施工二标.doc(168页珍藏版)》请在三一文库上搜索。

1、Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M t

2、otal area: 13979 square time: 251 days. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in L

3、ianyungang city, Jiangsu Yulong building construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration,

4、 quality, security and contract requirements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully m

5、eet the expectations of safety and durability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on t

6、he above points, the erection of scaffolding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous const

7、ruction experience, decided to adopt the following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safe

8、ty monitoring. Horizontal and vertical transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Pane

9、l agencies, staffing, and the Division of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible fo

10、r on-site safety inspections; Zhao Guangrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of exp

11、eriments, materials equipment positioning settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings

12、with a ruler, measure the inner and outer pole distance from the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with .Kangda College of Nanjing Medical Univ

13、ersity (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M total area: 13979 square time: 251 days

14、. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in Lianyungang city, Jiangsu Yulong buildi

15、ng construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration, quality, security and contract requir

16、ements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully meet the expectations of safety and dur

17、ability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on the above points, the erection of scaff

18、olding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous construction experience, decided to adopt t

19、he following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safety monitoring. Horizontal and vertical

20、 transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Panel agencies, staffing, and the Division

21、 of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible for on-site safety inspections; Zhao Gua

22、ngrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of experiments, materials equipment position

23、ing settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings with a ruler, measure the inner and ou

24、ter pole distance from the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with . 目录目录 第一章第一章工程概况工程概况 1010 1.1 工程概况 .10 1.2 水文气象 .10 1.3 工程地质 .10 第二章第二章 施工方案

25、总体规划施工方案总体规划 1111 2.1 施工总体规划原则.11 2.2 施工总目标.12 2.2.1 工期目标.12 2.2.2 工程质量目标.12 2.2.3 安全管理目标.12 2.2.4 环境保护及水土保持目标.12 2.2.5 文明施工目标.13 2.2.6 成本目标 .13 2.3 施工技术总体规划 .13 2.3.1 施工通道规划.13 2.3.2 施工供水规划.14 2.3.3 施工供电规划.14 2.3.4 拌和系统规划.14 2.3.5 弃渣场规划.15 Kangda College of Nanjing Medical University (pharmacy/f/nu

26、rsing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M total area: 13979 square time: 251 days. This project consis

27、ts of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in Lianyungang city, Jiangsu Yulong building construction engin

28、eering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration, quality, security and contract requirements, so the option

29、s, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully meet the expectations of safety and durability. 3, selection

30、 of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on the above points, the erection of scaffolding, JCJ59-99 chec

31、k the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous construction experience, decided to adopt the following scaffold

32、s programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safety monitoring. Horizontal and vertical transport of materia

33、ls to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Panel agencies, staffing, and the Division of responsibilities

34、are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible for on-site safety inspections; Zhao Guangrong (workers monit

35、or the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of experiments, materials equipment positioning settings through

36、long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings with a ruler, measure the inner and outer pole distance fro

37、m the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with .Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the Nort

38、h West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M total area: 13979 square time: 251 days. This project consists of Jiangsu run investment developme

39、nt company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in Lianyungang city, Jiangsu Yulong building construction engineering company limited; the Song Shipe

40、i as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration, quality, security and contract requirements, so the options, should fully take into account the

41、following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully meet the expectations of safety and durability. 3, selection of materials, and strive to achieve c

42、ommon GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on the above points, the erection of scaffolding, JCJ59-99 check the standard requirements must be me

43、t to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous construction experience, decided to adopt the following scaffolds programme: steel floor scaffold (b),

44、 security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safety monitoring. Horizontal and vertical transport of materials to set up the temporary warning are

45、a, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Panel agencies, staffing, and the Division of responsibilities are as follows: Song Shipei (Project M

46、anager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible for on-site safety inspections; Zhao Guangrong (workers monitor the shelf)-Member, responsible for

47、site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of experiments, materials equipment positioning settings through long hand, base pole longitudinal swee

48、ping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings with a ruler, measure the inner and outer pole distance from the wall, and mark steel tape measur

49、e straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with . 2.4 主要施工方案.15 2.4.1 降排水施工方案 .15 2.4.2 土方开挖方案 .16 2.4.3 施工导流方案 .16 2.4.4 混凝土施工方案 .17 第三章第三章 施工管理施工管理 1818 3.1 施工组织机构 .18 3.1.1 组织机构设置 .18 3.1.2 施工组织机构各部门及主要成员的职责 .19 3.2 劳动力配置 .21 3.2.1 管理人员配备 .21 3.2.2 施工队伍配置 .22 第四章第四章 施工总体布置施工总体布置 2323 4.1 布置原则及条件.23 4.1.1 施工布置原则.23 4.1.2 施工布置条件.23 4.2 供水系统 .24 4.3 供电系统 .24 4.4 通信系统 .27 4.5 混凝土拌和系统