ga深圳市地铁5号线布吉、坂田段交通疏解之布坂联络道市政工程环评报告书(简本).doc

上传人:本田雅阁 文档编号:2238697 上传时间:2019-03-08 格式:DOC 页数:49 大小:977.51KB
返回 下载 相关 举报
ga深圳市地铁5号线布吉、坂田段交通疏解之布坂联络道市政工程环评报告书(简本).doc_第1页
第1页 / 共49页
ga深圳市地铁5号线布吉、坂田段交通疏解之布坂联络道市政工程环评报告书(简本).doc_第2页
第2页 / 共49页
ga深圳市地铁5号线布吉、坂田段交通疏解之布坂联络道市政工程环评报告书(简本).doc_第3页
第3页 / 共49页
亲,该文档总共49页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《ga深圳市地铁5号线布吉、坂田段交通疏解之布坂联络道市政工程环评报告书(简本).doc》由会员分享,可在线阅读,更多相关《ga深圳市地铁5号线布吉、坂田段交通疏解之布坂联络道市政工程环评报告书(简本).doc(49页珍藏版)》请在三一文库上搜索。

1、units, one month, one inspection, one month, one dispatch to ensure emission reduction work smoothly. Also cooperate with provincial and municipal environmental protection Department many times inspection, problems existing in the supervision, tracking, and urge enterprises to implement action plan.

2、 First half of 2015, COD indicators in our County has completed Twelve-Five cuts. NOX targets because the County has no specific projects, the indicator exceeds the value. 1. the air pollutant emissions. Enhance Yixin steel, Baosteel Dresdner and min-light steel three supervisory management, require

3、s companies to establish emissions reduction facilities operation management system and standardize the emissions account records standard abatement equipment operation and fault reporting system. Yi Xin min light steel and iron and steel sintering was removed (pellet) FGD bypass, improved availabil

4、ity and integrated desulphurization efficiency of desulfurization facilities. 1-September, Yixin sintered steel (pellet) desulfurization facilities running stable, desulfurization efficiency desulfurization facilities can reach above 80%; min light company two sintering machines of desulfurization f

5、acilities running stable, integrated desulphurization efficiency can reach 80%. 2. wastewater treatment plant emissions. Strengthening sewage treatment plant daily environmental regulation, and urge enterprises to standardize the operation of sewage treatment facilities to ensure that . Level of eut

6、rophication. In marine sediments once total chromium, copper, lead, and mercury, arsenic and other 6 indicators can reach the marine sediments of limit values of category II quality standard requirements. Third, Jingang monitoring groundwater quality indices have met the standards for groundwater qu

7、ality (GB/T14848-93) category 3 standards, groundwater quality is good, meet the zoning requirements. (E) the ecological County to create a working 1. create eco-cell. Currently, I County provincial ecological County within industry material prepared work basic ready, County has 10 a township throug

8、h provincial above ecological Township acceptance and named, which Fengshan, and Matsuyama, and fly bamboo through national ecological Township acceptance and named, bi in, and Jian Jiang, and in the room, and Huo Kou, and TA, and started through national acceptance; County has 167 a village through

9、 city level above village named, ecological cell created has reached provincial ecological County assessment requirements. 2. environmental remediation projects in rural areas. 2013 rural environmental comprehensive renovation project involved 4 townships (White Tower, beginning, Sealand, Hong Yang)

10、 projects with a total investment of 6.4367 million Yuan, the Central grant of 2.3 million Yuan, provincial matching of 2.7 million Yuan, County finance supporting 1.4367 million Yuan. Time frame for completion end of 2014. As of May 4 Township projects have been completed and put into use, June 8,

11、through acceptance of the expert group. Currently about 3 million yuan of special funds allocated, the remaining funds to finish the budget of the project allocated. 3. livestock breeding pollution control work. Attention of the County Government to develop the further strengthening of 2015 views of

12、 livestock breeding pollution control work (Luo Zheng Heald (2015), 148th) in accordance with the year abatement and water supply, urban demolition, combined with the project principle, 9 towns in our County involvingThis Conference is by municipal Standing Committee research decided held of, main t

13、ask is in-depth learning implement XI General Secretary on two learn a do learning education of important indicates spirit and provincial Secretary XXX important speech spirit, according to central deployment and provincial requirements, on I city two learn a do learning education work for arrangeme

14、nts deployment, education guide General members further firm ideal faith, and keep on party loyalty, and set breeze upright, and courage to play as, for in province first full built well-off social, and Building higher levels of ecological vitality city provide a strong organizational guarantee of h

15、appiness. All party members in the Constitution Party rules, series of speeches, be qualified party members education, Party Central Committee to deepen the inner-party education, advancing the comprehensive yet another important practice in strictly administering the party, is to promote the inner-

16、party education from key minority to the vast number of party members expanded, from the concentration of important measures to extend education to regular education, is leading the task of party building this year. This year, the XI General Secretary on many occasions two study and education issued

17、 instructions, profoundly illustrates the significance of education, brilliantly describes the overall objectives, basic requirements and main tasks of education, made clear that the main responsibility of the head of the party organization at all levels and shall carry out, point in the right direc

18、tion for the us to carry out study and education, provide the fundamental follow. On April 6, Liu Yunshan, Comrade Zhao Leji in Central two Forum on educational work, a careful deployment of this work, put forward a clear requirement. On April 13, the Party Secretary, Xie Fuzhan, Director of the pro

19、vincial peoples Congress, the provinces two study educational Conference, made specific arrangements to carry out study and education in the province. We want to seriously study led And further implementation. Party according to the spirit of the Central and provincial requirements, based on actual

20、city, research has developed a two educational programmes and study contents specific programmes, we want to pay special attention to follow-up. Now, I make a few remarks. First, deepening understanding, enhancing grasp two educational responsibility since the partys 18, Comrade XI Jinping as Genera

21、l Secretary of the CPC Central Committee made a series of major deployment around the partys construction, making a series of punch, construction of a new political styles and the aspirations of the Party greatly condensed. Two study and education, reflects the interlocking, step by step, further pr

22、omote the comprehensive strictly administering the partys firm determination and political will, to push forward the four comprehensive strategy is of great significance. We should be supported by political and overall深圳市地铁5号线布吉、坂田段交通疏解之布坂联络道市政工程环境影响报告书(简本)深圳市地铁5号线布吉、坂田段交通疏解之布坂联络道市政工程环境影响报告书(简本)建设单位

23、:深圳市交通运输委员会评价单位:重庆市环境保护工程设计研究院有限公司2013. 1banned area, focused on the pig-breeding farms in water source project construction for tuiyang removed. Up to now have been removed 46 (dismantling was 87), removed an area of 27994.72 square meters. (F) the environmental emergency management 1. improve the

24、environmental emergency management. 2015 I Council organization prepared has luoyuan burst environment event emergency plans, and luoyuan EPA burst environment event emergency plans, and luoyuan life drinking water water reserves burst environment event emergency plans, and luoyuan atmosphere heavy

25、pollution emergency plans 4 this emergency plans, and in superior environmental sector record; while, organization coordination area within 9 home Enterprise completed has environment emergency plans prepared, and assessment and record work. 2. strengthening environmental emergency response training

26、. 2015 I was personnel participated in environmental emergency management training organized by the provincial environmental protection Department, in July and bring together area significant source of risk business has 14 of the emergency management methods study, and urge enterprises to do environ

27、mental emergency management of the whole process. 3. a comprehensive environmental security troubleshooting. In 2015, I dispatched a total of 72 passengers on the area of environmental safety Enterprise troubleshooting and found the problem requires corrective action in a timely manner, eliminating

28、environmental safety and dust explosion in September, organizations . General requirements take infinite time, say hello, dont listen to report, went straight to the site, direct examination, in-depth troubleshooting problems with environmental law and environmental risks, and to highlight the envir

29、onmental issues to investigate and punish, reform in place. As of October 15, has the 95 companies to inspect, and to troubleshoot the source of environmental risk, require enterprises to environmental risks immediate rectification. Breach of the construction project environmental impact assessment

30、system and the three simultaneous 24 enterprises that have been granted acceptance issued rectification notices (currently has 4 acceptance). Increase the frequency of drinking water source protection area inspections, ensuring that found in drinking water source in livestock feeding and woodlands p

31、roblems stopped immediately and inform the territorial administration, ensure the safety of drinking water. In my County 9 waste-producing enterprise registration, transfer, transfer site supervision and manage the whole process for approval. 2. effectively combating environmental offences. Keep the

32、 pressure situation to effectively combat environmental violations and focus our enforcement efforts, take the form of regular or ad hoc basis to strengthen the key industrial enterprises and stone environmental law enforcement inspections, discover for various types of environmental violations, tim

33、ely reporting and timely processing. As of October 15, the County has issued a limited change notices 31, filed 38, fines for a total of 1.595 million Yuan. Transferred to the two cases of illegal disposal of hazardous waste, with the local Government to demolish an illegal refineries, shutting off

34、5 environmental safety of steel slag processing enterprises. 3. improve the monitoring system. I completed 4 air automatic monitoring stations built and put into operation, in which County Environmental Protection Bureau with County Hospital in Fuzhou City Environmentalheight, deep understanding of

35、two study and education on strengthening education of party members and cadres and building a contingent of cadres with high quality, maintaining and developing the partys advanced nature and purity of the significance of practical thought and action into Central and provincial requirements. First,

36、the two study and education, is continuously strengthening the partys ideological and political construction of major deployment. Attach importance to party ideology, is the specialty of our party, since the partys 18 distinct characteristic of strictly administering the party. XI General Secretary

37、pointed out that our party must improve itself, the first task is to strengthen ideological and political construction, the key is the educational management of party members and cadres. At present, the ideas and values have become increasingly active, social trends are largely stirring blend, cultu

38、ral exchanges and the complexity of the situation, drove, some party members ideological and political problems, there is an urgent need to strengthen party ideology: clearing the fog, was centering. Like, some belief confused, three a confidence insufficient, praised Western value concept; some spi

39、rit empty, not letter Marty letter ghosts; some political discipline relaxation, in party not statements party, and not love party, and not nursing party, and not for party, even denied party of some most basic of principles and position; some organization discipline lax, not by provides participate

40、 in party of organised, not completed party distribution of task, not by party of organization principles do; some egoism serious, and people race Lee, and self-dealing; some depressed, and escape responsibility, Omission, not as good as some moral decline, violating public morality, professional et

41、hics and family virtues, not personal morality; some honesty and self-discipline awareness is not strong, with no fear, lawlessness, abuse, and corruption among political, and so on. These problems, after all, and ignore the Constitution Party rules, ignore advanced theory, and lack of sense of cons

42、ciousness, consciousness, pioneer of the party has a lot to do with it. Thought, belief and faith, stick to the spiritual pursuit of Communists, has always been the Communists to settle down at all. Two study and education, is to enable each party to party rules etched in the heart of the party Cons

43、titution, and speech into a series of powerful weapon, clearing the barriers and gain the fetters of the mind, improve the ideological and political quality, worthy of the glorious title of the party members. Second, the two study and education, comprehensively strengthen the construction of grass-r

44、oots party organizations and party members is an important . Awake, our party members and party organizations, especially at the grassroots level, some of the party members quality is not high, lax discipline and some primary party organizations are weak and lax, wiped out some grassroots cadres as,

45、 chaos as, thick friends, eating, and so on. These problems are like47第1章 建设项目概况深圳市地铁5号线布吉、坂田段交通疏解之布坂联络道市政工程项目于2008年取得关于地铁5号线布吉、坂田段交通疏解工程项目建议书的批复(深发改2008 1642号)。项目位于深圳中部,是坂田、布吉两个经济发达地区之间联络的主要通道,与永香路、华龙路、嘉兴路、吉华路、龙沙路及三联路发生交通联系,其建设不但对坂田街道、布吉街道、深圳中部组团、龙岗区乃至整个深圳市的经济发展,均具有重大意义。道路选线呈东西走向。起点西接永香路、坂田环城路交叉口,设

46、L=1848.197m长直线,以净距15.0m分左右两线东行,在0+5000+550路段上新建穿南坪快速路跨线桥,至麻竹山隧道入口;左线隧道设计起点0+673、右线隧道设计起点0+691,以分离式隧道形式穿越麻竹山。根据收集的设计资料,线路在1+240处上跨厦深铁路(隧道)、在1+630处下穿清平高速公路,至上水径石场出洞。左线隧道设计终点桩号ZK1+788.4、长1115.4m,右线隧道设计终点桩号K1+789、长1098m。隧道出入口均采用R=1000m的“S”型曲线并线。线路出洞并线后继续东行,设R=850m及R=700m的“S”型平曲线先左转再右转,在2+240处与华龙路平交,再穿水径

47、石场、跨地铁五号线,在2+980处跨龙沙路,最后到达设计终点(桩号3+262.91),与三联路相接,道路设计全长3.26km。本项目永久性占用土地总面积116212m2,临时占地面积约为13250m2。本次工程需拆迁砖混结构物996m2、临时工棚面积3365m2。项目总投资约65477.21万元,拟于2012年12月开工,2014年1月完工,施工期为13个月。表1-1 主要技术标准名称内容布坂联络道水径立交道路等级城市主干路立交匝道、辅道设计车速50km/h30、40km/h车道数双向6车道单向单车道、单向双车道道路宽度50m单车道7m、双车道8m道路净空5.0m5.0m路面结构沥青混凝土路面

48、沥青混凝土路面路面标准轴载BZZ-100BZZ-100桥涵隧道设计荷载城-A级,公路-级城-A级,公路-级设计洪水频率1/1001/100地震动峰值加速度0.10g0.10g工程道路设计等级为城市主干路,设计方案中交通预测年限取20年。本报告交通量预测年限与设计方案保持一致,以2014年作为项目交通量预测基年,取2021年作为近期预测年限,2030年为远期预测年限。表1-2 布坂联络道各特征年交通预测结果一览表(引用自设计方案)路段交通量路段高峰小时交通量(Pcu/h-单向)路段平均日交通量(Pcu/d-双向)2012年2020年2030年2012年2020年2030年坂田环城路华龙路336437004070420504625050875华龙路龙沙路350638564242438254820053025隧道采用新奥法施工,施工顺序可以概括为:开挖一次支护二次支护,隧道开挖采用钻爆法施工。开挖作业的内容依次包括:钻孔、装药、爆破、通风、出渣等。第一次支护作业包括:一次喷射混凝土、打锚杆、联网、立钢拱架、复喷混凝土。一次支护后,在围岩变形趋于稳定时,进行第二次支护和封底,即永久性的支护(或是补喷射混凝土,或是浇注混凝土内拱)。隧道挖、运、喷、衬等工序采用一条龙机械化施工。不同围岩采用不同开挖方法,一般级围岩地段在超前注浆小导管的保护下采用双侧壁导坑法施工;洞口级围岩地段在超前大管棚和

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1