na包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc

上传人:本田雅阁 文档编号:2240027 上传时间:2019-03-09 格式:DOC 页数:99 大小:490.51KB
返回 下载 相关 举报
na包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc_第1页
第1页 / 共99页
na包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc_第2页
第2页 / 共99页
na包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc_第3页
第3页 / 共99页
亲,该文档总共99页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《na包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc》由会员分享,可在线阅读,更多相关《na包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc(99页珍藏版)》请在三一文库上搜索。

1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons

2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi

3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical

4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta

5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o

6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project

7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc

8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d

9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy

10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef

11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont

12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according

13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 投标文件北方联合电力有限责任公司包头第二热电

14、厂#4机组烟气脱硫旁路拆除改造项目 投 标 文 件 投标单位: 日 期: 年 月 日Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Department and class activities! in order to create

15、 a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tri

16、ed, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor teachers good, proper guidance, thanks to 46 students in the class will work closely together, to

17、work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five declarations of good party branch branch is a fortress, a party member is a banner. Fighting in the railway engineering construction

18、 Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. Holding high the flag of our party members, unite and lead staff on the difficulti

19、es, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the project began, Headquarters Branch is tightly around the center of its activities. Face South, climate is wet, sooner or later temp

20、erature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues Zhijian each other help, each other learning business knowledge, overcome temporarily

21、difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. Since its start, I command under the correct leadership of the party branch in the Group and the superior party, centering on bu

22、ilding a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, actively working. In command personnel less, and task heavy of situation Xia, all members always according to party stronger, and style to are, and service better, and efficien

23、cy to high of requirements, from overall starting, better to completed has production organization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of results, get has owners and the Group and grass-r

24、oots units of praise. First, give full play to the exemplary role of party members. The exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. We pay close attention to party buildi

25、ng, requires political party members and cadres must take the lead in learning, set strict demands on themselves, . 包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 投标文件 04725199097-803 04725199095-805 102 * 包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 投标文件 目 录1、 投标书2、 投标书附录3、 开标一览表4、 法定代表人身份证明书5、 法定代表人授权委托书6、 投标保证金7、 预 算8、 设计方案、施工组织设计、系统调试方案9

26、、 需提交的其它资料10、公司企业简介1、投标书投 标 书 北方联合电力有限责任公司包头第二热电厂 (招标人):1. 根据已收到的 包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 (工程名称)招标文件,我单位经考察现场和研究上述工程施工招标文件的投标须知、合同条件、工程规范、技术条件和其他有关文件后,我方愿以 人民币壹佰陆拾柒万捌仟零玖元 (大写) ¥1678009 (小写) 的投标报价并按上述图纸、合同条款、工程建设标准、技术规范的条件要求承包上述工程的施工、竣工,并承担任何质量缺陷保修责任。 2. 一旦我方中标,我方保证在 双方合同约定的时间 开工, 双方合同约定的时间 日竣工(总工期为

27、107 日历天)。3. 一旦我方中标,我方质量承诺为: 符合国家验收标准 4. 一旦我方中标,我方安全承诺为: 零事故、无人身轻伤 5. 我方承认投标函附录是我方投标函的组成部分。6. 我方同意所递交的投标文件在“投标须知”规定的投标有效期内有效,在此期间内我方投标有可能中标,我方将受此约束。7. 除非另外达成协议并生效,你方的中标通知书和本投标文件将构成约束我们双方的合同。8. 我方的投标保证金:已向招标代理机构递交贰万肆仟元整(¥24000)投标人: (盖章) 单位地址:包头市青山区幸福路5#街坊法定代表人或授权委托人: (签字、盖章)邮政编码:014030 电 话:0472-315893

28、6 传 真:0472-3158953 开户银行名称:中国农业银行青山支行开户行地址:包头市青山区科学路银行帐号:608101040016638电 话:3318533 日 期:2014年6月26日2、 投标书附录 投标书附录招标人的名称和地址: 北方联合电力有限责任公司包头第二热电厂 地址内蒙古包头市青山区厂前路 投标人的名称和地址: 内蒙古世龙股份有限公司 地址包头市青山区科学路 发出开工通知的时间: 双方合同约定 竣工的时间为 107 天(日历天数)进入现场的时间:发出开工通知后的 3 天履约保证金的数额:合同价格的 1.5 %提交进度计划的时间:合同生效日期后 5 天工程的误期损害赔偿:合

29、同中约定工程误期损害赔偿费的限额:合同中约定质保金为合同价格的 5 %工程保险金额:合同中约定第三方保险金额:合同中约定投标人:内蒙古世龙股份有限公司 中冶东方工程技术有限公司 北京国电智深控制技术有限公司 (盖章)法定代表人(授权委托人)签字: 2014年6月26日3、开标一览表开标一览表 投标人内蒙古世龙股份有限公司中冶东方工程技术有限公司北京国电智深控制技术有限公司地 址包头市青山区幸福路5#街坊法定代表人胡逢斌企业性质股份有限公司企业等级机电设备安装贰级投标项目包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 承包范围吸收塔入口烟道增设两级事故喷淋系统,一级为通过事故喷淋水泵进行喷淋降温

30、,二级为消防水直接进行事故喷淋降低烟温;塔运行液位设置溢油口2个及相应管道。进入吸收塔的油污溢流排放至事故浆液箱,在将来的运行过程中,逐渐消解污染浆液;范围内相关设备、管道、阀门、测点、仪表等的供货、安装和配电,相关电缆的供货、敷设、接线、仪表管路安装、桥架安装等;本改造工作范围内的设备拆除、安装、调试、试运技术服务等工作; #4机组烟气脱硫旁路拆除改造工程后主机DCS到脱硫DCS的所有逻辑组态调整、系统调试及电缆供货、电缆敷设、接线;以上所述项目脱硫及主机DCS控制系统逻辑设计与操作画面的修改。报 价(元)(大写): (小写): 工 期107天(#1机组20天、#2机组48天、#3机组3天、

31、#4机组36天)质量承诺符合国家验收标准安全承诺零事故、无人身轻伤质保期一年注:1本表要在表头加盖投标人公章及法定代表人印章 2 如本表内容与投标书内容不符,以投标书内容为准。4、法定代表人身份证明书法 定 代 表 人 身 份 证 明 书投标人名称: 内蒙古世龙股份有限公司 地 址: 包头市青山区幸福路5#街坊 姓名: 性别: 男 年龄: 64 职务: 董事长 系 内蒙古世龙股份有限公司 的法定代表人。为施工、竣工和保修的工程,签署上述工程的投标文件、进行合同谈判、签署合同和处理与之有关的一切事务。特此证明。投标人:内蒙古世龙股份有限公司 (盖章)日 期: 2014 年 6 月 26 日附:法

32、定代表人身份证复印件 5、法定代表人授权委托书法 定 代 表 人 授 权 委 托 书本授权委托书声明:我 (姓名)系 内蒙古世龙股份有限公司 (投标人名称)的法定代表人,现授权委托 内蒙古世龙股份有限公司 (单位名称) 的 (姓名)为我公司签署本工程已递交的投标文件的法定代表人授权委托代理人,代理人全权代表我所签署的本工程已递交的投标文件内容及在开标、评标合同谈判过程中所签署的一切文件和处理与之有关的事务,我均予以承认。代理人无转委托权,特此委托。代理人: 王轩 性别: 男 年龄: 28 身份证号码: 职务: 项目经理 投 标 人:内蒙古世龙股份有限公司 (盖章)法定代表人: (签字或盖章)授

33、权委托日期: 2014 年 6 月 26 日6、投标保证金投标保证金附件: 附表附表一:总报价表(表格附后)附表二:工程主要管理人员表(表格附后)附表三:近三年完成与本合同相似的业绩情况(表格附后)附表一:总报价表序号项 目 名 称报价(万元)备 注1包头第二热电厂#4机组烟气脱硫旁路拆除拆除改造项目167800923456总 计1678009分项报价表序号名 称报价(元)备注1设计费2施工费3材料价费4事故喷淋系统费5DCS接入费6环保设施费7运输费8技术培训费9其他合计:投标人:内蒙古世龙股份有限公司 中冶东方工程技术有限公司 北京国电智深控制技术有限公司 (盖章)法定代表人或授权代理人:

34、(签字或盖章) 日 期: 2014年6月26日C注:此表请务必装订在投标文件的正、副本中。同时单独密封递交小信封一式三份附表二:工程主要技术人员简历拟投入本工程主要技术人员情况表岗位名称姓名年龄专业职务职称职业资格总工程师工民建工程师高级工程师项目经理市政公用工程项目经理助理工程师二级建造师施工工程师建筑总经理中级工程师一级建造师设计工程师机电工程师工程师二建建造师调试工程师主任工程师工程师计划负责人工程师工程师施工负责人中级施工员安全负责人中级安全员资料负责人资料员材料负责人材料员合同预算员中级土建预算员注:只填写已完成类似工程项目情况附表三:近三年完成与本合同类似的业绩情况序号招标人项目名

35、称与承包范围工程内容开/竣工日期工程评定情况1包头市森都碳素有限公司70m烟囱1座烟囱70m,基础3m2012.8.12-2012.11.12良好2包头市森都碳素有限公司15万吨煅烧烟囱1座烟囱基础及筒体2013良好3包头市森都碳素有限公司15万吨焙烧烟囱1座烟囱基础及筒体2013良好4武汉钢电股份有限公司2013年1#机组烟脱硝、脱硫工程1#机组烟脱硝、脱硫2013良好注:提供能证明业绩的中标通知书或合同。 7、工程预算书 包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 工程预算书投 标 人: 法定代表人: (签字或盖章) 日 期: 2014 年 6 月 26 日8、 (1)设计方案 包头第

36、二热电厂#4机组烟气脱硫旁路拆除改造项目 设计方案投 标 人: 法定代表人: (签字或盖章) 日 期: 2014 年 6 月 26 日后附图纸册(2)施工组织设计 包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 施工组织设计投 标 人: 法定代表人: (签字或盖章) 日 期: 2014 年 6 月 26 日编制原则、编制依据和范围项目名称:北方联合电力有限责任公司包头第二热电厂#4机组烟气脱硫旁路拆除改造项目项目法人:北方联合电力有限责任公司包头市第二热电厂工程地点:包头第二热电厂(一)编制原则 根据现场实际情况以及施工验收规范、总公司技术质量管理办法及安全技术管理办法为依据,结合本工程具体情

37、况。科学严谨地编制该工程施工组织设计。1.编制原则如下: 1.1认真贯彻执行建设工程各项方针、政策,严格执行工程建设程序。 1.2遵循建筑施工工艺及其技术规范,坚持合理的施工程序和施工顺序。 1.3与当地相关部门密切配合,搞好工程建设协调工作和环境保护工作。 1.4结合本工程具体特点,配备具有类似施工经验的专业队伍,选择性能良好的机械设备,科学合理的配备生产要素,提高劳动生产率。 1.5采用先进施工技术,科学制定施工方案。 1.6缩短施工工期,降低工程成本。 1.7采用先进的施工组织管理技术,统筹计划,合理安排。组织分段平行流水作业、均衡生产。 1.8合理储存物资,减少物资运输量及二次倒运。

38、1.9科学布置施工平面图。 1.10合理调查地上及地下设施并进行保护。(二)编制依据 国家现行工程建设政策、法规和规范及验收标准:2.1包头第二热电厂#4机组烟气脱硫旁路拆除改造工程招标文件;2.2 DL5210.2-2010电力建设施工质量验收及评价规程(第二部份:锅炉机组);2.3 DL/T5210.7-2010电力建设施工质量验收及评价规程(第七部份:焊接);2.4 DL/T869-2004火力发电厂焊接技术规程焊接篇;2.5发电厂检修规程;2.6电力安全工作规程2.7施工组织设计编制纲要(2003年版)(三)引用标准及规范3.1电力建设施工及验收标准规范DL/5047-95锅炉机组篇、

39、DL/5007-92火电厂焊接篇、DL/T821-02钢制承压管道对接、焊接、接头射线检验篇、DLT/820-02管道焊接接头超波检验技术规范、SDJ279-90热工仪表控制篇;3.2电力建设施工及验收标准规范SDJ69-87建筑工程篇SDJ280-90水工结构工程篇;3.3火电施工质量检验及评定标准锅炉篇、管道篇、焊接篇、电气篇、热工仪表及控制装置篇;3.4火力发电工程施工组织设计导则国家电力公司电源建设部;3.5压力钢管制造安装及验收规范DL5017-93;3.6电力建设施工安全工作规程DL5009.1-2002;3.7电气装置安装工程施工质量检验及评定规程。施工组织设计第一节、总述对于本

40、工程现场工程管理的有关工作范围、工作责任、相互关系及主要的管理标准等问题,以及对工程实施的具体指导原则提出规范性条款,作为我公司的行为准则。工程简介:本次脱硫烟气旁路拆除改造工程为设计、供货、施工、调试总承包,我方负责本项工程的图纸设计、设备采购、运输储存、制造安装、原设备拆除、土建和调试等工作。针对本次改造所要达到的目的,基本的改造范围如下:1吸收塔入口烟道增设两级事故喷淋系统,一级为通过事故喷淋水泵进行喷淋降温,二级为消防水直接进行事故喷淋降低烟温。2吸收塔设置2个溢流口及相应管道。3范围内相关阀门、测点、仪表等的供货、安装和配电,相关电缆的供货、敷设、接线、仪表管路安装、桥架安装等。4

41、#4机组脱硫烟气旁路拆除改造工作范围内的设备安装、调试、试运技术服务等工作;5 #4机组脱硫烟气旁路拆除改造工程后主机DCS到脱硫DCS的相关逻辑组态调整、系统调试及电缆供货、电缆敷设、接线等工作。6每塔增设一条石灰石浆液供浆管道,与现有供浆管道形成互为备用管道。7 以上所述项目涉及脱硫及主机DCS控制系统逻辑设计与操作画面的修改等工作。第二节、工程管理本工程中,本公司全部自己承建所承包的工程,任何工程项目决不分包,并严格遵守有关“外来劳动力管理条例”,不予招收零星施工人员,以加强施工管理和安全。 本工程中,本公司施工人员无条件接受业主所指定的现场项目部的总协调、总管理和总控制,一切施工事宜均通过项目部进行,在项目部的统一安排下精心施工。 本工程中,本公司保证所确定的工程项目经理和主要技术人员、