资源描述

《bu安徽某高层住宅楼施工组织设计(框架异形柱)_secret.doc》由会员分享,可在线阅读,更多相关《bu安徽某高层住宅楼施工组织设计(框架异形柱)_secret.doc(170页珍藏版)》请在三一文库上搜索。

1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit

2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,

3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi

4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail

5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the

6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi

7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free

8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i

9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al

10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material

11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev

12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan

13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to

14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen

15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic

16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of

17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple

18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize

19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma

20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels

21、cadres in enterprise development in the*家园-3#楼施工组织设计目 录第一章 编制依据 . 1第二章 工程概况 4第一节 工程概况 . 4第二节 施工现场概况 8第三章 施工部署 9 第一节 工程管理体系及人员配备 . 10 第二节 施工总体安排 . 11第三节 主要施工机具设备选择和需求计划 . 11第四节 垂直、水平运输 . 11第四章 施工进度计划与进度控制 . 12第一节 主要分部分项控制工期及工程总工期安排. 13第二节 工期保证措施 . 13第五章 施工总平面布置 . 17第一节、主要临时设施 . 18第二节、施工用水、电 . 18第六章 *

22、家园3#楼主要施工方案 20第一节 施工测量技术方案 . 21第二节 土方工程施工方案 . 27第三节 地下室防水施工方案 . 30第四节 模板工程施工方案 . 34第五节 钢筋工程施工方案 . 50第六节 砼工程施工方案 59第七节 砌筑工程施工方案 68 第八节 楼地面工程施工方案 73第九节 装饰工程施工方案 77第十节 门窗工程施工方案 82第十一节 屋面工程施工方案 85第十二节 给排水管道及洁具安装施工方案 89第七章 重点分部分项工程施工技术质量保证措施 94第一节 管道及卫生间防渗漏施工 95第二节 铝窗防渗施工 95第三节 墙面防渗措施 95第四节 防止地面空鼓、开裂措施 9

23、6第五节 防止主体结构质量通病的措施 96第六节 屋面防水施工措施 97第八章 季节性施工措施 98第一节 冬期施工措施 99第二节 雨期施工措施 . 103第三节 夏期施工措施 . 103第九章 质量目标及质量保证计划 105第一节 质量目标 . 106第二节 质量管理和质量保证体系 106第三节 质量管理组织设置说明 107第四节 项目质量管理责任制 107第五节 项目质量管理制度 111第六节 土建质量保证措施 123第七节 安装工程施工质量保证措施 125第八节 分部分项工程技术保证措施 126第十章 安全生产技术措施 128第一节 安全生产及消防制度 129第二节 安全生产措施 13

24、1第三节 机电设备施工的安全事项 132第四节 人货电梯和塔吊安全措施 133第五节 各主要工序施工安全措施 134第十一章 施工期间的消防措施 139第十二章 确保文明施工的技术组织措施 141第一节 文明施工目标计划及组织管理 142第二节 计划管理 144第三节 环保、卫生管理 144第四节 加强现场技术管理 145第五节 加强现场材料管理 . 145第六节 施工现场场容管理 146第七节 生活区的管理 147第八节 其他具体措施 147第九节 文明施工检查措施 148第十三章 先进的工艺方法以及节约措施 150第十四章 各专业工种配合措施 153第十五章 附录 1551、*家园3#楼工

25、程施工组织机构 2、*家园3#楼工程质量管理体系3、*家园3#楼工程安全管理体系4、*家园3#楼工程施工机械表5、*家园3#楼工程周转材料及劳动力计划表第一章 编 制 依 据第一章 编制依据1、本工程施工蓝图、施工合同及现场踏勘纪实2、国家现行建筑安装工程施工及验收规范(含安装部分) 工程测量规范GB50026-93 混凝土结构工程施工质量验收规范 GB50204-2002 钢筋焊接及验收规程JGJ18-96钢筋焊接接头试验方法标准JGJ/T27-2001 建筑工程冬期施工规程JGJ104-97 烧结普通砖GB/5101-1998 屋面工程质量验收规范GB50207-2002 建筑装饰装修工程

26、质量及验收规范GB50210-2001 建筑工程饰面砖粘结强度检验标准JGJ110-97 建筑地面工程施工质量验收规范GB50209-2002 地下防水工程质量验收规范GBJ208-2002 砌体工程施工质量验收规范GB50203-2002 建筑地基基础工程施工质量验收规范GB50202-2002 建筑工程施工质量验收统一标准GB50300-2001 建筑工程质量检验评定标准GBJ301-88 建筑给排水及采暖工程施工质量验收规范GB50242-2002 建筑电气工程施工质量验收规范GB50303-2002 硬聚氯乙烯(PVC-U)双壁波纹排水管道工程设计-施工及验收规范DBJ/T34-202

27、-2000通风与空调工程施工质量验收规范GB50243-2002 3、双方约定的建筑、安装预算定额4、国家有关建筑、安装的法律、法规和合肥市地方有关规定及要求5、建筑安装工程安全技术操作规程及有关规定 第二章 工 程 概 况第二章 工程概况*家园3#楼为二类高层建筑,位于经济开发区*家园住宅小区内,是以宿舍为主的高档住宅楼。本工程总用地面积为:800m,总建筑面积为14771.5 m,耐火等级为二级,按七度抗震设计,系地下1层,地上18层的框架异形柱结构。第一节 工 程 概 况工程名称:*家园3#住宅楼建设单位:*房地产开发有限公司设计单位:质监单位:监理单位:施工单位:建筑面积:14771.

28、5m层 数:地下一层,地上十八层层 高:3.00m总 高:75.158m工程级别:二类高层建筑耐火等级:二级使用年限:50年抗震设防烈度:七度结构类型:框架异形柱屋面防水等级:级地下室防水等级:级一、建筑概况 室内装修1、地下室内墙面为12厚1:3水泥砂浆掺3%防水剂找平,5厚1:3水泥防水砂浆面层,刷内墙涂料二度;2、用于一层大厅及公共电梯间,地面墙面均为花岗岩铺贴;3、公共走廊、公共楼梯间、电梯机房内墙,12厚1:3水泥砂浆打底6厚1:3水泥砂浆面层,刷白色内墙涂料二度; 4、客厅、卧室、餐厅、书房内墙,8厚水泥砂浆打底、10厚保温砂浆、8厚保温砂浆、6厚1:2水泥砂浆面层,刷内墙涂料二道

29、。 室外装修1、 外墙面8厚1:3防水沙浆打底、8厚保温砂浆一遍、8厚保温砂浆二遍、6厚1:3防水砂浆面层,满涂腻子两遍、刷外墙涂料两遍。2、 局部外墙面,12厚1:3防水砂浆打底、8厚保温砂浆一遍、8厚保温砂浆二遍、5厚聚合物水泥砂浆贴面砖、素水泥浆勾缝。 顶棚装修楼梯间、电梯间公共过道顶棚抹灰批腻子、刷内墙涂料,其余室内顶棚批素水泥腻子,由用户二次装修。 楼地面装修1、楼面:用于楼层公共走廊的为10厚600600地面砖面层;用于室内楼面的为20厚1:3水泥砂浆面层;楼面厨房、卫生间地面采用SBS改性沥青聚氨脂防水涂料两道,四周上返150高; 2、地面:用于地下室地面,50厚细石砼面层,80

30、厚碎砖垫层找坡,坡度为1%;一层室内地面,20厚1:3水泥砂浆;(3) 一层大厅及电梯间公共过道为花岗岩面层。 屋面做法1、上人屋面做法为砼结构层;1:8水泥膨胀珍珠岩找坡;20厚1:3水泥沙浆找平层;级防水、两道设防,300/2和200/2上下各一道;30厚挤塑聚苯乙烯泡沫塑料保温板;40厚20现浇细石砼,内配6150双向钢筋网片,保护层10mm,分格缝宽20mm,纵横间距6M,缝中用密封材料嵌缝;2、 坡屋面做法为砼结构层;1:3水泥砂浆找平层; 2厚弹性水泥;30厚挤塑聚苯乙烯保温板加8尼龙锚拴;30厚1:2.5水泥砂浆加4200钢筋网;双层油毡瓦。二、结 构 概 况1、基础结构基础采用

31、钢筋砼筏板基础,地下室筏板厚度为1.1m,筏板底标高为-5.35m,局部为-7.65m,砼强度等级为C30,地下室防水等级为二级,地下室高度为4.25m、剪力墙,暗柱砼为C35,梁板砼为C30。2、上部结构上部结构类型为现浇钢筋砼框架异形柱结构,抗震等级为二级,构件的耐火等级为二级,属于二类高层民用建筑。上部结构竖向承重构件墙、柱砼至一层顶为C35,水平承重构件梁、板砼为C30;二至七层顶墙柱砼为C30,梁板为C25;八层至顶层墙、柱砼为C25,梁板为C20;其楼梯、构造柱的砼等级同该层砼级别相同。所有外墙、分户墙均为非承重粘土空心砖,墙厚200mm,内隔墙均为非承重粘土空心砖隔墙,墙厚120

32、mm,砌块强度等级不小于MU5,用M5混合砂浆砌筑。楼层结构高度为3m,建筑总高度为75.158米。第二节 施工现场概况*家园3#楼现场总用地面积约为4100m,拟建建筑物占地面积为800 m。该工程位于繁华大道与松林路交叉口,材料运输极为方便。目前“三通一平”及前期工作已完成,具备了施工条件。第三章 施 工 部 署第三章 施 工 部 署第一节 工程管理体系及人员配备为了保证*家园3#楼高标准、高质量、高速度、高效益地顺利实施。在本工程中我公司将按“项目法”施工,按ISO9001质量体系进行质量管理,科学地划分施工段,抢赶结构施工工期,合理地穿插设备安装及装饰,全面落实质量、安全、进度、文明的

33、施工目标。人员组织主要分成两大类,即施工管理层和施工劳务层。 1、施工管理层我公司将在全公司范围内调集精兵强将,项目经理由公司推荐,同时选配施工经验丰富、服务态度良好、勤奋实干的工程技术人员和管理人员,组建一个合理、高效的项目部班子。以确保工程从合同签订施工准备施工过程竣工验收整个过程中组织、指挥、管理、协调和控制。为该工程确保“琥珀杯”奠定基础。本工程施工管理体系,详见第十五章施工组织机构图 2、施工劳务层根据工程量和工期的要求,合理编排劳动力需用量计划,组织经过岗前教育、培训的工人有序进场。为该工程合理配备施工劳务层,是完成施工任务的关键,首先配备专业化强的技术工人,其中包括塔吊操作工、机械工、维修电工、电焊工等,这些人员在我公司曾参与过类似工程,具有丰富的实践经验,持有相应的上岗证。再配备普通技术工种,其中包括混凝土工、瓦工、架子工、油漆工、防水工等,并以施工过类似工程的施工人员为主进行组建。另外还配备一定数量的普工,这些人员主要来源为我集团所属的劳务公司的施工队伍,进场的队伍具有一定的素质,以保证本工程“高速、优质、低耗、安全”地完成。第二节 施工总体安排1、施工原则:先深,后浅;先地下,后地上;先室内,后室外;先土建,后装饰、安装;在地下室回填时,完成地下管线的予埋,避免重复开挖。2、场外加工:本工程铝合金门窗、防火门、铸铁栏杆等,可在