资源描述

《fb平改坡施工组织设计.doc》由会员分享,可在线阅读,更多相关《fb平改坡施工组织设计.doc(112页珍藏版)》请在三一文库上搜索。

1、les disposicions pertinents de lestat a la verticalitat seguretat supervisi i gesti departaments per avaluar operacions especials unitat nacional ha aconseguit qualificat personal format certificat abans de participar en el corresponent treball o gesti. 7, ls de la unitat dequipament especial ha de

2、ser seguretat equip especial dequipament especial operador educaci i formaci, i operadors dequips especials disposen del material necessari especial per assegurar la seguretat operacional de coneixement. 14, pont de normes de seguretat operaci 1, capit, el monitor i els principals tipus de treballad

3、ors ha entrenat a correus. Unitat 2, el treballador ha de tenir suficient energia, temps de treball no pot excedir de 12 hores al dia. 3, personal de la unitat est estrictament prohibit beure. 4, est estrictament prohibit per a erecci mquina de biga moviment longitudinal i lexterior a la nit. 5, un

4、pont en ambds costats de lrbita longitudinal alta els requisits de nivell, per mantenir un equilibri. Els requisits lateral pista datletisme i un control estricte de lespai, tres pistes ha de ser parallel. 6, installaci de biga de formig de biaix pont, poca Erector, 0, 1, 2a fase, deixat per trontol

5、len i tornada, limport es calcula segons els angles oblics i lamplada de les rodes desquerra i dreta, per tal que els cotxes poden crrer sobre una pista horitzontal. 7, pont de desplaament longitudinal per fer tots els preparatius, un cop a lloc, Midway pausa el menys possible. 8, instal lar superio

6、r i inferior pendent vertical, desplaament longitudinal de mquina pont ha de tenir les mesures per evitar la diapositiva, com ara filet triangular rodes anterior i posterior per a la protecci, espai especial columna 1, molt a prop de la biga, al control de latenci. 9, un pont penjant penjant de prov

7、ar que la installaci de la mquina ha de ser corregut, tamb es pot utilitzar desprs de la crrega de la prova de la biga de formig i pont erigir mquina i llavors crrer per comenar la feina dinstallaci. 10, quan erigir installaci mquina, comprovacions de seguretat regular, una seguretat integral compro

8、va cada installaci un forat ha de ser trobat per aturar el treball i tractada puntualment amb funcionament intermitent, treball mecnic i elctric amb malaltia no estan permeses. 11, la sobrecrrega doperaci dinstallaci no s perms. Nivell, ha de ser enfortida sobre terreny prou slida, coixinets Outrigg

9、er cal afegir per a incrementar la capacitat de la terra. (2) velocitat del vent s superior a 13.8M / s (equivalent a 6 vent), grua no deures, quan la longitud de bra s superior a 50 m quan la velocitat del vent no podr ser superior a 9.8M / s (lequivalent de 5 vent). I prestar atenci als efectes en

10、 lestabilitat de la grua, vent no penjar-se, davant el vent t alguns perills, alant el contrari. (3) estrictament segons la capacitat nominal quan laixecament de la taula i aixecar loperaci corba desociety; after after 60 years of development, the socialist society more full of life And vigor. The r

11、emarkable sign is in China adhere to the basic principles of scientific socialism, not lost ancestors, always adhere to dialectical materialism and historical materialism as the theoretical foundation, adhere to the to the realization of communism as the supreme ideal, adhere to the Party of the wor

12、king class as the core of leadership, insist to liberate and develop productivity is the fundamental task, adhere to represent the most numerous peoples fundamental interests, adhere to public ownership and according to work, distribution is the basis of the socialist economic system, adhere to the

13、position of the people as masters of the country is the essential characteristic of the socialist democratic politics, adhere to reform and improve the socialist system and institutional mechanisms, and so on. At the same time, our country socialist And with distinct Chinese characteristics, the roa

14、d of socialism with Chinese characteristics, the system of theories of socialism with Chinese characteristics and the socialist system with Chinese characteristics, are deeply rooted in the creative practice of hundreds of millions of peoples indomitable, timely response to practice innovation theor

15、y calls, rich heritage of both historical and cultural traditions of the Chinese nation, and let the Chinese people love to see and hear the Chinese style and Chinese style, comply with the requirements of the development of the times, reflect the common aspiration of the people, with distinct chara

16、cteristics of the practice, theoretical characteristics, national characteristics, characteristics of the times. Therefore, it can always maintain the vigor and vitality, and always guide contemporary China along the right direction stride forward. So we must always hold high the great banner of soc

17、ialism with Chinese characteristics unswervingly. On the other hand, Chinas socialist society is still in primary stage, which is Chinas construction of socialist modernization insurmountable historical stage, the need for hundreds of years time. Chinas socialist system was born in semi colonial and

18、 semi feudal society, productivity level is far behind in the developed capitalist countries, which determines the our country must experience a long primary stage, to realize in other countries under the conditions of capitalism to achieve industrialization and production in the market, socializati

19、on and modernization. Today, our country socialism has made remarkable tremendous To accelerate the pace of achievements, but our country fundamental realities of the country is still has a large population, weak thin, development is not balanced. Chinas economy has leapt to the world, but the per c

20、apita gross domestic product is still ranked in the world the 90%; economic sustained and rapid development, but the development is not balanced, coordinated, can not be continued problems are still prominent, the transformation of economic developmentManipulator is now used as a industrial robots i

21、n use, the control objectives often appear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid development in industrial automation as a separate subject. Manipulator application began to filter into welding, logistics, m

22、echanical processing, and other industries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use also brings great convenience to the staff. Precisely because of this robot to get peoples attention began to be a hi

23、gh degree of development. Labor rates, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller) is in various special circumstances and under special conditions set for mechanical devices. Now turned on the devel

24、opment of the microelectronics automatic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful development, now continues to develop as a factory automation standards. Because robots are good development of the

25、technology makes a good optimization of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and programming that can be mastered in a short time, so in the context of industrial PLC applications became ubiquitous. Mani

26、pulator in many developed country agriculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed line that uses a robotic arm, and so on. Today, the high level of automation combined with restrictions on the manipula

27、tor development level is slightly lower than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn of has a must of consolidation, understand has some usually didnt opportunities awareness in world range within some

28、leading level of knowledge has has must awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in both at home and abroad of research profile automation mechanical arm research began Yu 20th century medium-term, after

29、 years with with computer and automation technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluation standards, and its importance can be seen. Now original robotic arm spent most of mass production and use on the p

30、roduction line, which is programmed robotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect the external environment, but can still successfully complete like welding, painting, delivery as well as for material

31、s simple movements. Second generation mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand目 录第一章:编制说明41.1编制依据41.2编制目的5第二章 工程概况52.1工程概述52.2施工范围及

32、内容52.3工程主要特点及措施:6第三章 工程实现目标73.1质量目标73.2工期目标73.3安全目标73.4环境保护和文明施工目标73.5服务目标7第四章 现场组织机构84.1项目经理部组织结构图84.2现场组织机构84.3公司总部对项目部的授权84.4各管理人员职责及运作程序图84.5项目岗位职责和权限9第五章 施工部署及施工准备175.1施工部署175.2施工准备20第六章 主要分项工程施工方案和技术措施236.1工艺做法说明236.2施工测量放样工程236.3拆除清理、基层修复施工方案和技术措施236.4现浇结构钢筋施工方案与技术措施246.5现浇结构模板施工方案与技术措施276.6现

33、浇结构混凝土施工方案与技术措施286.7 钢屋架外加工296.8钢屋架安装方案与技术措施326.9 脚手架施工方案与技术措施356.10天棚、墙面乳胶漆施工方案与技术措施386.11屋顶树脂瓦施工方案与技术措施396.12 SBS改性沥青油毡防水406.13 植筋施工416.14 避雷施工42第七章 劳动力与主要设备材料计划467.1劳动力计划467.2物资材料计划467.3施工机械与质检仪器设备计划47第八章 施工总进度计划及保障措施488.1施工工期目标及总体安排488.2施工总进度计划488.3进度控制及保证措施48第九章 施工总平面图布置与管理529.1施工总平面布置依据529.2施工

34、总平面布置原则529.3施工总平面图的内容529.4施工平面管理53第十章 确保工程质量的技术组织措施5410.1质量控制范围5410.2质量管理的重点5410.3确保工程质量的技术组织措施保证体系图5410.4各部门和主要管理人员职责5410.5确保质量的技术保证措施5610.6质量控制的实施过程5610.7物资采购过程5810.8施工人员的控制5810.9机械控制58第十一章 确保特定日期性施工的技术组织措施5911.1节假日施工保证措施5911.2风沙季节施工保证措施59第十二章 安全管理和消防、文明、环保施工的技术组织措施6012.1确保工程安全管理措施6012.2消防施工保证措施63

35、12.3文明施工管理措施6412.4全面推行现场环保施工67第十三章 施工协调与配合工作6913.2与业主及监理的协调配合6913.3与设计单位的协调配合69第十四章 工程技术资料的管理7014.1技术资料管理的目的7014.2技术资料保密管理措施70第十五章 工程交付、回访及保修服务7215.1工程交付7215.2竣工后的服务及保修72附件一:项目经理部组织机构图74附件二:劳动力计划表75附件三:投入的主要施工机械设备表76附件五:施工进度横道图77附件六:施工总平面图78 第一章:编制说明1.1编制依据1.1.1招标人提供的永定门东街西里2#楼平改坡工程装修施工图纸及有关本次招标文件的答

36、疑文件等。1.1.2本公司有关项目施工管理的规章制度、法规及企业标准。1.1.3北京市人民政府有关建筑工程管理规范及验收标准。1.1.4国家和行业现行建筑施工的各类规程、规范及验收标准。本公司对本工程的设计和施工全部以现行的国家有关法规的要求为标准执行。(详见插表)1.1.5确保业主对工程质量、工期的要求。1.1.6现场实际勘察情况。插表1-1:适用于本工程主要标准、规范一览表序号标 准 及 规 范 名 称编 号1工程测量规范GBJ50026-932钢结构工程施工质量验收规范GB50205-20013屋面工程质量验收规范GB50207-20024混凝土结构工程施工质量验收规范GB50204-2

37、0025建筑装饰装修工程质量验收规范GB50210-20016建筑防腐蚀工程施工及验收规范GB50212-917建筑工程施工质量验收统一标准GB50300-20018建筑钢结构焊接技术规程JGJ81-20029建筑机械使用安全技术规程JGJ33-200110施工现场临时用电安全技术规程JGJ46-200511钢结构高强度螺栓连接设计、施工及验收规程JGJ82-9112建筑防腐蚀工程质量检验评定标准GB50224-9513回弹法检测混凝土抗压强度技术规程JGJ/T23-200114混凝土质量控制标准GB50164-9215混凝土强度检验评定标准GBJ107-8716建筑施工安全检查标准JGJ59

38、-9917建设工程施工现场供用电安全规范GB50194-9318建筑施工高处作业安全技术规程JGJ80-911.2编制目的本施工组织设计是经过现场踏勘后,对永定门东街西里2#楼平改坡工程(以下简称本工程)在工程实现目标、现场组织机构、施工部署及施工准备、劳动力与主要设备材料、施工进度总进度计划及保障措施、平面布置与平面管理、施工配合协调工作、主要分项工程施工方案和技术措施、确保工程质量的技术组织措施、确保安全生产及消防的技术组织措施、确保文明施工的技术组织措施、确保环保施工的技术组织措施、技术资料管理、工程交付、服务及保修等方面作出详细而周全的组织设计,制定切实可行的施工方案和保证措施,使本工

39、程在施工的全过程中,各个环节始终处于受控状态,追求过程精品,确保分部、分项工程一次验收合格率100%,达到国家相关工程质量验收标准。第二章 工程概况2.1工程概述工程名称:永定门东街西里2#楼平改坡工程建设地点:崇文区招标人:北京市崇文区房屋土地经营管理中心建设规模:1041.18(屋顶面积),地上五层,建筑高度15.80m,东西长度96.20m.结构形式:壁板结构2.2施工范围及内容本工程本次招标范围为本工程招标图纸范围内的修缮工程,改建工程,重新装修工程,主要包括:屋面工程,内外装修工程、防雷及接地工程。 2.2.1 屋面工程:包括屋面加固,钢屋架、钢梁檩与结构连接,防火涂料、烟道、钢筋混

40、凝土圈梁、屋面防水、雨水管、老虎窗、合成树脂瓦工程。2.2.2 内装修工程:包括公共部分楼梯间内墙面、顶面(含楼梯踏步板底面)、门窗处理及墙、顶刷乳胶漆、门窗油漆。2.2.3 外装修工程:包括全部外墙涂料。2.2.4、屋顶避雷装置工程: 避雷带引下线及接地装置的连接与焊接。2.3工程主要特点及措施:本工程施工难点为居民区旧楼改造,车辆、行人流量大,施工工作面小。5#楼东侧为商业门市,施工可用场地小。在施工的同时要保证居民的正常生活,保证小区车辆的正常通行 ,为此我公司制定以下措施:1、成立应急事故处理小组,由项目经理牵头,对现场出现的事故做到反映快,处理及时,方法得当。2、公布工地的联系电话及

41、电子信箱,虚心接受居民的建议,将问题解决在在基层。不将矛盾推向业主,通过自己的行动得到广大居民的支持。3、由于工程的特殊性,在开工前施工中及时和街道办事处,特别是居委会取得良好的配合。在现场安排专人负责协调,在施工中,特别是夜间施工,占用道路浇注砼,吊装钢屋架等关键施工环节,做到先通知及时沟通,对于居民提出的合理要求及时处理,保证施工连续性。4、在上下班高峰期,由安全员疏导现场车辆及行人交通,将施工对居民的影响降到最低,在进行外墙粉刷时,除了对住户门窗的安全防护外,提前做好通知工作,保证居民生活的私密性。第三章 工程实现目标3.1质量目标严格按规范和设计图纸施工,分部、分项工程一次验收合格率1

42、00%,质量评定等级达到“合格”标准。 3.2工期目标本工程计划开工日期:2007年04月1日,计划竣工日期2007年05月31日,总工期为61日历天。确保在招标文件要求的工期内完成招标范围内全部工作内容。3.3安全目标加强安全教育,完善安全措施,确保无重大安全事故,轻伤频率控制在0.2%内。3.4环境保护和文明施工目标公司将严格按照北京市关于建筑工程施工的各项管理规定执行,加强施工组织和现场安全文明施工管理,达到北京市安全文明工地的标准。3.5服务目标在工程竣工时与业主签订工程保修合同,工程交工的同时,向业主提交用户使用手册。工程交付使用后,定期对工程进行回访,预防并及时采取措施解决有可能出现的质量问题,确保工程使用安全、设备和系统运转