资源描述

《《二车间公路及_挡墙施工组织设计方案.doc5》.doc》由会员分享,可在线阅读,更多相关《《二车间公路及_挡墙施工组织设计方案.doc5》.doc(42页珍藏版)》请在三一文库上搜索。

1、四川安宁铁钛股份有限公司二车间环厂公路及挡墙施工组织设计2013年6月Opinions and suggestions on the partys mass line educational practiceAccording to the central and provincial, municipal unified deployment, according to municipal Party committee about carrying out the partys mass line educational practice activity in the citys imp

2、lementation opinions, the spirit of the partys mass line educational practice activities from 20* in January to 99 months, carried out at all levels of departments and directly affiliated institutions and grass-roots party organizations. According to my actual County, the county to carry out the edu

3、cation practice put forward the following implementation opinions.First, the overall requirementsCounty county education practice to the eighteen Party of eight, the spirit of the the third Plenary Session of the 18th CPC Central Committee as the guidance, conscientiously implement the spirit of gen

4、eral secretary Xi Jinping book series of important speech, earnestly implement the Central Committee really, opinions and advice , party implementing the guiding ideology of opinions to determine the objectives and requirements, step method, in accordance with the look in the mirror, dress up, wash

5、bath, cure treatment, the general requirements of for the people pragmatic honest people as the theme, in carrying forward the spirit of Zhuanglang Zhuang, improve their work style, service to the masses of the people, the foundation of consolidating grassroots, promote transformation across efforts

6、, to further implement the central eight regulations and The opposition party and government austerity waste regulations , double section provincial regulations, municipal provisions of the twelve plan and the implementation measures for on improving the work style of close ties with the masses law,

7、 highlight style building, carry out the whole wind spirit, resolutely oppose formalism, bureaucracy, hedonism and wasteful extravagance to solve the problems, Party members and cadres of the style and the masses of people strong, the Ministry of Party members and cadres to further improve their thi

8、nking and understanding, to further change the style of the wind, the masses to close, honest and pragmatic people honest image to further establish the foundation to further reinforce the basic level. Style of the building of the new results to promote the construction of a powerful force of the co

9、unty and the ecological culture of the county and county construction.In educational practice activities of the unit is mainly: the county and below county departments under the organs, enterprises and institutions directly under the township, street, and community, village, non-public economic orga

10、nizations, social organizations and other grass-roots organizations. Agencies and branches, each single unit, follow the rules on internal institutions. Educational practice with step by step.To adhere to the county leadership, leadership and leading cadres to focus on outstanding catch to directly

11、contact the service of the masses of law supervision departments and window units, service industry, educational practice, pay attention to grasp the heavy towns, streets and villages, community education activities and the masses of grassroots groups in close contact to strengthen, and the majority

12、 of Party members, cadres and the mass line line Marx doctrine view of the masses and the partys education.Always speak seriously as a basic attitude, adhere to positive education, to carry out criticism and self criticism group, adhere to the pragmatic, more emphasis on leadership, pay more attenti

13、on to the layers of the demonstration, more focus on the four winds, solve the problem, pay more attention to open the door, the participation of the masses, pay more attention to the classification guidance. Orderly, pay more attention to the cooperation and cohesion driven, more strict requirement

14、s on injection, really supervision practice, ensure education practice is not empty is not empty is not partial, not as a mere formality.Two, the key point of the taskThe main task of the countys education practice is to seize against four wind this focus on centralized solve outstanding problems as

15、ked County, township leadership and leading cadres of the four winds, the disadvantages of the style, scale behavior to a large scale investigation, overhaul, cleaning greatly. At the same time, respond to the concerns of the masses, safeguard the interests of the masses, pay attention to solve prac

16、tical problems, solve the people around the unwholesome tendencies especially on eat, take the card, Yong lazy luxury, extravagance and waste fees, privileges and other issues, timely and effective, without any discount to solve, to improve the style of real implementation of the requirements of rea

17、l to the grassroots, real let group Benefit the public.(a) focus on solving the four winds outstanding issuesThe central and provincial requirements, the county leadership and leading cadres of key performance concept is not correct, do not dare to play, to engage in image project, political project

18、, a leadership guide, a set of ideas, orders and prohibitions, and a policy, there are countermeasures county. The units directly under the heavy focus on solving Yung lazy drag, buck passing skin, work is not implemented, the service is not active. The dynamic problem of law enforcement and supervi

19、sion departments and window units, service industry mainly solve the door hard, ugly face, something difficult, and arbitrary charges, fines, levies, and breach of privilege, chinakayao, not the problem of law. The township, street The collar of leading bodies and leading cadres to solve key does no

20、ttheir own conditions to develop the correct road, the maximum to avoid investment risk, gain profit.(three) vigorously promote the brand. To establish brand awareness, awareness of the use of brand, brand value, brand acquisition performance, enhance the competitive strength. Concentrated manpower,

21、 careful planning, packaging and publicity of a number of unique, market influence and coverage of the brand, the implementation of key breakthroughs, to enhance the competitive strength, walking business road the competition of alienation and characteristics, the pursuit of stability and developmen

22、t of the market.(four) to promote the integration of resources. To further broaden their horizons, effective integration of resources within the group, the city resources, other industries and regional resources, mutual trust, mutual benefit, seeking win-win principle, in the framework of national p

23、olicies and regulations, strict inspection and argumentation, legal consultation, examination and approval procedures, strict regulation of economic activities, attract injection the social investment to the industry group, to achieve leveraging the development, ensure that the value of state-owned

24、assets.(five) to strengthen the construction management personnel. Strengthen the management of education and training of cadres and workers of the existing business, firmly establish the concept of the market, enhance the sense of crisis to adapt to market competition, the sense of urgency, improve

25、 the ability to respond to market competition, improve management and operation of the market. At the same time, according to the need of industrial development, vigorously the introduction of high-quality management management personnel, and strive to build a high-quality professional management te

26、am, hard work, and promote the entire workforce knowledge structure, age structure, structure optimization and upgrading ability, enhance core competitiveness, adapt to the need of market competition.(six) seriously study the policy for policy. Serious research about social support the development o

27、f cultural undertakings in the country and the XX policy, especially the policy of industrial development, financial investment policy, financial policy and tax policy, and actively seek policy, projects and funds, enterprise and industry group mission to promote leapfrog development.一、 编制依据及原则(一)编制

28、依据1、乡村公路水泥砼路面工程施工图设计文件(第一册)2、现行城市道路设计规范,公路工程施工技术规程及相应的质量检验评标准。3、本单位拥有的科技成果、管理水平、技术设备力量,多年积累的公路施工经验用施工现场及周围环境的调查所掌握有关资料。(二)编制原则1、 单位工程合格率100%。2、 遵循招标文件各项条款要求,严格按照设计标准,现行施工规范和质量检验评定标准,正确组织施工,确保工程质量合格。3、 根据工期要求,抓住关键线路,合理安排施工进度,搞好工序衔接,达到均衡生产,在保证工程质量、安全的前提下,尽量缩短工期。4、 坚持实事求是的原则,在制定施工方案中,充分发挥我队专业化、机械化的施工优势

29、,借鉴以往类似工程施工经验,坚持科学管理、精心施工,确保高速度、高质量、高效益地完成本合同段的建设。5、 科学合理配置资源,做到机械化作业、流水作业和标准化作业,合理配备劳动力资源,加强内部管理,降低工程成本,提高经济效益。6、 在满足业主各种要求的前提下,确保实现进度、质量、安全的预期目标。二、工程概况(一)工程承包范围:本项目承包范围为公路道路工程,包括临时电力线路、水泥稳定碎石基层、水泥混凝土面层以及边沟、防护栏、标志、标线。(二)工程简介: 本合同项目为四川安宁铁钛股份有限公司二车间道路、挡墙、排水沟工程,工程地点位于米易垭口。工程范围:二车间厂区内道路及水沟;工程细目以招标文件工程量

30、清单及本项目施工图设计文件为准。本工程的设计指标为:公路路线等级采用部颁四级公路标准,单车道路面宽5m,双车道路面宽6.5m,改造为水泥混凝土路面。(三)工程规模:1、设计规模:工程路线全长7.92公里,路面宽5米。2、主要工程数量:路面工程:5%水泥稳定碎石基层12000 ,水泥砼面层12000。边沟:3013m3浆砌毛石:1000m3,护坡毛石2000m3排水沟:3300米土方开挖:9000方(四)场地工程地质、水文条件:本合同段工程位于乡村公路段,为原二车间土路面。(五)气候条件本合同段施工地区属亚热带季风气候,温暖潮湿,9月高温气候,冬季降雨量不大,阴雨绵绵。(六)设计标准1、道路等级

31、:公路路线等级采用部颁四级公路标准2、计算行车速度:V=20km/h3、路面交叉:平面交叉4、路面类型:混凝土水泥路面三、施工管理力量及劳动力安排(一)项目管理机构根据合同任务和工期要求,立即组织成立施工现场管理机构,全面组织,实施本合同段工程的管理。施工组织机构框图见后。(二)施工区段划分及人员配备1、施工区段划分 根据本合同段任务分布状况和工期要求,我公司安排为二个施工段:干选处为第一施工段,其余为第二施工段。2、劳动力组织和人员配备 根据本合同段分项工程施工强度和施工方法,通过计算分析汇总平衡,工种分为技术工和一般普工两种:技术工程主要有施工机械、运输车辆司机、钢筋工、木工、电工、水泥工

32、、电焊工,依据施工进度计划及工程数量,投入本工程施工的劳动力,路面工程以机械施工为主,主要为机械工、运输工、泥水工、电工、模板工、钢筋工、普工。(人员数量安排详见下表)劳动力数量表种类数量机械工10钢筋工1木工、模板工20电工1石工20泥水工5普工35四、施工机械设备配置根据本合同段工程项目和主要工程数量,主要施工设备大体可为以下几类:(1) 路面工程施工机械;(2)安全设施施工机械。五、施工组织方案一、施工准备为确保优质高效完成本合同段的各项工程,自进场的第一天起,我部将统筹安排,科学调度,全面展开开工前的各项准备工作。1、行政准备为了能使各项工程的施工顺利进行,进场后,积极同业主及土建施工

33、队伍等相关部门取得联系,主动征求各部门的意见和建议,在业主的帮助下,取得各方面的更多支持,使得本合同段各项工程的施工能够在一个和谐、友好的氛围中顺利展开。2、技术准备(1)测量准备开工前的定线复测是各项工程开工的前提,它对工程质量有着直接的影响,为确保复测精度,由对测量有着丰富经验的专职测量工程师负责,在现场交接主要控制桩点和获得相关的测量资料后,迅速组织对合同段进行定线测量,主动处理好同相邻标段的衔接。视各项工程的实际情况,增设复测成果的护桩图,并书面上报监理和业主审核,并对前期开工的分项工程及路线边桩测量放样,为各分项工程的开工打下良好基础。(2)技术资料准备在项目总工的主持下,召集全体技

34、术人员认真仔细地阅读、审核图纸,深入细致地领会设计意图,争取设计、监理单位对工程项目作更深一层的技术交底,编制分项工程的作业指导书;全面分析,统筹安排,科学分解工序,合理确定作业循环时间,制定严格的技术交底、技术管理和质检制度,准备好工程日志等各种记录簿和工程检查表格。(3)现场准备在现有的“三通一平”前提下,修建临时设施的同时,安排人员、机械进行本合同段内临时道路修筑,地表清理,为正式开工做好准备。(4)物资准备物资部门在项目经理统一安排下,根据工程的轻重缓急,在业主等有关部门的监督下对急需物资进行采购。在试验监理工程师认可后,部分物资可分期、分批进场,以满足工程需要。(1) 机械准备 碾压

35、机械; 运输设备; 拌种设备; 常规试验设备; 其它机具。(具体详见机械设备表)拟投入的主要施工机械设备表序号设备名称型号规格数量国别或产地制造年份定额功率(kw)生产能力1压路机1洛阳建筑20T2铲车1山东豪沃3空压机1日本皇鼎4搅拌机JS7501山东5配料斗JS7501山东根据本标段的实际情况,各种机械按照计划准时进场。设备到位后,由机材部人员负责对所有设备进行全面检修调试。拟投入材料试验、测量、质检仪器设备序号仪器设备名称规格型号单位数量备注1水准仪江光DS3台12砼试模150150550套83三米直尺3米把14磅秤500KG台15集料方孔筛套16砂石标准筛套17五米塔尺5米把38灌砂桶

36、150mm200mm台29皮尺50m把3(二)、临时设施工程经认真阅读图纸和现场考察,综合分析本合同工程的分布、工期及交通环境条件后,从节约用地和方便施工的原则出发,对临时工程进行规划,具体如下:1、临时驻地:设在老地磅房对面铁路工区内。2、临时便道:利用现有的施工便道,现场与便道根据实际需要适时修筑。3、砼拌和站及预制场布置拌和站设2台,分别设在三云路K0+000和丹三路K0+000处位置。4、施工用水及供电施工现场按照建设单位提供的三通一平,我方只需在施工现场架设临时输电输水线路并搭建备用发电机房即可保证施工用电用水的需要。(三)施工总体进度计划1、总体计划安排的原则本合同的施工总体计划,

37、以招标文件和本承包人计划投入的资源(劳动力、机械设备、材料)为依据,以合同工期为前提,科学安排,保证重点、统筹兼顾,在确保工程质量、施工安全的大前提下,优化资源配置,挖掘人员和设备潜力,充分发挥本队综合优势,确保在合同工期内完成施工任务。在工程施工中,以组织均衡施工为基本方法,抓住少雨季节,采用平行、流水、交叉等作业方法超前动作。 2、材料进场计划 严格地控制原材料,成品、半成品的型号,规格质量、及材料进场的批量计划数。材料进场后按规范要求见证随机取样送建材检测中心检验,合格后方可使用,对于检验达不到设计及规范要求的,原材料退货处理。做好各种材料的质量记录和有资料的整理,和保存工作,使各种材料

38、的质量证明书、合格证、验收证明、试验报告等资料齐全,确保资料的完整性和可追溯性。(1) 、工程材料的品种、规格较多;材料数量大,受资金、场地因素的影响,须分批次进场;各种规格、不同批次的材料、合格和待检的材料都堆放在料场,施工过程中是各种材料不断进入、又不断流出的过程。(2) 、加强对施工单位材料堆放地的管理,材料的堆放应按材料的品种、规格和日期批次分别堆放,不同规格的材料应隔断,不许混杂。(3) 、施工单位一般按材料进场计划组织材料进场,材料进场情况要进入当日的监理日记,材料进场预报制度是及时掌握材料进场情况的重要措施。(4) 、材料进场没有固定的计划周期,要根据现场具体的施工情况,所消耗的

39、材料,来进行对材料进场的安排。 3、总工期本合同计划总工期为120天,计划开工日期暂定为2013年5月10日,完工日期为2013年9月10日。4、施工进度计划1)、施工准备:2013年5月12013年5月9日2)、水泥稳定层工程:2013年6月10日2013年7月5日3)、路面面层工程:2013年7月5日2013年9月10日(四)、主要工程项目施工方案及施工工艺1、5%水泥稳定碎石基层1) 水泥稳定层的下承层即片石垫层表面应平整、坚实,没有任何松散的材料和软弱地基,如发现低洼和坑洞,应仔细填补及压实,搓板和辙槽应及时刮除。2) 施工放样:在下承层上恢复中线,直线段每20米一桩,平曲线段每10米

40、设一桩并在两侧路基边缘外设指示桩。进行水平测量,并在指示桩上用明显标记标出水泥稳定层的设计高程。3) 拌和:采用拌和机拌和成混合料,用运输车辆运送至施工现场,应根据设计的配合比进料,并将拌和料搅拌均匀。4) 摊铺:摊铺前尘土杂物要清除,并在片石垫层上均匀喷洒一遍清水,以利于上下层结合。松铺系数1.3-1.35,必要时进行减料或补料工作,纵横断面符合要求,厚度均匀一致。5) 碾压:混合料摊铺整平后,先用压路机进行静压4遍,再进行振动碾压2遍,最后再静压1遍。碾压时重叠1/2轮宽,后轮必须超两段的接缝处,碾压到要求的密实度,同时没有明显的轮迹。严禁压路机在已完成的或在碾压的路段上调头或急刹车,保证

41、稳定层表面不受破坏。碾压进程中稳定层表面应始终保持潮湿,如表面水蒸气较快,应及时补洒少量的水,不得洒大水碾压。如有弹簧、松散、起皮等现象,应及时翻开重新适量水泥拌和或用其它方法处理,使其达到质量要求。碾压结束之前,应进行终平工作,将高出设计标高部分刮除扫出路外,局部低洼处留待铺筑路面时处理。6) 养生:在对稳定层进行厚度、宽度、平整度、高程及压实度检测合格后进行养生,采用每天人工经常洒水进行养生,始终保持稳定层表面潮湿,养生期不宜少于7天。养生期内应封闭交通,以免稳定层受损。2、混泥土路面面层(1)、施工工序准备基层 施工放样 立模 砼的拌和 砼运输 摊铺 振捣、整平 真空吸水 磨光 压纹 切

42、缝 养生 拆模。(2)、施工内容及重点1)、材料和选择A、 水泥选用强度高,收缩性小,而磨性强,抗冻性好,标号大于32#的普通硅酸盐水泥。注意事项:水泥的物理性能和化学成分应符合国家有关标准的规定。不同标号、厂牌、品种、出厂日期的水泥,不得混合堆放,严禁混合使用。B、 砂选择质地坚硬、耐磨、洁净,符合规定级配要求,细度模数宜在2.5以上。C、 碎石选择质地坚硬、耐磨、洁净,符合规定级配要求,且最大粒径不得超过40mm。D、 水、电由业主提供使用,宜在拌和场设蓄水池,以防水量不足时备用。2) 立模: 、模板的选用A、 砼路面模板采用22cm钢模板,小弯道等非标准部位采用木模板,其厚度为5cm(曲

43、线处可减薄到3cm)。B、 模板应无缺损,有足够的钢度,内侧和顶,底面均光洁、平整、顺直,局部变形不得大于3mm。振捣时模板横向最大挠曲应小于4mm,高度应与砼路面板厚度一致,误差不超过2mm。纵缝模板平缝的拉杆穿孔眼位应准确。C、 模板周围使用前,应对前次拆下的模板进行检验,如有变形损坏,应整修至达到要求后才能使用。 立模施工要点:A、 立模前应检测基层的顶面标高和路拱横坡以及基层表层有否磨损破坏等,否则应整修基层至符合要求才可立模铺筑砼。B、 立模的平面位置和高程要符合设计要求,基误差应小于砼路面质量验收的容许误差。C、 立模时应使钢模向外侧微倾,使钢模内边角支撑震动梁与滚筒,保证摊铺时路

44、面的平整度。D、 模板应支立稳固,接头严密平顺。模板的接头以及与基层接触采用砂浆封堵或用塑料薄膜铺在钢模边,采用塑料薄膜防漏措施时应控制薄膜与混凝土形成夹层。E、 浇筑砼前,在模板内侧涂脱模剂(隔离剂)。3) 砼的拌制和运输:A、 砼的拌和采用双握轴强制搅拌机搅拌,以保证砼的拌和质量。B、 投入搅拌机的每拌原材料数量,严格按施工配合比搅拌机容量确定,并称量准确。C、 搅拌机装料顺序为砂、水泥、石子,进料后边搅拌边加水。D、 砼拌合物用自卸机动车运输至施工现场进行作业。4) 摊铺: 摊铺前的准备工作A、 摊铺前先检查模板位置、高程、相邻模板接头处的高差、模板是否支设稳固,基层是否平整、润湿,模板

45、内侧面是否涂脱模剂,水泥砼板壁是否涂沥青,以及钢筋的安设和传力杆、拉杆等设置情况,合格后方可摊铺砼。B、 检查、维修砼运输通道以及设置安全护栏、并派专职交通指挥人员指挥交通。 摊铺施工要点:A、 模板边及施工缝处混凝土铺筑应用铁锹(扣锹法)摊铺,禁止抛掷和耧耙。B、 每工作班砼的摊铺、振捣、整平、做面应连续进行,不得中断。如因故中断,应设备施工缝缝,并宜设在设计规定的接缝位置。5) 振捣、整平的内容和要求:A、 摊铺好的砼拌和物,随即用插入式和平板式振动器均匀地振实。B、 插入式振动器功率宜采用1.5kw,其作用是振捣密实及起浆。C、 平板振动器采用2.2kw(采用真空吸水工艺时可用功率较小的

46、平板振动器)。D、 振捣时插入式振动器先在模板(或砼板壁)边缘、角隅处初振或全面积顺序初振一次,同一位置振动时不宜少于20s。插入式振动器移动间距不大于其作用半径的1.5倍,其至模板的距离不大于作用半径的0.5倍,并避免碰撞模板和钢筋。然后,再用平板振动器全面往返振捣2遍,板与板之间宜重迭10-20cm。同一位置的振捣时间,当水灰比小于0.45时不少于30s,当水灰比大于0.45时不少于15s,以不再冒出气泡并泛出水泥浆为准。E、 砼拌和物全面振捣后,再用振动梁进一步拖拉振实并初步整平。振动梁往返拖拉2-3遍,使表面泛浆,并赶出气泡。振动梁移动速度要缓慢均匀,不许中途停顿,前进速度以每分钟1.

47、2-1.5m为宜。凡有不平之处,应及时铺以人工挖填补平。补填时宜用较细的拌合物,但严禁用纯砂浆填补。F、 最后用无缝钢管滚杠进一步滚揉表面,使表面进一步提浆调匀调平。6) 真空吸水施工 基本特点:A、 真空吸水为非必要工序,但在特定优点,本工程水泥砼路面将采用真空吸水方法,以节约作业时间,提高工作效率。但在高温季节时白天施工不宜采用真空吸水作业,防止板面过干致使后续作业无法施工。B、 采用该工艺时,砼拌合物水灰比比常规增大5%-10%,可易于摊铺、振捣、减轻劳动强度,加快施工进度,并且还可缩短砼抹面工序的等待时间,降低成型砼的最终水灰比,从而增加了密实性,提高了强度,改善了抗缩性、抗渗性和抗冻性。 要求:A、 真空吸水深度不可超过30cm。B、 真空吸水时间宜为砼路面板厚的1.5倍(吸水时间以min)计,板厚以cm计。C、 吸垫铺设,特别是周边应紧贴密致。开泵吸水一般控制真空表1min内逐步升高到400-500mm11g,最高值不宜大于650-700mm11g。计量出水量至达到要求,并作记录。关泵亦逐渐减小真空度,并略

展开阅读全文