交通运输英语.ppt

上传人:本田雅阁 文档编号:3142207 上传时间:2019-07-16 格式:PPT 页数:25 大小:2.13MB
返回 下载 相关 举报
交通运输英语.ppt_第1页
第1页 / 共25页
交通运输英语.ppt_第2页
第2页 / 共25页
交通运输英语.ppt_第3页
第3页 / 共25页
交通运输英语.ppt_第4页
第4页 / 共25页
交通运输英语.ppt_第5页
第5页 / 共25页
点击查看更多>>
资源描述

《交通运输英语.ppt》由会员分享,可在线阅读,更多相关《交通运输英语.ppt(25页珍藏版)》请在三一文库上搜索。

1、,Highway Location,Outline,1、The definition and basic principle of Highway Location 2、The highway location process 3、Impacts of Highway Construction on the Environment and Economic 4、The methods of highway location 5、Conclusions,1、Definition: Its a process that within the scope of “roadband”(or calle

2、d alignment corridor)selected in the line selecting layout stage, according to the settled technical standards, combining the datailed topography, geology and other natural conditions and considering the reasonable arrangements of the flat, vertical and horizontal sides, the engineer set the exact l

3、ocation of the center line of road.,1、Principle: Roadway elements such as curvature and grade must blend with each other to produce a system that provides for the easy flow of traffic at the design capacity,while meeting design criteria and safety standards.,2、The highway location process,(1)Office

4、study of exsiting information (2)Reconnaissance survey (3)Preliminary locate survey (4)Final location survey,(1)The first phase of Highway Location(Office study of exsiting information),A、Definition B、The sources of the data C、The types of the data D、The preliminary analysis of the data,(2)Reconnais

5、sance survey,The object of this phase is to identy several feasible routes,each within a band of a limited width of a few hunderd feet. 插图,Feasible routes are inentified by a stereosopic examination of the aerial photographs.,Control points between the two endpoints are determined for each feasible

6、route.,(3)Preliminary location survey,Establishing all the control points; Determing preliminary vertical and horizontal alignments.,Preliminary alignments are used to evalute the economic and environmental feasibility of the alternative routes.,(4)Final Location Survey,A、Determining the horozontal

7、and vertical alignments. B、Locating the positions of structures and drainage channels.,Tools,A、Splines B、Curve templates,3、Impacts of Highway Construction on the Environment and Economic,A、Environment B、Economic,4、The methods of highway location,A、Paper location B、Site location C、Aerial survey location,5、Conclusions,

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1