06-30158810-DC.pdf

上传人:小小飞 文档编号:3726053 上传时间:2019-09-22 格式:PDF 页数:30 大小:644.83KB
返回 下载 相关 举报
06-30158810-DC.pdf_第1页
第1页 / 共30页
06-30158810-DC.pdf_第2页
第2页 / 共30页
06-30158810-DC.pdf_第3页
第3页 / 共30页
06-30158810-DC.pdf_第4页
第4页 / 共30页
06-30158810-DC.pdf_第5页
第5页 / 共30页
亲,该文档总共30页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《06-30158810-DC.pdf》由会员分享,可在线阅读,更多相关《06-30158810-DC.pdf(30页珍藏版)》请在三一文库上搜索。

1、a Date: 6 December 2006 Origin: European Latest date for receipt of comments: 31 March 2007 Project no.: 2006/03154 Responsible committee: GSE/38 Installation and equipment for LNG Interested committees: Title: Draft BS prEN 1474-2 Installation and equipment for liquefied natural gas - Design and te

2、sting of marine transfer systems - Part 2: Design and testing of transfer hoses Supersession information: If this document is published as a standard, the UK implementation of it will supersede NONE and partially supersede NONE . If you are aware of a current national standard which may be affected,

3、 please notify the secretary (contact details below). WARNING: THIS IS A DRAFT AND MUST NOT BE REGARDED OR USED AS A BRITISH STANDARD. THIS DRAFT IS NOT CURRENT BEYOND 31 March 2007. This draft is issued to allow comments from interested parties; all comments will be given consideration prior to pub

4、lication. No acknowledgement will normally be sent. See overleaf for information on commenting. No copying is allowed, in any form, without prior written permission from BSI except as permitted under the Copyright, Designs and Patent Act 1988 or for circulation within a nominating organization for b

5、riefing purposes. Electronic circulation is limited to dissemination by e-mail within such an organization by committee members. Further copies of this draft may be purchased from BSI Customer Services, Tel: +44(0) 20 8996 9001 or email ordersbsi-. British, International and foreign standards are al

6、so available from BSI Customer Services. British Standards on CD or Online are available from British Standards Publishing Sales Limited. Tel: 01344 404409 or email bsonlinetechindex.co.uk. Information on the co-operating organizations represented on the committees referenced above may be obtained f

7、rom the responsible committee secretary. Cross-references The British Standards which implement International or European publications referred to in this draft may be found via the British Standards Online Service on the BSI web site http:/www.bsi-. Direct tel: 020 8996 7009 Responsible Committee S

8、ecretary: Committee Service Centre (BSI) E-mail: cscbsi- Draft for Public Comment Head Office 389 Chiswick High Road London W4 4AL Telephone: +44(0)20 8996 9000 Fax: +44(0)20 8996 7001 Form 36 Version 6.1 DPC: 06/30158810 DC Licensed Copy: London South Bank University, London South Bank University,

9、Sat Dec 30 06:30:12 GMT+00:00 2006, Uncontrolled Copy, (c) BSI b Introduction This draft standard is based on European discussions in which the UK took an active part. Your comments on this draft are welcome and will assist in the preparation of the consequent British Standard. If no comments are re

10、ceived to the contrary, then the UK will approve this draft and implement it as a British Standard. Comment is particularly welcome on national, legislative or similar deviations that may be necessary. Even if this draft standard is not approved by the UK, if it receives the necessary support in Eur

11、ope, the UK will be obliged to publish the official English Language text unchanged as a British Standard and to withdraw any conflicting standard. UK Vote Please indicate whether you consider the UK should submit a negative (with reasons) or positive vote on this draft. Submission The guidance give

12、n below is intended to ensure that all comments receive efficient and appropriate attention by the responsible BSI committee. Annotated drafts are not acceptable and will be rejected. All comments must be submitted, preferably electronically, to the Responsible Committee Secretary at the address giv

13、en on the front cover. Comments should be compatible with Version 6.0 or Version 97 of Microsoft Word for Windows, if possible; otherwise comments in ASCII text format are acceptable. Any comments not submitted electronically should still adhere to these format requirements. All comments submitted s

14、hould be presented as given in the example below. Further information on submitting comments and how to obtain a blank electronic version of a comment form are available from the BSI web site at:http:/www.bsi- Template for comments and secretariat observations Date: xx/xx/200x Document: ISO/DIS xxxx

15、x 1 2 (3) 4 5 (6) (7) MB Clause No./ Subclause No./ Annex (e.g. 3.1) Paragraph/ Figure/Table/ Note (e.g. Table 1) Type of com- ment Comment (justification for change) by the MB Proposed change by the MB Secretariat observations on each comment submitted 3.1 Definition 1 ed Definition is ambiguous an

16、d needs clarifying. Amend to read . so that the mains connector to which no connection . 6.4 Paragraph 2 te The use of the UV photometer as an alternative cannot be supported as serious problems have been encountered in its use in the UK. Delete reference to UV photometer. Microsoft and MS-DOS are r

17、egistered trademarks, and Windows is a trademark of Microsoft Corporation. Licensed Copy: London South Bank University, London South Bank University, Sat Dec 30 06:30:12 GMT+00:00 2006, Uncontrolled Copy, (c) BSI EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM DRAFT prEN 1474-2 November 2006 ICS 7

18、5.200 English Version Installation and equipment for liquefied natural gas - Design and testing of marine transfer systems - Part 2: Design and testing of transfer hoses Installations et quipements de gaz naturel liqufi - Conception et essais des systmes de transfert marins - Partie 2: Conception et

19、 essais des tuyaux de transfert This draft European Standard is submitted to CEN members for enquiry. It has been drawn up by the Technical Committee CEN/TC 282. If this draft becomes a European Standard, CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the c

20、onditions for giving this European Standard the status of a national standard without any alteration. This draft European Standard was established by CEN in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member

21、 into its own language and notified to the Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuani

22、a, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom. Recipients of this draft are invited to submit, with their comments, notification of any relevant patent rights of which they are aware and to provide supporting d

23、ocumentation. Warning : This document is not a European Standard. It is distributed for review and comments. It is subject to change without notice and shall not be referred to as a European Standard. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUN

24、G Management Centre: rue de Stassart, 36 B-1050 Brussels 2006 CENAll rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. prEN 1474-2:2006: E Licensed Copy: London South Bank University, London South Bank University, Sat Dec 30 06:30:12 GMT+00:00

25、2006, Uncontrolled Copy, (c) BSI prEN 1474-2:2006 (E) 2 Contents Page Foreword3 1 Scope 4 2 Normative references4 3 Terms, definitions and abbreviations4 4 Description of typical LNG transfer hose designs and accessories4 5 Design features of the LNG transfer hoses and transfer hoses assemblies.9 6

26、Inspection and tests14 7 Quality Assurance and Control18 8 Documentation.19 Annex A (informative) Purchasing Guidelines table20 Annex B (normative) Type approval and routine tests for LNG hoses and hoses assemblies.26 Bibliography28 Licensed Copy: London South Bank University, London South Bank Univ

27、ersity, Sat Dec 30 06:30:12 GMT+00:00 2006, Uncontrolled Copy, (c) BSI prEN 1474-2:2006 (E) 3 Foreword This document (prEN 1474-2:2006) has been prepared by Technical Committee CEN/TC 282 “Installation and equipment for LNG”, the secretariat of which is held by AFNOR. This document is currently subm

28、itted to the CEN Enquiry. Licensed Copy: London South Bank University, London South Bank University, Sat Dec 30 06:30:12 GMT+00:00 2006, Uncontrolled Copy, (c) BSI prEN 1474-2:2006 (E) 4 1 Scope This part of EN 1474 gives general guidelines for the design, material selection, qualification, certific

29、ation, and testing details for Liquefied Natural Gas (LNG) transfer hose for offshore transfer or on coastal weather- exposed facilities. To avoid unnecessary repetition, cross-reference to EN 1474-1 Design and Testing of Transfer Arms, is made for all compatible items, and for References, Definitio

30、ns and Abbreviations. Where additional References, Definitions and Abbreviations are required specifically for LNG hoses, they are listed in this part. For details of specific LNG transfer system architectures reference should be made to EN 1474-3. Hoses used for LNG transfer are normally large bore

31、: typically from DN 250 (10”) to above DN 400 (16”) and more, with working design pressures in the range of 10 bar to 20 bar in order to meet the minimum flow rate from the facility of 10 000 m3/hour with a practical number of hoses used for LNG transfer and vapour return. Transfer hoses have to be

32、durable when operating in the marine environment and to be flexible with a minimum bending radius compatible with handling and the operating requirements of the transfer system. 2 Normative references The following referenced documents are indispensable for the application of this document. For date

33、d references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 1474-1, Installation and Equipment for Liquefied Natural Gas Design and Testing of Marine Transfer Systems Part I: Design and Testing of Transfer

34、 Arms. EN 1474-3, Installation and Equipment for Liquefied Natural Gas Design and Testing of Marine Transfer Systems Part III: Offshore Transfer Systems. 3 Terms, definitions and abbreviations For the purposes of this document, the terms and definitions given in EN ISO 7369:2004 “Pipework Metal hose

35、s and hose assemblies Vocabulary“ and EN ISO 8330:2002 “Rubber and plastic hoses and hose assemblies Vocabulary“ apply. For the purpose of this document hose assembly means the hose complete with end fittings, hose handling and lifting devices (pad eyes, collars, ), as described in clause 4.1.1. 4 D

36、escription of typical LNG transfer hose designs and accessories 4.1 A LNG transfer hose system shall consist of the following 4.1.1 A flexible hose assembly, comprising an inner leak-proof barrier to provide primary flow path and containment; reinforcement layers to provide structural support; an ex

37、terior leak-proof barrier to provide an external protection (note: this depends on the hose design, see clause 4.2); the associated end terminations and connectors; Licensed Copy: London South Bank University, London South Bank University, Sat Dec 30 06:30:12 GMT+00:00 2006, Uncontrolled Copy, (c) B

38、SI prEN 1474-2:2006 (E) 5 identification collars, and if required: a leak detection system; an insulation system (to minimize build up of external ice); intermediate leak barrier(s); bending stiffeners or restrictors; hose handling device(s) (padeye or lifting lugs, lifting collar, ); buoyancy. NOTE

39、 The leak proof barrier of a composite hose is comprised of many individual layers forming a labyrinth seal. 4.1.2 Connection System to LNGC The hose extremity connector flanges shall permit the mounting of a QCDC or a spool piece or permit direct connection to LNGC or LNG terminal or another hose a

40、ssembly. (A description of QCDC is given in EN 1474-1 clause 6). Hubs, or other connectors if equivalent or superior to flanges, may be used if agreed between Purchaser and Vendor. 4.1.3 Emergency Release System The hose extremity connector shall permit the mounting of an Emergency Release System wi

41、th Valves and ERC (Emergency Release Coupler). (A description of Emergency Release System is given in EN 1474-1 clause 5 and EN 1474-3 clause 7). 4.1.4 Handling The hose shall include necessary fittings for safe handling, coupling those based on a construction in which polymeric films and fabrics ar

42、e entrapped between a pair of close wound helical wires, hereafter called Composite Hose; as the technology develops, other types of hose may become available and are also to be considered covered by this standard. 4.2.1 Corrugated metal hoses Inner layer The inner layer is made of stainless steel c

43、orrugations (sometimes called bellows). This ensures the inner leak- proofness of the structure, as well as sustaining the inner radial pressure. Armour layers (if required) These armours sustain the axial loading whilst providing an initial thermal insulation. Spiral layer (if required) This layer

44、ensures that the armours remain in place, as well as providing some thermal insulation. Thermal insulation layers This layer (or series of layers) ensures that the inner temperature is conserved whilst preventing any build-up of ice on the exterior of the hose. Intermediate and outer leak-proof laye

45、rs The intermediate sheath gives the hose a double annulus, thus permitting the detection of any leak of LNG as soon as it may occur. The external sheath prevents any ingress of water from the exterior. Licensed Copy: London South Bank University, London South Bank University, Sat Dec 30 06:30:12 GM

46、T+00:00 2006, Uncontrolled Copy, (c) BSI prEN 1474-2:2006 (E) 7 Key 1 Leakproof Layer 2 Insulation 3 Leakproof Layer 4 Insulation 5 Frette 6 Armours 7 Leakproof Layer 8 Inner Corrugated Bellows Figure 1 Typical hose reinforced corrugated metal hose family Depending on the design, the outer leak proo

47、f layer can be a corrugated stainless steel hose similar to the inner hose. In this case the annular gap between inner and outer hose may be evacuated. The pressure supervision of this annular gap results in a leak detection of inner and outer hose. The thermal insulation is maintained by layers of

48、super insulation inside the evacuated annular gap. Licensed Copy: London South Bank University, London South Bank University, Sat Dec 30 06:30:12 GMT+00:00 2006, Uncontrolled Copy, (c) BSI prEN 1474-2:2006 (E) 8 Key 1 Pumping port 2 Armouring 3 Corrugated outerpipe 4 Corrugated innerpipe 5 Super ins

49、ulation vacuum 6 Vacuum supervision Leal detection Figure 2 Sketch of a LNG flexible hose with vacuum installation option The metal hose construction shall ensure that all materials are used within their individual range of temperature. End fitting assembly: The end fitting assembly is made of stainless steel, and ensures 2 primary functions. The flexible termination, which incorporates the diff

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1