BS-EN-12952-5-2001.pdf

上传人:哈尼dd 文档编号:3737744 上传时间:2019-09-22 格式:PDF 页数:84 大小:913.07KB
返回 下载 相关 举报
BS-EN-12952-5-2001.pdf_第1页
第1页 / 共84页
BS-EN-12952-5-2001.pdf_第2页
第2页 / 共84页
BS-EN-12952-5-2001.pdf_第3页
第3页 / 共84页
BS-EN-12952-5-2001.pdf_第4页
第4页 / 共84页
BS-EN-12952-5-2001.pdf_第5页
第5页 / 共84页
亲,该文档总共84页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《BS-EN-12952-5-2001.pdf》由会员分享,可在线阅读,更多相关《BS-EN-12952-5-2001.pdf(84页珍藏版)》请在三一文库上搜索。

1、BRITISH STANDARD BS EN 12952-5:2001 Water-tube boilers and auxiliary installations Part 5: Workmanship and construction of pressure parts of the boiler The European Standard EN 12952-5:2001 has the status of a British Standard ICS 27.040 NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYR

2、IGHT LAW BS EN 12952-5:2001 This British Standard, having been prepared under the direction of the Engineering Sector Policy and Strategy Committee, was published under the authority of the Standards Policy and Strategy Committee on 24 May 2002 BSI 24 May 2002 ISBN 0 580 37311 8 National foreword Th

3、is British Standard is the official English language version of EN 12952-2:2001. It partially supersedes BS 1113:1999 which will be withdrawn when Parts 1, 2, 3, 5, 6, 7, 10, and 11 of BS EN 12952 are published. The UK participation in its preparation was entrusted to Technical Committee PVE/2, Wate

4、r-tube boilers, which has the responsibility to: A list of organizations represented on this committee can be obtained on request to its secretary. Additional information The United kingdom voted against the acceptance of this European Standard at the Formula Vote stage. The principal UK objections

5、were as follows: a) There is no reference in the EN foreword to CR 12952-17, Water-tube boilers and auxiliary installations Part 17: Guidelines for the involvement of an inspection body independent of the manufacturer. b) CEN/TC 269 passed a resolution that Parts 1, 2, 3, 5, 6 and 7 be published as

6、a package necessary for the design, construction and safety of water-tube boilers but no mention of this is given in the EN foreword. c) 6.3.5 gives a requirement that pressure parts of a boiler shall be marked with the manufacturers brandmark and property class symbol, or the steel grade code numbe

7、r in accordance with EN ISO 4759-1. However, EN ISO 4759-1 only refers to tolerances for fasteners and there is no mention of marking. d) Figure 9.4 shows various typical features relating to tube expansion but incorrectly labels item 6 in the key as a radial hole. e) 10.4.2 describes a method of po

8、st-weld heat treatment. The second paragraphs gives a requirement that where the attaching butt weld is at a distance less then from the branch/stub to the shell weld, the heat treatment shall be applied simultaneously to the butt weld. This requirement is incorrectly illustrated on the left-hand si

9、de of Figure 10.4-3 as ? f) Figure B.1 shows examples of tube or nozzle to header connections, however, Figure B.1d) is incorrectly drawn. On the right hand side of Figure B.1d) the central weld prep ? is incorrectly shown to be on the inside of the tube, when in fact it is the outside of the tube t

10、hat has been machined down. Cross-references The British Standards which implement international or European publications referred to in this document may be found in the BSI Catalogue under the section entitled “International Standards Correspondence Index”, or by using the “Search” facility of the

11、 BSI Electronic Catalogue or of British Standards Online. This publication does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from lega

12、l obligations. aid enquirers to understand the text; present to the responsible international/European committee any enquiries on the interpretation, or proposals for change, and keep the UK interests informed; monitor related international and European developments and promulgate them in the UK. 5r

13、ibeb? 5ribeb? Summary of pages This document comprises a front cover, an inside front cover, the EN title page, pages 2 to 80, an inside back cover and a back cover. The BSI copyright date displayed in this document indicates when the document was last issued. Amendments issued since publication Amd

14、. No. DateComments EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 12952-5 December 2001 ICS 27.040 English version Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler Chaudires tubes deau et installations auxiliaires - Partie 5:

15、 Fabrication et construction des parties sous pression des chaudires Wasserrohrkessel und Anlagenkomponenten - Teil 5: Verarbeitung und Bauausfhrung fr drucktragende Kesselteile This European Standard was approved by CEN on 8 September 2000. CEN members are bound to comply with the CEN/CENELEC Inter

16、nal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Management Centre or to any CEN member.

17、This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the Management Centre has the same status as the official versions. CEN members are t

18、he national standards bodies of Austria, Belgium, Czech Republic, Denmark, Finland, France, Germany, Greece, Iceland, Ireland, Italy, Luxembourg, Netherlands, Norway, Portugal, Spain, Sweden, Switzerland and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPI

19、SCHES KOMITEE FR NORMUNG Management Centre: rue de Stassart, 36 B-1050 Brussels 2001 CENAll rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 12952-5:2001 E EN 12952-5:2001 (E) Contents PagePage Foreword . . . . . . . . . . . . . . . . . . .

20、 . . . . . . . .3 1Scope . . . . . . . . . . . . . . . . . . . . . . . . .4 2Normative references . . . . . . . . . . . . .4 3Definitions . . . . . . . . . . . . . . . . . . . . .5 4Symbols and abbreviations . . . . . . . .6 5General . . . . . . . . . . . . . . . . . . . . . . . .6 6Pressure parts .

21、 . . . . . . . . . . . . . . . . .6 6.1Drums, headers and similar pressure parts . . . . . . . . . . . . . . . . . . . . . . . . . .6 6.2Material identification . . . . . . . . . . . . . .6 6.3Material marking . . . . . . . . . . . . . . . . . .7 6.4Marking during manufacture . . . . . . . . .7 7Cut

22、ting, forming and fabrication tolerances . . . . . . . . . . . . . . . . . . . . . .8 7.1Cutting of material . . . . . . . . . . . . . . . .8 7.2Forming of drums, headers and ends . . .8 7.3Forming of tube bends . . . . . . . . . . . . .9 7.4Drum and header fabrication tolerances . . . . . . . . . .

23、 . . . . . . . . . . . .15 8Welding . . . . . . . . . . . . . . . . . . . . . . .18 8.1Design and other requirements specific to welding . . . . . . . . . . . . . . . . . . . . . .18 8.2Welding consumables . . . . . . . . . . . . . .20 8.3Welding approvals . . . . . . . . . . . . . . . .20 8.4Genera

24、l production requirements for welding . . . . . . . . . . . . . . . . . . . . . . . .20 8.5Repairs to welds . . . . . . . . . . . . . . . . .21 8.6Pre-heating . . . . . . . . . . . . . . . . . . . . .22 8.7Post-weld heat treatment . . . . . . . . . . .22 8.8Welding subsequent to final post-weld heat

25、 treatment . . . . . . . . . . . . . . . . . . .23 8.9Welded joints, connections and production test plates . . . . . . . . . . . . . .23 8.10Attachment of non-pressure parts to drums and headers by welding . . . . . . .27 8.11Welding of tubes . . . . . . . . . . . . . . . . .27 8.12Flash butt weldi

26、ng of tubes . . . . . . . . . .29 8.13Welded tube water walls . . . . . . . . . . . .30 8.14Arc stud welding . . . . . . . . . . . . . . . . . .30 9Mechanical connections . . . . . . . . . . .30 9.1General . . . . . . . . . . . . . . . . . . . . . . .30 9.2Access openings . . . . . . . . . . . . . .

27、 . . .30 9.3Branches and nozzles mechanically connected to the main pressure parts . .31 9.4Tube connections . . . . . . . . . . . . . . . . .32 9.5The connection of non-pressure parts to pressure parts . . . . . . . . . . . . . . . . .34 10Thermal treatment . . . . . . . . . . . . . .34 10.1General

28、 . . . . . . . . . . . . . . . . . . . . . .34 10.2Heating cycles and heat treatment(s) associated with plate forming operations 34 10.3Pre-heating for welding and thermal cutting . . . . . . . . . . . . . . . . . . . . . . . . .36 10.4Post-weld heat treatment . . . . . . . . . . .37 10.5Heat treatm

29、ent of production test plates . . . . . . . . . . . . . . . . . . . . . . . . .46 Annex A (normative) Tube bending procedure tests . . . . . . . . . . . . . . . . . . . . . . . . . .47 A.1General . . . . . . . . . . . . . . . . . . . . . . . .47 A.2Hot or cold formed bends in tubes with outside diam

30、eter 142 mm . . . . . . . . . .47 A.3Cold formed bends in tubes with outside diameter 142 mm . . . . . . . . . . . . . . .50 A.4Hot formed bends in tubes with outside diameter 142 mm . . . . . . . . . . . . . . .51 Annex B (informative) Welded pressure connections and non-pressure containing attachm

31、ents . . . . . . . . . . . . .55 Annex C (normative) Manufacture of welded tubewalls . . . . . . . . . . . . . . . . . . . . . . .59 C.1General . . . . . . . . . . . . . . . . . . . . . . . .59 C.2Methods of manufacture . . . . . . . . . . . .59 C.3Allowable materials . . . . . . . . . . . . . . . .

32、59 C.4Manufacturing processes and controls . .60 C.5Welding procedure approvals . . . . . . . .61 C.6Production tests . . . . . . . . . . . . . . . . . .61 C.7Non destructive examination (NDE) . . . .61 Annex D (normative) Coiled boilers and coiled superheaters . . . . . . . . . . . . . . . . . . .

33、.66 D.1General . . . . . . . . . . . . . . . . . . . . . . . .66 D.2Special requirements . . . . . . . . . . . . . .66 Annex E (normative) Chemical recovery boilers 67 E.1General . . . . . . . . . . . . . . . . . . . . . . . .67 E.2Definition . . . . . . . . . . . . . . . . . . . . . . .67 E.3Specia

34、l requirements for forming of composite tube bends . . . . . . . . . . . . . .67 E.4Special requirements for manufacture of welded tube walls from composite tubes 68 E.5Material marking . . . . . . . . . . . . . . . . . .68 E.6Flash butt welding . . . . . . . . . . . . . . . .68 Annex F (informative

35、) Guidelines for the determination of the competency of boiler manufacturers . . . . . . . . . . . . . . .69 F.1General . . . . . . . . . . . . . . . . . . . . . . . .69 F.2Responsibility of the user . . . . . . . . . . .69 F.3Responsibility of the manufacturer . . . . .69 F.4Requirements concerning

36、 manufacturers competency . . . . . . . . . . . . . . . . . . . . .69 F.5Manufacturers competency declaration .69 Annex ZA (informative) Clauses of this European Standard addressing essential safety requirements or other provisions of the Pressure Equipment Directive . . . . . . . . .78 Bibliography

37、 . . . . . . . . . . . . . . . . . . . . . . . . .78 2 EN 12952-5:2001 (E) Foreword This Document (EN 12952-5:2001) has been prepared by Technical Committee CEN/TC 269 “Shell and water-tube boilers“, the secretariat of which is held by DIN. This European Standard shall be given the status of a natio

38、nal standard, either by publication of an identical text or by endorsement, at the latest by June 2002, and conflicting national standards shall be withdrawn at the latest by June 2002. This document has been prepared under a mandate given to CEN by the European Commission and the European Free Trad

39、e Association, and supports essential safety requirements of the Pressure Equipment Directive (PED)1). For relationship with Pressure Equipment Directive see informative annex ZA, which is an integral Part of this document. According to the CEN/CENELEC Internal Regulations, the national standards or

40、ganizations of the following countries are bound to implement this European Standard: Austria, Belgium, Czech Republic, Denmark, Finland, France, Germany, Greece, Iceland, Ireland, Italy, Luxembourg, Netherlands, Norway, Portugal, Spain, Sweden, Switzerland and United Kingdom. The European Standard

41、series EN 12952 concerning water-tube boilers and auxilliary installations consists of the following Parts: Part 1: General Part 2: Materials for pressure parts of boilers and accessories Part 3: Design and calculation for pressure parts Part 4: In-service boiler life expectancy calculations Part 5:

42、 Workmanship and construction of pressure parts of the boiler Part 6: Inspecing during construction, documentation and marking of pressure parts of the boiler Part 7: Requirements for equipment for the boiler Part 8: Requirements for firing systems for liquid and gaseous fuels for the boiler Part 9:

43、 Requirements for firing systems for solid fuels for the boiler Part 10: Requirements for safeguards against excessive pressure Part 11: Requirements for limiting devices and safety circuits of the boiler and accessories Part 12: Requirements for boiler feedwater and boiler water quality Part 13: Re

44、quirements for flue gas cleaning systems Part 14: Requirements for flue gas DENOX-systems Part 15: Acceptance tests Part 16: Requirements for grate and fluidized bed firing systems for solid fuels. Although these Parts may be obtained separately, it should be recognized that the Parts are inter-depe

45、ndent. As such, the design and manufacture of boilers requires the application of more than one Part in order for the requirements of the European Standard to be satisfactorily fulfilled. NOTE Part 4 is not applicable during the design, construction and installation stages. The annexes A, C, D and E

46、 are normative. The annexes B, F and ZA are informative. 1) Directive 97/23/EC of the European Parliament and of the Council of 29 May 1997 on the approximation of the laws of the Member States concerning pressuse equipment; OJEC L181. 3 EN 12952-5:2001 (E) 1 Scope This Part of the European Standard

47、 specifies requirements for the workmanship and construction of water-tube boilers as defined in EN 12952-1. 2 Normative references This European Standard incorporates, by dated or undated reference, provisions from other publications. These normative references are cited at the appropriate places i

48、n the text and the publications are listed hereafter. For dated references, subsequent amendments to or revisions of any of these publications apply to this European Standard only when incorporated in it by amendment or revision. For undated references, the latest edition of the publication referred

49、 to applies. EN 287-1, Approval testing of welders Fusion welding Part 1: Steels. EN 288-2, Specification and approval of welding procedures for metallic materials Part 2: Welding procedure specification for arc welding. EN 288-3, Specification and approval of welding procedures for metallic materials Part 3: Welding procedure tests for the arc welding of steels. EN 288-8, Specification and approval of welding procedures for metallic materials Part 8: Approval by a pre- production welding test. EN 571-1, Non destructive testing Penetrant testing

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1