BS-IEC-61366-5-1998.pdf

上传人:哈尼dd 文档编号:3746049 上传时间:2019-09-22 格式:PDF 页数:26 大小:407.69KB
返回 下载 相关 举报
BS-IEC-61366-5-1998.pdf_第1页
第1页 / 共26页
BS-IEC-61366-5-1998.pdf_第2页
第2页 / 共26页
BS-IEC-61366-5-1998.pdf_第3页
第3页 / 共26页
BS-IEC-61366-5-1998.pdf_第4页
第4页 / 共26页
BS-IEC-61366-5-1998.pdf_第5页
第5页 / 共26页
亲,该文档总共26页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《BS-IEC-61366-5-1998.pdf》由会员分享,可在线阅读,更多相关《BS-IEC-61366-5-1998.pdf(26页珍藏版)》请在三一文库上搜索。

1、BRITISH STANDARD BS IEC 61366-5:1998 Hydraulic turbines, storage pumps and pump-turbines Tendering Documents Part 5: Guidelines for technical specifications for tubular turbines ICS 27.140 Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:41:45 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS I

2、EC 61366-5:1998 This British Standard, having been prepared under the direction of the Engineering Sector Board, was published under the authority of the Standards Board and comes into effect on 15 September 1998 BSI 05-1999 ISBN 0 580 30319 5 National foreword This British Standard reproduces verba

3、tim IEC 61366-5:1998 and implements it as the UK national standard. The UK participation in its preparation was entrusted to Technical Committee MCE/15, Hydraulic turbines, which has the responsibility to: aid enquirers to understand the text; present to the responsible international/European commit

4、tee any enquiries on the interpretation, or proposals for change, and keep the UK interests informed; monitor related international and European developments and promulgate them in the UK. A list of organizations represented on this committee can be obtained on request to its secretary. From 1 Janua

5、ry 1997, all IEC publications have the number 60000 added to the old number. For instance, IEC 27-1 has been renumbered as IEC 60027-1. For a period of time during the change over from one numbering system to the other, publications may contain identifiers from both systems. Cross-references The Bri

6、tish Standards which implement international or European publications referred to in this document may be found in the BSI Standards Catalogue under the section entitled “International Standards Correspondence Index”, or by using the “Find” facility of the BSI Standards Electronic Catalogue. A Briti

7、sh Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages This document comprises a front

8、 cover, an inside front cover, pages i and ii, the IEC title page, pages ii to iv, pages 1 to 16 and a back cover. This standard has been updated (see copyright date) and may have had amendments incorporated. This will be indicated in the amendment table on the inside front cover. Amendments issued

9、since publication Amd. No.DateComments Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:41:45 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-5:1998 BSI 05-1999i Contents Page National forewordInside front cover Text of IEC 61366-51 Licensed Copy: sheffieldun sheffieldun, na, Sun No

10、v 26 11:41:45 GMT+00:00 2006, Uncontrolled Copy, (c) BSI ii blank Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:41:45 GMT+00:00 2006, Uncontrolled Copy, (c) BSI Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:41:45 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-5:1998

11、ii BSI 05-1999 Contents Page 0Introduction to technical specifications1 1Scope2 2Reference documents2 3Technical requirements2 3.1Scope of work2 3.2Limits of the contract3 3.3Supply by Employer3 3.4Design conditions3 3.5Technical performance and other guarantees5 3.6Mechanical design criteria7 3.7De

12、sign documentation8 3.8Materials and construction8 3.9Shop inspection and testing9 4Technical specifications for fixed/embedded components10 4.1Bulb structure and hatch cover10 4.2Stay ring (if employed in design)10 4.3Discharge ring11 4.4Draft tube and draft tube liner11 4.5Upstream and downstream

13、pressure taps and pipes11 5Technical specifications for stationary/removable components11 5.1Inner and outer rings11 5.2Guide vanes11 6Technical specifications for guide vane regulating apparatus11 6.1Servomotors11 6.2Connecting rods11 6.3Regulating ring11 6.4Guide vane linkage12 6.5Guide vane overl

14、oad protection12 6.6Locking devices12 6.7Counter weight12 7Technical specifications for rotating parts, bearings, seals and gear box (if used)12 7.1Runner12 7.2Runner blade regulating apparatus12 7.3Main shaft12 7.4Turbine guide bearing13 7.5Main shaft seal13 7.6Standstill (maintenance) seal13 7.7Ge

15、arbox (if used)13 8Technical specifications for thrust and counter-thurst bearing13 8.1Design data13 8.2Bearing support13 8.3Bearing assembly13 9Technical specifications for miscellaneous components13 9.1Walkways, access platforms and stairs13 9.2Lifting fixtures14 9.3Special tools14 9.4Standard too

16、ls14 9.5Nameplate14 10Technical specifications for auxiliary systems14 Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:41:45 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-5:1998 BSI 05-1999iii Page 10.1 Bearing lubrication system14 10.2 Turbine drainage14 10.3 Lubrication guide v

17、ane regulating system14 11Technical specifications for instrumentation14 11.1 Controls14 11.2 Indication14 11.3 Protection14 12Spare parts14 13Model acceptance tests14 14Site installation and commissioning tests15 14.1 General15 14.2 Installation procedures15 14.3 Tests during installation15 14.4 Co

18、mmissioning tests15 15Field acceptance tests16 15.1 Scope and reports16 15.2 Inspection of cavitating pitting16 Table 1 Summary of guide for the preparation of Tendering documents for hydraulic turbines, storage pumps and pump-turbinesiv Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:41:4

19、5 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-5:1998 iv BSI 05-1999 Table 1 Summary of guide for the preparation of Tendering documents for hydraulic turbines, storage pumps and pump-turbines CONTENTS OF GUIDE IEC 61366-1 TO IEC 61366-7SAMPLE TABLE OF CONTENTS OF TENDERING DOCUMENTS (TD)

20、 (Example for the Francis turbines; see 61366-1, Annex A) PartClauseTitleChapterTitle 1 1 1 1 1 1 1 1 1 2 3 4 5 6 General and annexes Object and scope of this guide Reference documents and definitions Arrangement of Tendering documents Guidelines for tendering requirements Guidelines for project inf

21、ormation Guidelines for general conditions, special conditions and general requirements 1 2 3 4 5 6 6.1 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.1.8 6.1.9 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 6.11 6.12 6.13 Tendering requirements Project information General conditions Special conditions General r

22、equirements Technical specifications Technical requirements Scope of work Limits of the contract Supply by Employer Design conditions Performance and other guarantees Mechanical design criteria Design documentation Materials and construction Shop inspection and testing Technical specifications for f

23、ixed/embedded components Technical specifications for stationary/removable components Technical specifications for guide vane regulating apparatus Technical specifications for rotating parts, bearings and seals Technical specifications for thrust bearings Technical specifications for miscellaneous c

24、omponents Technical specifications for auxiliary systems Technical specifications for instrumentation Spare parts Model tests Installation and commissioning Field acceptance tests 1 A B C D E F G H Annexes Sample table of contents of Tendering documents for Francis turbines Comments on factors for e

25、valuation of tenders Check list for tender form Examples of technical data sheets Technical performance guarantees Example of cavitation pitting guarantees Check list for model test specifications Sand erosion considerations 2 to 7Technical specifications 2 3 4 5 6 7 Francis turbines Pelton turbines

26、 Kaplan and propeller turbines Tubular turbines Pump-turbines Storage pumps Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:41:45 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-5:1998 BSI 05-19991 0 Introduction to technical specifications The main purpose of the technical specifi

27、cations is to describe the specific technical requirements for the hydraulic machine for which the Tendering documents (TD) are being issued. To achieve clarity and to avoid confusion in contract administration, the Employer should not specify anything in the technical specifications which is of imp

28、ortance only to the preparation of the tender. Such information and instructions should be given only in the instructions to Tenderers (ITT). Accordingly, the ITT may refer to other chapters and sections of the Tendering documents but not vice versa. As a general rule the word “Tenderer” should be c

29、onfined in use only to TD Chapter 1 “Tendering requirements”; elsewhere the term “Contractor” should be used. Special attention should be given to items of a project specific nature such as materials, protective coating systems, mechanical piping systems, electrical systems and instrumentation. It i

30、s common for the Employer to use technical standards for such items which would apply to all contracts for a particular project or projects. In this event, detailed technical standards should be specified in TD Chapter 5 “General requirements”. Technical specifications for the various types of hydra

31、ulic machines included in this guide are provided in the following parts: Francis turbines (Part 2); Pelton turbines (Part 3); Propeller and Kaplan turbines (Part 4); Tubular turbines (Part 5); Pump-turbines (Part 6); Storage pumps (Part 7). The guidelines for preparation of tubular turbine specific

32、ations include technical specifications for the following: Design conditions: Project arrangement, hydraulic conditions, mode of operation, generator characteristics, transient behaviour data, stability of the system, noise, vibration, pressure fluctuations and safety requirements. Technical perform

33、ance and other guarantees: power; discharge; efficiency; maximum momentary pressure; minimum momentary pressure; maximum momentary overspeed; maximum steady-state runaway speed; cavitation pitting; hydraulic thrust; maximum weights and dimensions for transportation, erection and maintenance. Mechani

34、cal design criteria: design standards, stresses and deflections and special design considerations. Design documentation: Contractors input needed for the Employers design, the Contractors drawings and data, Contractors review of the Employers design and technical reports by Contractor. Materials and

35、 construction: material selection and standards, quality assurance procedures, shop methods and personnel, corrosion protection and painting. Shop inspection and testing: general requirements and reports, material tests and certificates, dimensional checks, shop assembly and tests. Fixed/embedded co

36、mponents: generator hatch cover or pit, stay ring, discharge ring (if any), draft tube, draft tube liner foundations anchorage, upstream and downstream pressure taps and pipes. Stationary/removable components: bulb nose, generator access shaft inner and outer guide rings and guide vanes. Regulating

37、apparatus: servomotor, counterweight, connecting rods, regulating ring, guide vane linkage, system, guide vane overload protection and locking devices. Rotating parts, bearings and seals: runner, main shaft, guide bearing, main shaft seal, oil head and runner blade regulation system with servomotor

38、assembly with oil supply, linkage system, crosshead and oilhead. Thrust and counter-thrust bearing: bearing support, thrust collar and counter-thrust bearing pads and rings, oil sump and instrumentation. Gear box: gear box and related components. Miscellaneous components: walkways, platforms, liftin

39、g fixtures, special tools, standard tools and nameplate. Auxiliary systems: water supply to main shaft seal, turbine drainage, lubrication-guide vane regulating system, and oil supply to bearings. Instrumentation: controls, indication and protection. Spare parts: basic spare parts. Model acceptance

40、tests: test requirements. Site installation and commissioning test: installation procedures and commissioning. Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:41:45 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-5:1998 2 BSI 05-1999 Field acceptance tests: scope of field test scop

41、e and reports and inspection of cavitation pitting. An example of the proposed table of contents for Tendering documents for a Francis turbine is given in Annex A of IEC 61366-1. The example does not include technical specifications for the control system, relief valves, or high and low pressure sli

42、de valves or gates which, at the Employers option, may be included in the Tendering documents for the turbine or may be specified in separate documents. Chapter 6 (technical specifications) of the Tendering documents should be arranged as follows: 1 Scope This technical report, referred to herein as

43、 the Guide, is intended to assist in the preparation of Tendering documents and tendering proposals and in the evaluation of tenders for hydraulic machines. This part of IEC 61366 provides guidelines for tubular turbines. 2 Reference documents IEC 60041:1992, Field acceptance tests to determine the

44、hydraulic performance of hydraulic turbines, storage pumps and pump-turbines. IEC 60193:1965, International code for model acceptance tests of hydraulic turbines. IEC 60308:1970, International code for testing of speed governing systems for hydraulic turbines. IEC 60545:1976, Guide for commissioning

45、, operation and maintenance of hydraulic turbines. IEC 60609:1978, Cavitation pitting evaluation in hydraulic turbines, storage pumps and pump-turbines. IEC 60994:1991, Guide for field measurement of vibrations and pulsations in hydraulic machines (turbines, storage pumps and pump turbines). IEC 613

46、62, Guide to specification of hydro-turbine control systems1). ISO 3740:1980, Acoustics Determination of sound power levels of noise sources Guidelines for the use of basic standards and for the preparation of noise test codes. 3 Technical requirements 3.1 Scope of work This subclause should describ

47、e the scope of work and the responsibilities which are to be conferred upon the Contractor. The general statement of scope of work presented in TD2) subsection 2.1 (5.1 of IEC 61366-1) shall be consistent with what is presented here. In a similar manner, pay items in the tender form, TD section 1.2

48、(4.2 of IEC 61366-1) should be defined directly from TD subsection 6.1.1. The scope of work should begin with a general statement which outlines the various elements of the work including (where applicable) the design, model testing, supply of materials and labour, fabrication, machining, quality as

49、surance, quality control, shop assembly, shop testing, spare parts, transportation to site, site installation, commissioning, acceptance testing, warranty and other services specified or required for the items of work. 6.1Technical requirements; 6.2Technical specifications for fixed/embedded components; 6.3Technical specifications for stationary/removable components; 6.4Technical specifications for guide vane regulating apparatus; 6.5Technical specifications for rotating parts, gui

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1