BS-IEC-61366-3-1998.pdf

上传人:哈尼dd 文档编号:3747475 上传时间:2019-09-22 格式:PDF 页数:26 大小:409.86KB
返回 下载 相关 举报
BS-IEC-61366-3-1998.pdf_第1页
第1页 / 共26页
BS-IEC-61366-3-1998.pdf_第2页
第2页 / 共26页
BS-IEC-61366-3-1998.pdf_第3页
第3页 / 共26页
BS-IEC-61366-3-1998.pdf_第4页
第4页 / 共26页
BS-IEC-61366-3-1998.pdf_第5页
第5页 / 共26页
亲,该文档总共26页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《BS-IEC-61366-3-1998.pdf》由会员分享,可在线阅读,更多相关《BS-IEC-61366-3-1998.pdf(26页珍藏版)》请在三一文库上搜索。

1、BRITISH STANDARD BS IEC 61366-3:1998 Hyraulic turbines, storage pumps and pump-turbines Tendering Documents Part 3: Guidelines for technical specifications for Pelton turbines ICS 27.140 Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:42:05 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC

2、 61366-3:1998 This British Standard, having been prepared under the direction of the Engineering Sector Board, was published under the authority of the Standards Board and comes into effect on 15 September 1998 BSI 04-1999 ISBN 0 580 30317 9 National foreword This British Standard reproduces verbati

3、m IEC 61366-3:1998 and implements it as the UK national standard. The UK participation in its preparation was entrusted to Technical Committee MCE/15, Hydraulic turbines, which has the responsibility to: aid enquirers to understand the text; present to the responsible international/European committe

4、e any enquiries on the interpretation, or proposals for change, and keep the UK interests informed; monitor related international and European developments and promulgate them in the UK. A list of organizations represented on this committee can be obtained on request to its secretary. From 1 January

5、 1997, all IEC publications have the number 60000 added to the old number. For instance, IEC 27-1 has been renumbered as IEC 60027-1. For a period of time during the change over from one numbering system to the other, publications may contain identifiers from both systems. Cross-references The Briti

6、sh Standards which implement international or European publications referred to in this document may be found in the BSI Standards Catalogue under the section entitled “International Standards Correspondence Index”, or by using the “Find” facility of the BSI Standards Electronic Catalogue. A British

7、 Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages This document comprises a front c

8、over, an inside front cover, pages i and ii, the IEC title page, pages ii to iv, pages 1 to 16 and a back cover. This standard has been updated (see copyright date) and may have had amendments incorporated. This will be indicated in the amendment table on the inside front cover. Amendments issued si

9、nce publication Amd. No.DateComments Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:42:05 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-3:1998 BSI 04-1999i Contents Page National forewordInside front cover Text of IEC 61366-31 Licensed Copy: sheffieldun sheffieldun, na, Sun Nov

10、26 11:42:05 GMT+00:00 2006, Uncontrolled Copy, (c) BSI ii blank Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:42:05 GMT+00:00 2006, Uncontrolled Copy, (c) BSI Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:42:05 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-3:1998 ii

11、 BSI 04-1999 Contents Page 0Introduction to technical specifications1 1Scope2 2Reference documents2 3Technical requirements2 3.1Scope of work2 3.2Limits of the contract3 3.3Supply by Employer3 3.4Design conditions4 3.5Technical performance and other guarantees6 3.6Mechanical design criteria8 3.7Desi

12、gn documentation8 3.8Materials and construction9 3.9Shop inspection and testing9 4Technical specifications for fixed/embedded components10 4.1Manifold10 4.2Turbine housing11 5Technical specifications for stationary/removable components11 5.1Branch pipe (including intake pipe and nozzle pipe)11 5.2Up

13、per turbine housing (if not embedded)11 5.3Turbine cover12 5.4Brake jet assembly12 6Technical specifications for injector/deflector system12 6.1Injector system12 6.2Deflector system12 7Technical specifications for rotating parts, guide bearings and seals12 7.1Runner12 7.2Main shaft13 7.3Turbine guid

14、e bearing13 7.4Main shaft seal (if necessary)13 7.5Standstill maintenance seal (if necessary)13 8Technical specifications for thrust bearing (when specified as part of the hydraulic machine)13 8.1Design data13 8.2Bearing support13 8.3Bearing assembly13 8.4Oil injection pressure system14 9Technical s

15、pecifications for miscellaneous components14 9.1Walkways, access platforms and stairs14 9.2Lifting fixtures14 9.3Special tools14 9.4Standard tools14 9.5Turbine pit hoist14 9.6Nameplate14 9.7Runner cart and rails (if required)14 9.8Access door to turbine housing interior (if required)14 10Technical s

16、pecifications for auxiliary systems14 10.1 Bearing lubrication system14 10.2 Cooling water system for runner14 10.3 Tailwater air admission system14 Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:42:05 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-3:1998 BSI 04-1999iii Page 10.4

17、 Turbine pit drainage14 11Technical specifications for instrumentation15 11.1 Controls15 11.2 Indication15 11.3 Protection15 12Spare parts15 13Model acceptance tests15 14Site installation and commissioning tests15 14.1 General15 14.2 Installation procedures16 14.3 Tests during installation16 14.4 Co

18、mmissioning tests16 15Field acceptance tests16 15.1 Scope and reports16 15.2 Inspection of cavitating pitting16 Table 1 Summary of guide for the preparation of Tendering Documents for hydraulic turbines, storage pumps and pump-turbinesiv Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:42:0

19、5 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-3:1998 iv BSI 04-1999 Table 1 Summary of guide for the preparation of Tendering Documents for hydraulic turbines, storage pumps and pump-turbines CONTENTS OF GUIDE IEC 61366-1 TO IEC 61366-7 SAMPLE TABLE OF CONTENTS OF TENDERING DOCUMENTS (TD

20、) (Example for the Francis turbines; see 61366-1, Annex A) PartClauseTitleChapter Title 1 1 1 1 1 1 1 1 1 2 3 4 5 6 General and annexes Object and scope of this guide Reference documents and definitions Arrangement of Tendering Documents Guidelines for tendering requirements Guidelines for project i

21、nformation Guidelines for general conditions, special conditions and general requirements 1 2 3 4 5 6 6.1 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.1.8 6.1.9 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 6.11 6.12 6.13 Tendering requirements Project information General conditions Special conditions General

22、 requirements Technical specifications Technical requirements Scope of work Limits of the contract Supply by Employer Design conditions Performance and other guarantees Mechanical design criteria Design documentation Materials and construction Shop inspection and testing Technical specifications for

23、 fixed/embedded components Technical specifications for stationary/removable components Technical specifications for guide vane regulating apparatus Technical specifications for rotating parts, bearings and seals Technical specifications for thrust bearings Technical specifications for miscellaneous

24、 components Technical specifications for auxiliary systems Technical specifications for instrumentation Spare parts Model tests Installation and commissioning Field acceptance tests 1Annexes A B C D E F G H Sample table of contents of Tendering Documents for Francis turbines Comments on factors for

25、evaluation of tenders Check list for tender form Examples of technical data sheets Technical performance guarantees Example of cavitation pitting guarantees Check list for model test specifications Sand erosion considerations 2 to 7Technical specifications 2 3 4 5 6 7 Francis turbines Pelton turbine

26、s Kaplan and propeller turbines Tubular turbines Pump-turbines Storage pumps Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:42:05 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-3:1998 BSI 04-19991 0 Introduction to technical specifications The main purpose of the technical specif

27、ications is to describe the specific technical requirements for the hydraulic machine for which the Tendering documents (TD) are being issued. To achieve clarity and to avoid confusion in contract administration, the Employer should not specify anything in the technical specifications which is of im

28、portance only to the preparation of the tender. Such information and instructions should be given only in the Instructions to Tenderers (ITT). Accordingly, the ITT may refer to other chapters and sections the Tendering documents but not vice versa. As a general rule the word “Tenderer” should be con

29、fined in use only to TD chapter 1 “Tendering requirements”; elsewhere the term “Contractor” should be used. Special attention should be given to items of a project specific nature such as materials, protective coating systems, mechanical piping systems, electrical systems and instrumentation. It is

30、common for the Employer to use technical standards for such items which would apply to all contracts for a particular project or projects. In this event, detailed technical standards should be specified in TD chapter 5 “General requirements”. Technical specifications for the various types of hydraul

31、ic machines included in this guide are provided in the following parts: Francis turbines (Part 2); Pelton turbines (Part 3); Propeller and Kaplan turbines (Part 4); Tubular turbines (Part 5); Pump-turbines (Part 6); Storage pumps (Part 7). The guidelines for preparation of Pelton turbine specificati

32、ons include technical specifications for the following: Design conditions: Project arrangement, hydraulic conditions, specified conditions, mode of operation, generator characteristics, synchronous condenser characteristics, transient behaviour data, stability of the system, noise, vibration, pressu

33、re fluctuations and safety requirements. Technical performance and other guarantees: power; discharge (if required); efficiency; maximum momentary pressure; minimum momentary pressure; maximum momentary overspeed; maximum steady-state runaway speed; cavitation pitting; hydraulic thrust; maximum weig

34、hts and dimensions for transportation, erection and maintenance. Mechanical design criteria: design standards, stresses and deflections and special design considerations (earthquake acceleration, etc.). Design documentation: Contractors input needed for the Employers design, Contractors drawings and

35、 data, Contractors review of the Employers design and technical reports by Contractor. Materials and construction: material selection and standards, quality assurance procedures, shop methods, corrosion protection and painting. Shop inspection and testing: general requirements and reports, material

36、tests and certificates, dimensional checks, shop assembly and tests. Fixed/embedded components: manifold for multi-jet turbines and turbine housing. Stationary/removable components: branch pipe for horizontal turbines, upper turbine housing (if not embedded), turbine cover, brake jet assembly). Inje

37、ctor and deflector systems: nozzles, needles, needle servomotors, deflectors or cut-in deflectors, deflector servomotors, links, needle-deflector combining mechanism and oil piping. Rotating parts, bearings and seals: runner, main shaft, guide bearing with oil supply, oil/water cooler, shaft seal. T

38、hrust bearing (when part of the hydraulic machine supply): bearing support, thrust block, rotating ring, thrust bearing pads and pivots, oil sump with oil supply (common with guide bearing, if any), oil/water coolers, instrumentation. Miscellaneous components: walkways, lifting fixtures, special too

39、ls, standard tools, turbine pit hoist, nameplate, runner inspection platform (if required). Auxiliary systems: bearing lubrication system (if required), tailwater air admission system, turbine pit drainage (if required), turbine housing ventilation, tailwater depression (if required). Instrumentatio

40、n: controls, indication and protection. Spare parts: basic spare parts. Licensed Copy: sheffieldun sheffieldun, na, Sun Nov 26 11:42:05 GMT+00:00 2006, Uncontrolled Copy, (c) BSI BS IEC 61366-3:1998 2 BSI 04-1999 Model acceptance tests: test requirements. Site installation and commissioning tests: I

41、nstallation procedures and commissioning tests. Field acceptance tests: scope of field tests, reports and inspection of cavitation pitting. An example of the proposed table of contents for Tendering documents for a Francis turbine is given in Annex A of IEC 61366-1. The example does not include tech

42、nical specifications for the control system, or high-pressure side valves which, at the Employers option, may be included in the Tendering documents for the Pelton turbine or may be specified in separate Tendering documents. Chapter 6 (technical specifications) of the Tendering documents should be a

43、rranged as follows: 1 Scope This Technical Report, referred to herein as “Guide”, is intended to assist in the preparation of Tendering documents and Tendering proposals and in the evaluation of tenders for hydraulic machines. This part of IEC 61366 provides guidelines for Pelton turbines. 2 Referen

44、ce documents IEC 60041:1992, Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump-turbines. IEC 60193:1965, International code for model acceptance tests of hydraulic turbines. IEC 60308:1970, International code for testing of speed governing sy

45、stems for hydraulic turbines. IEC 60545:1976, Guide for commissioning, operation an maintenance of hydraulic turbines. IEC 60609-2:1997, Cavitation pitting evaluation in hydraulic turbines, storage pumps and pump-turbines Part 2: Evaluation in Pelton turbines. IEC 60994:1991, Guide for field measure

46、ment of vibrations and pulsations in hydraulic machines (turbines, storage pumps and pump-turbines). IEC 60995:1991, Determination of the prototype performance from model acceptance tests of hydraulic machines with consideration of scale effects. IEC 61362, Guide to specification of hydro-turbine co

47、ntrol systems1). ISO 3740:1980, Acoustics Determination of sound power levels of noise sources Guidelines for the use of basic standards and for the propagation of noise test codes. 3 Technical requirements 3.1 Scope of work This subclause should describe the scope of work and the responsibilities w

48、hich are to be conferred upon the Contractor. The general statement of scope of work presented in TD2) section 2.1 (5.1) shall be consistent with what is presented here. In a similar manner, pay items in the tender form, TD section 1.2 (subclause 4.2) should be defined directly from TD subsection 6.

49、1.1. 6.1Technical requirements; 6.2Technical specifications for fixed/embedded components; 6.3Technical specifications for stationary/removable components; 6.4Technical specifications for deflector/cut-in deflector regulating apparatus; 6.5Technical specifications for rotating parts, guide bearings and seals; 6.6Technical specifications for thrust bearing; 6.7Technical specifications for miscellaneous components; 6.8Technical specifications for auxiliary systems; 6.9Technical specifi

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1