DD-CEN-ISO-TS-15874-7-2003.pdf

上传人:yyf 文档编号:3752621 上传时间:2019-09-22 格式:PDF 页数:20 大小:210.89KB
返回 下载 相关 举报
DD-CEN-ISO-TS-15874-7-2003.pdf_第1页
第1页 / 共20页
DD-CEN-ISO-TS-15874-7-2003.pdf_第2页
第2页 / 共20页
DD-CEN-ISO-TS-15874-7-2003.pdf_第3页
第3页 / 共20页
DD-CEN-ISO-TS-15874-7-2003.pdf_第4页
第4页 / 共20页
DD-CEN-ISO-TS-15874-7-2003.pdf_第5页
第5页 / 共20页
亲,该文档总共20页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《DD-CEN-ISO-TS-15874-7-2003.pdf》由会员分享,可在线阅读,更多相关《DD-CEN-ISO-TS-15874-7-2003.pdf(20页珍藏版)》请在三一文库上搜索。

1、DRAFT FOR DEVELOPMENT DD CEN ISO/TS 15874-7:2003 Plastics piping systems for hot and cold water installations Polypropylene (PP) Part 7: Guidance for the assessment of conformity ICS 23.040.01; 91.140.60 ? Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:01:35

2、 GMT+00:00 2006, Uncontrolled Copy, (c) BSI DD CEN ISO/TS 15874-7:2003 This Draft for Development was published under the authority of the Standards Policy and Strategy Committee on 31 July 2006 BSI 2006 ISBN 0 580 48958 2 National foreword This Draft for Development reproduces verbatim CEN ISO/TS 1

3、5874-7:2003. This publication is not to be regarded as a British Standard. It is being issued in the Draft for Development series of publications and is of a provisional nature. It should be applied on this provisional basis, so that information and experience of its practical application can be obt

4、ained. A review of this Draft for Development will be carried out not later than 2 years after its publication. Notification of the start of the review period, with a request for the submission of comments from users of this Draft for Development, will be made in an announcement in the appropriate i

5、ssue of Update Standards. According to the replies received, the responsible BSI Committee will judge whether the Draft for Development can be converted into a British Standard or what other action should be taken. Observations which it is felt should receive attention before the official call for c

6、omments will be welcomed. These should be sent to the Secretary of the responsible BSI Subcommittee PRI/88/2, Plastics piping for pressure applications, at British Standards House, 389 Chiswick High Road, London W4 4AL, giving the document reference and clause number and proposing, where possible, a

7、n appropriate revision of the text. A list of organizations represented on this subcommittee can be obtained on request to its secretary. Cross-references The British Standards which implement international or European publications referred to in this document may be found in the BSI Catalogue under

8、 the section entitled “International Standards Correspondence Index”, or by using the “Search” facility of the BSI Electronic Catalogue or of British Standards Online. This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct appli

9、cation. Summary of pages This document comprises a front cover, an inside front cover, the CEN ISO/TS title page, pages 2 to 16, an inside back cover and a back cover. The BSI copyright notice displayed in this document indicates when the document was last issued. Amendments issued since publication

10、 Amd. No. DateComments Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:01:35 GMT+00:00 2006, Uncontrolled Copy, (c) BSI TECHNICAL SPECIFICATION SPCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION CEN ISO/TS 15874-7 December 2003 ICS 23.040.01, 91.140.60 English v

11、ersion Plastics piping systems for hot and cold water installations Polypropylene (PP) Part 7: Guidance for the assessment of conformity (ISO/TS 15874-7:2003) Systmes de canalisations en plastique pour les installations deau chaude et froide Polypropylne (PP) Partie 7: Guide pour lvaluation de la co

12、nformit (ISO/TS 15874-7:2003) Kunststoff-Rohrleitungssyteme fr die Warm- und Kaltwasserinstallation Polypropylen (PP) Teil 7: Empfehlungen fr die Beurteilung der Konformitt (ISO/TS 15874-7:2003) This Technical Specification (CEN ISO/TS) was approved by CEN on 9th February 2003 for provisional applic

13、ation. The period of validity of this CEN ISO/TS is limited initially to three years. After two years the members of CEN will be requested to submit their comments, particularly on the question whether the CEN ISO/TS can be converted into a European Standard. CEN members are required to announce the

14、 existence of this CEN ISO/TS in the same way as for an EN and to make the CEN ISO/TS available. It is permissible to keep conflicting national standards in force (in parallel to the CEN ISO/TS) until the final decision about the possible conversion of the CEN ISO/TS into an EN is reached. CEN membe

15、rs are the national standards bodies of Austria, Belgium, Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, Malta, Netherlands, Norway, Portugal, Slovakia, Spain, Sweden, Switzerland and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COM

16、IT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: rue de Stassart, 36 B-1050 Brussels 2003 CENAll rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. CEN ISO/TS 15874-7 :2003 E Licensed Copy: London South Bank Universi

17、ty, London South Bank University, Tue Dec 12 03:01:35 GMT+00:00 2006, Uncontrolled Copy, (c) BSI 2 Contents Foreword 3 Introduction. 4 1Scope 5 2Normative references 5 3Definitions, symbols and abbreviations. 5 3.1Definitions. 5 3.2Abbreviations 7 4Requirements 8 4.1General. 8 4.2Testing and inspect

18、ion. 8 4.2.1Grouping. 8 4.2.2Type testing (TT) 9 4.2.3Batch release tests (BRT) 12 4.2.4Process verification tests (PVT). 14 4.2.5Audit tests (AT) 14 4.2.6Indirect tests (IT) 15 4.2.7Inspection records and test records. 15 Bibliography 16 CEN ISO/TS 15874-7:2003 Licensed Copy: London South Bank Univ

19、ersity, London South Bank University, Tue Dec 12 03:01:35 GMT+00:00 2006, Uncontrolled Copy, (c) BSI 3 Foreword This document (CEN ISO/TS 15874-7:2003) has been prepared by Technical Committee CEN /TC 155, “Plastics piping systems and ducting systems“, the Secretariat of which is held by NEN in coll

20、aboration with Technical Committee ISO/TC 138 “Plastics pipes, fittings and valves for the transport of fluids“. This Technical Specification (TS) can be used to support elaboration of national third party certification procedures for products conforming to the applicable Part(s) of EN ISO 15874. Th

21、is Technical Specification is a Part of a System Standard for plastics piping systems of a particular material for a specified application. There are a number of such System Standards. System Standards are based on the results of the work undertaken in ISO/TC 138 “Plastics pipes, fittings and valves

22、 for the transport of fluids“, which is a Technical Committee of the International Organization for Standardization (ISO). They are supported by separate standards on test methods to which references are made throughout the System Standard. The System Standards are consistent with general standards

23、on functional requirements and on recommended practice for installation. This series consists of the following Parts 1), under the general title Plastics piping systems for hot and cold water installations Polypropylene (PP) Part 1: General Part 2: Pipes Part 3: Fittings Part 5: Fitness for purpose

24、of the system Part 7: Guidance for the assessment of conformity (this Technical Specification) This Technical Specification includes a bibliography. At the date of publication of this Technical Specification, System Standards for piping systems of other plastics materials used for the same applicati

25、on are the following: EN ISO 15875, Plastics piping systems for hot and cold water installations Cross-linked polyethylene (PE-X) (ISO 15875:2003) EN ISO 15876, Plastics piping systems for hot and cold water installations Polybutylene (PB) (ISO 15876:2003) EN ISO 15877, Plastics piping systems for h

26、ot and cold water installations Chlorinated poly(vinyl chloride) (PVC-C) (ISO 15877:2003) According to the CEN/CENELEC Internal Regulations, the national standards organizations of the following countries are bound to announce this Technical Specification: Austria, Belgium, Czech Republic, Denmark,

27、Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, Malta, Netherlands, Norway, Portugal, Slovakia, Spain, Sweden, Switzerland and the United Kingdom. 1) This System Standard does not incorporate Part 4: Ancillary equipment and Part 6: Guidance for installation. For ancil

28、lary equipment separate standards can apply. For guidance for installation reference is made to separate documents. NOTE A guidance for installation of plastics piping systems made from different materials, intended to be used for hot and cold water installations, is covered by ENV 12108 1. CEN ISO/

29、TS 15874-7:2003 Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:01:35 GMT+00:00 2006, Uncontrolled Copy, (c) BSI 4 Introduction This series specifies the requirements for a piping system when made from polypropylene (PP). The piping system is intended to be u

30、sed for hot and cold water installations. In respect of potential adverse effects on the quality of water intended for human consumption, caused by the product covered by EN ISO 15874: This Technical Specification provides no information as to whether the product may be used without restriction in a

31、ny of the Member States of the EU or EFTA; It should be noted that, while awaiting the adoption of verifiable European criteria, existing national regulations concerning the use and/or the characteristics of this product remain in force. Requirements and test methods for material and components are

32、specified in Part 1 to Part 3 of EN ISO 15874. Characteristics for fitness for purpose (mainly for joints) are covered in Part 5. This Technical Specification gives guidance for the assessment of conformity of materials, components, joints and assemblies and it is intended to be used by certificatio

33、n bodies, inspection bodies, testing laboratories and manufacturers. CEN ISO/TS 15874-7:2003 Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:01:35 GMT+00:00 2006, Uncontrolled Copy, (c) BSI 5 1 Scope This Technical Specification gives guidance for the assessm

34、ent of conformity to be included in the manufacturers quality plan as part of his quality system. This Technical Specification includes: a) requirements for materials, components, joints and assemblies given in the applicable Part(s) of EN ISO 15874:2003; b) requirements for the manufacturers qualit

35、y system; NOTE 1 It is recommended that the quality system conforms to EN ISO 9001:20002. c) definitions and procedures to be applied if third party certification is involved. NOTE 2 If third party certification is involved, it is recommended that the certification body is accredited to EN 450113 or

36、 EN 450124, as applicable. In conjunction with the other parts of EN ISO 15874:2003 (see Foreword), this Technical Specification is applicable to polypropylene (PP) piping systems intended to be used for hot and cold water installations within buildings for the conveyance of water, whether or not in

37、tended for human consumption (domestic systems) and for heating systems, under design pressures and temperatures appropriate to the class of application (see Table 1 of EN ISO 15874-1:2003). 2 Normative references This Technical Specification incorporates, by dated or undated reference, provisions f

38、rom other publications. These normative references are cited at the appropriate places in the text and the publications are listed hereafter. For dated references, subsequent amendments to, or revisions of, any of these publications apply to this Technical Specification only when incorporated in it

39、by amendment or revision. For undated references the latest edition of the publication referred to applies (including amendments). EN ISO 15874-1:2003, Plastics piping systems for hot and cold water installations Polypropylene (PP) Part 1: General EN ISO 15874-2:2003, Plastics piping systems for hot

40、 and cold water installations Polypropylene (PP) Part 2: Pipes EN ISO 15874-3:2003, Plastics piping systems for hot and cold water installations Polypropylene (PP) Part 3: Fittings EN ISO 15874-5:2003, Plastics piping systems for hot and cold water installations Polypropylene (PP) Part 5: Fitness fo

41、r purpose of the system ISO 2859-1:1999, Sampling procedures for inspection by attributes Part 1: Sampling plans indexed by acceptable quality level (AQL) for lot-by-lot inspection ISO 3951:1989, Sampling procedures and charts for inspection by variables for percent nonconforming 3 Definitions, symb

42、ols and abbreviations For the purposes of this Technical Specification, the definitions, symbols and abbreviations given in Part 1 and Part 3 of EN ISO 15874:2003 apply, together with the following. 3.1 Definitions 3.1.1 certification body impartial body, governmental or non-governmental, possessing

43、 the necessary competence and responsibility to carry out certification of conformity according to given rules of procedure and management CEN ISO/TS 15874-7:2003 Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:01:35 GMT+00:00 2006, Uncontrolled Copy, (c) BSI

44、 6 3.1.2 inspection body impartial organization or company, approved by a certification body as possessing the necessary competence to verify and/or to carry out initial type testing, audit testing and inspection of the manufacturers factory production control in accordance with the relevant Europea

45、n Standard 3.1.3 testing laboratory laboratory which measures, tests, calibrates or otherwise determines the characteristics of the performance of materials and products 3.1.4 quality system organizational structure, responsibilities, procedures, processes and resources for implementing quality mana

46、gement (see EN ISO 9000:20005) 3.1.5 quality plan document setting out the specific quality practices, resources and sequence of activities relevant to a particular product or range of products 3.1.6 type testing (TT) testing performed to prove that the material, component, joint or assembly is capa

47、ble of conforming to the requirements given in the relevant standard 3.1.7 preliminary type testing (PTT) type testing carried out by or on behalf of the manufacturer 3.1.8 initial type testing (ITT) type testing carried out by or on behalf of a certification body for certification purposes 3.1.9 ba

48、tch release test (BRT) test performed by the manufacturer on a batch of components, which has to be satisfactorily completed before the batch can be released 3.1.10 process verification test (PVT) test performed by the manufacturer on materials, components, joints or assemblies at specific intervals

49、 to confirm that the process continues to be capable of producing components conforming to the requirements given in the relevant standard NOTE Such tests are not required to release batches of components and are carried out as a measure of process control. 3.1.11 audit test (AT) test performed by or on behalf of a certification body to confirm that the material, component, joint or assembly continues to conform to the requirements given

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1