1、TECHNICAL SPECIFICATION SUBSEA PRODUCTION SYSTEMS DEP 37.80.00.30-Gen. March 1994 DESIGN AND ENGINEERING PRACTICE USED BY COMPANIES OF THE ROYAL DUTCH/SHELL GROUP This document is confidential. Neither the whole nor any part of this document may be disclosed to any third party without the prior writ

2、ten consent of Shell Internationale Petroleum Maatschappij B.V., The Hague, the Netherlands. The copyright of this document is vested in Shell Internationale Petroleum Maatschappij B.V., The Hague, the Netherlands. All rights reserved. Neither the whole nor any part of this document may be reproduce

3、d, stored in any retrieval system or transmitted in any form or by any means (electronic, mechanical, reprographic, recording or otherwise) without the prior written consent of the copyright owner. PDF created with pdfFactory Pro trial version PREFACE DEP (Design and Engineering Practice) publicati

4、ons reflect the views, at the time of publication, of: Shell International Oil Products B.V. (SIOP) and Shell International Exploration and Production B.V. (SIEP) and Shell International Chemicals B.V. (SIC) The Hague, The Netherlands, and other Service Companies. They are based on the experience ac

5、quired during their involvementwith the design, construction, operation and maintenance of processing units and facilities, and they are supplemented with the experience of Group Operating companies. Where appropriate they are based on, or reference is made to, national and international standards a

6、nd codes of practice. The objective is to set the recommendedstandard for good design and engineeringpractice applied by Group companies operating an oil refinery, gas handling installation, chemical plant, oil and gas production facility, or any other such facility, and thereby to achieve maximum t

7、echnical and economic benefit from standardization. The information set forth in these publications is provided to users for their consideration and decision to implement. This is of particular importance where DEPs may not cover every requirement or diversity of condition at each locality. The syst

8、em of DEPs is expected to be sufficiently flexible to allow individual operating companies to adapt the information set forth in DEPs to their own environment and requirements. When Contractors or Manufacturers/Suppliers use DEPs they shall be solely responsible for the quality of work and the attai

9、nment of the required design and engineering standards. In particular, for those requirements not specifically covered, the Principal will expect them to follow those design and engineering practices which will achieve the same level of integrity as reflected in the DEPs. If in doubt, the Contractor

10、 or Manufacturer/Supplier shall, without detracting from his own responsibility, consult the Principal or its technical advisor. The right to use DEPs is granted by SIOP, SIEP or SIC, in most cases under Service Agreements primarily with companies of the Royal Dutch/Shell Group and other companies r

11、eceiving technical advice and services from SIOP, SIEP or SIC. Consequently, three categories of users of DEPs can be distinguished: 1)Operating companies having a Service Agreement with SIOP, SIEP, SIC or other Service Company. The use of DEPs by these Operating companies is subject in all respects

12、 to the terms and conditions of the relevant Service Agreement. 2)Other parties who are authorized to use DEPs subject to appropriate contractual arrangements. 3)Contractors/subcontractors and Manufacturers/Suppliers under a contract with users referred to under 1) or 2) which requires that tenders

13、for projects, materials supplied or - generally - work performed on behalf of the said users comply with the relevant standards. Subject to any particular terms and conditions as may be set forth in specific agreements with users, SIOP, SIEP and SIC disclaim any liability of whatsoever nature for an

14、y damage (including injury or death) suffered by any company or person whomsoever as a result of or in connection with the use, application or implementation of any DEP, combination of DEPs or any part thereof. The benefit of this disclaimer shall inure in all respects to SIOP, SIEP, SIC and/or any

15、company affiliated to these companies that may issue DEPs or require the use of DEPs. Without prejudice to any specific terms in respect of confidentiality under relevant contractual arrangements, DEPs shall not, without the prior written consent of SIOP and SIEP, be disclosed by users to any compan

16、y or person whomsoever and the DEPs shall be used exclusively for the purpose for which they have been provided to the user. They shall be returned after use, including any copies which shall only be made by users with the express prior written consent of SIOP and SIEP. The copyright of DEPs vests i

17、n SIOP and SIEP. Users shall arrange for DEPs to be held in safe custody and SIOP or SIEP may at any time require information satisfactory to them in order to ascertain how users implement this requirement. All administrative queries should be directed to the DEP Administrator in SIOP. NOTE: In addi

18、tion to DEP publications there are Standard Specifications and Draft DEPs for Development (DDDs). DDDs generally introduce new procedures or techniques that will probably need updating as further experience develops during their use. The above requirements for distribution and use of DEPs are also a

19、pplicable to Standard Specifications and DDDs. Standard Specifications and DDDs will gradually be replaced by DEPs. DEP 37.80.00.30-Gen. March 1994 Page 2 PDF created with pdfFactory Pro trial version TABLE OF CONTENTS 1.INTRODUCTION .4 1.1SCOPE 4 1.2DISTRIBUTION, INTENDED USE AND REGULATORY CONSID

20、ERATIONS4 1.3DEFINITIONS 4 2.PHILOSOPHY .5 3.PROJECT SPECIFIC REQUIREMENTS.6 4.API STANDARDS APPROVED FOR USE .7 5.API STANDARDS IN PREPARATION 8 6.REFERENCES 9 DEP 37.80.00.30-Gen. March 1994 Page 3 PDF created with pdfFactory Pro trial version 1.INTRODUCTION 1.1SCOPE This DEP which is a revision

21、of the DEP of the same number dated June 1992 gives minimum requirements for the design, manufacture, testing, operation and abandonment of subsea production systems. This DEP is based upon the API 17 series. 1.2DISTRIBUTION, INTENDED USE AND REGULATORY CONSIDERATIONS Unless otherwise authorised by

22、SIPM, the distribution of this DEP is confined to companies forming part of the Royal Dutch/Shell Group or managed by a Group company, and to Contractors and Manufacturers/Suppliers nominated by them (i.e. the distribution code is “F“ as described in DEP 00.00.05.05-Gen.) This DEP is intended for us

23、e in subsea oil and gas production facilities. If national and/or local regulations exist in which some of the requirements may be more stringent than in this DEP the Contractor shall determine by careful scrutiny which of the requirements are the more stringent and which combination of requirements

24、 will be acceptable as regards safety, environmental, economic and legal aspects. In all cases the Contractor shall inform the Principal of any deviation from the requirements of this DEP which is considered to be necessary in order to comply with national and/or local regulations. The Principal may

25、 then negotiate with the Authorities concerned with the object of obtaining agreement to follow this DEP as closely as possible. 1.3DEFINITIONS The Contractor is the party which carries out all or part of the design, engineering, procurement, construction, commissioning or management of a project or

26、 operation of a facility. The Principal may undertake all or part of the duties of the Contractor. The Manufacturer/Supplier is the party which manufactures or supplies equipment and services to perform the duties specified by the Contractor. The Principal is the party which initiates the project an

27、d ultimately pays for its design and construction. The Principal will generally specify the technical requirements. The Principal may also include an agent or consultant authorised to act for, and on behalf of, the Principal. The word shall indicates a requirement. The word should indicates a recomm

28、endation. DEP 37.80.00.30-Gen. March 1994 Page 4 PDF created with pdfFactory Pro trial version 2.PHILOSOPHY This DEP references Recommended Practices and Specifications which are approved by SIPM for use in Group operations. It also references forthcoming documents for which SIPM is actively partic

29、ipating in the input and review. It is intended that, upon their publication, either by the American Petroleum Institute, or the superseding version by the InternationalStandardOrganisation(ISO)beingdevelopedbyISOcommittee ISO/TC67/SC4/WG6 Petroleum and Natural Gas Industries - Subsea Equipment, the

30、se documents will be adopted by a revision to this DEP. The principle followed by these documents is to define the functional requirements of the equipment, and to specify the means by which compliance with these requirements can be demonstrated. DEP 37.80.00.30-Gen. March 1994 Page 5 PDF created wi

31、th pdfFactory Pro trial version 3.PROJECT SPECIFIC REQUIREMENTS It is recognised that there will be project specific requirements that cannot be specified in a Group standard. These include: -Wellstream fluid characteristics -Equipment and system configuration. Data on such items shall be added as

32、supplements to the appropriate standard. Other amendments may also be made, but should cross-reference the corresponding paragraph in the appropriate standard. DEP 37.80.00.30-Gen. March 1994 Page 6 PDF created with pdfFactory Pro trial version 4.API STANDARDS APPROVED FOR USE The following documen

33、ts are approved for use, with no Group amendments: API RP 17A API RP 17C API Spec 17D API Spec 17E. NOTE:API RP 17B is also approved for use, but is covered separately by DDD 39.40.20.30-Gen. DEP 37.80.00.30-Gen. March 1994 Page 7 PDF created with pdfFactory Pro trial version 5.API STANDARDS IN PRE

34、PARATION The following standards are currently being prepared, with SIPM participation. Once issued by the American Petroleum Institute it is intended that they shall be adopted for Group use. In the meantime the latest drafts can be referred to for guidance: API Spec 17F API RP 17G API Spec 17H API

35、 RP 17I DEP 37.80.00.30-Gen. March 1994 Page 8 PDF created with pdfFactory Pro trial version 6.REFERENCES In this DEP, reference is made to the following publications: NOTE:Unless specifically designated by date, the latest edition of each publication shall be used, together with any amendments/sup

36、plements/revisionsthereto. SHELL STANDARDS Index to DEP Publications and StandardDEP 00.00.05.05-Gen. Specifications High pressure metal/polymer flexible pipe for use inDDD 39.40.20.30-Gen. oil and gas operations as flowlines and risers. AMERICAN STANDARDS Design and operation of subsea production s

37、ystemsAPI RP 17A 1st edition, September 1, 1987 Flexible pipeAPI RP 17B Through flowline systemsAPI RP 17C 1st edition, July 1, 1991 Subsea wellhead, mudline and christmas treeAPI Spec 17D equipment1st edition, October 1992 Subsea control umbilicalsAPI Spec 17E 1st edition August 1993 Subsea control

38、 systemsDraft API Spec 17F Workover and completion riser systemsDraft API RP 17G Standardisation of ROV intervention on subseaDraft API Spec 17H equipment Umbilical installation guidelinesDraft API RP 17I Issued by: American Petroleum Institute 1220 L Street, NW WASHINGTON, DC 20005 USA. DEP 37.80.00.30-Gen. March 1994 Page 9 Last page of this DEP PDF created with pdfFactory Pro trial version