1、 Reference number ISO 1920-1:2004(E) ISO 2004 INTERNATIONAL STANDARD ISO 1920-1 First edition 2004-06-15 Testing of concrete Part 1: Sampling of fresh concrete Essais du bton Partie 1: chantillonnage du bton frais Copyright International Organization for Standardization Provided by IHS under license

2、 with ISO Licensee=Aramco HQ/9980755100 Not for Resale, 04/23/2007 03:10:24 MDTNo reproduction or networking permitted without license from IHS -,-,- ISO 1920-1:2004(E) PDF disclaimer This PDF file may contain embedded typefaces. In accordance with Adobes licensing policy, this file may be printed o

3、r viewed but shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In downloading this file, parties accept therein the responsibility of not infringing Adobes licensing policy. The ISO Central Secretariat accepts no liabili

4、ty in this area. Adobe is a trademark of Adobe Systems Incorporated. Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation parameters were optimized for printing. Every care has been taken to ensure that the file is suit

5、able for use by ISO member bodies. In the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below. ISO 2004 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any

6、 means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or ISOs member body in the country of the requester. ISO copyright office Case postale 56 CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail c

7、opyrightiso.org Web www.iso.org Published in Switzerland ii ISO 2004 All rights reserved Copyright International Organization for Standardization Provided by IHS under license with ISO Licensee=Aramco HQ/9980755100 Not for Resale, 04/23/2007 03:10:24 MDTNo reproduction or networking permitted withou

8、t license from IHS -,-,- ISO 1920-1:2004(E) ISO 2004 All rights reserved iii Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO

9、 technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates cl

10、osely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2. The main task of technical committees is to prepare International Standards. Dr

11、aft International Standards adopted by the technical committees are circulated to the member bodies for voting. Publication as an International Standard requires approval by at least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that some of the elements of this doc

12、ument may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. ISO 1920-1 was prepared by Technical Committee ISO/TC 71, Concrete, reinforced concrete and pre- stressed concrete, Subcommittee SC 1, Test methods for concrete. This first edi

13、tion of ISO 1920-1 cancels and replaces ISO 2736-1:1986, Concrete tests Test specimens Part 1: Sampling of fresh concrete. ISO 1920 consists of the following parts under the general title Testing of concrete: Part 1: Sampling of fresh concrete Part 2: Properties of fresh concrete Part 3: Making and

14、curing test specimens Part 4: Strength of hardened concrete Part 5: Properties of hardened concrete other than strength Part 6: Sampling, preparing and testing concrete cores Part 7: Non-destructive tests on hardened concrete Copyright International Organization for Standardization Provided by IHS u

15、nder license with ISO Licensee=Aramco HQ/9980755100 Not for Resale, 04/23/2007 03:10:24 MDTNo reproduction or networking permitted without license from IHS -,-,- Copyright International Organization for Standardization Provided by IHS under license with ISO Licensee=Aramco HQ/9980755100 Not for Resa

16、le, 04/23/2007 03:10:24 MDTNo reproduction or networking permitted without license from IHS -,-,- INTERNATIONAL STANDARD ISO 1920-1:2004(E) ISO 2004 All rights reserved 1 Testing of concrete Part 1: Sampling of fresh concrete WARNING When cement is mixed with water, alkali is released. When sampling

17、, prevent skin contact with wet cement or concrete by wearing suitable protective clothing (gloves, footwear, safety glasses). If wet cement or concrete enters the eye, immediately wash it out thoroughly with clean water and seek medical treatment without delay. Wash wet concrete off the skin immedi

18、ately. 1 Scope This part of ISO 1920 specifies procedures for the sampling of fresh concrete. The samples are used for the testing of properties of fresh concrete, or for making test specimens to determine the properties of hardened concrete. NOTE ISO 1920-1 specifies the properties of fresh concret

19、e and ISO 1920-3 gives the procedures for making and curing test specimens. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the refere

20、nced document (including any amendments) applies. ISO 1920-2, Testing of concrete Part 2: Properties of fresh concrete ISO 1920-3, Testing of concrete Part 3: Making and curing test specimens ISO 1920-4, Testing of concrete Part 4: Strength of hardened concrete 3 Terms and definitions For the purpos

21、e of this document, the following terms and definitions apply. 3.1 batch quantity of concrete, mixed in one cycle of operation of a batch mixer, or the quantity of concrete conveyed ready-mixed in a vehicle, or the quantity discharged over 1 min from a continuous mixer 3.2 composite sample quantity

22、of concrete consisting of a number of increments, distributed through a batch or mass of concrete, which are thoroughly mixed together 3.3 spot sample quantity of concrete taken from part of a batch or mass of concrete, consisting of one or more increments that are thoroughly mixed together Copyrigh

23、t International Organization for Standardization Provided by IHS under license with ISO Licensee=Aramco HQ/9980755100 Not for Resale, 04/23/2007 03:10:24 MDTNo reproduction or networking permitted without license from IHS -,-,- ISO 1920-1:2004(E) 2 ISO 2004 All rights reserved 3.4 increment quantity

24、 of concrete taken by the single operation of a scoop 4 Principle 4.1 Taking a composite sample Concrete is sampled from a stream of moving concrete or from a pile in a series of increments according to 6.2. These increments are then thoroughly mixed together. 4.2 Taking a spot sample Concrete is sa

25、mpled from a stream of moving concrete or from a pile at a single point. Spot samples are not representative of the batch and should not be used to manufacture strength specimens. 5 Apparatus 5.1 Scoop, made from non-absorbent material not readily attacked by cement paste, with a size suitable for t

26、aking increments of concrete. 5.2 Containers, one or more, made from non-absorbent material not readily attacked by cement paste, for receiving, transporting and remixing the concrete samples. 5.3 Thermometer (when required), to measure the temperature of fresh concrete to an accuracy of 1 C. 5.4 Mo

27、ist cloth. 6 Sampling procedure 6.1 Sampling plan Decide whether a spot sample or a composite sample is to be taken. NOTE This will depend upon the intended use of the sample. Take a sample that is at least 1,5 times the quantity estimated as being required for the test. A procedure for monitoring s

28、ampling errors is described in Annex A. 6.2 Obtaining a composite sample Ensure that the apparatus is clean and dampen it with a moist, but not wet, cloth prior to use. Using the scoop (5.1), take the required number of increments uniformly distributed throughout the batch. When sampling from a stat

29、ionary batch mixer or ready-mixed concrete truck, disregard the very first and the very last of the discharge. When sampling from a falling stream, the increments shall be taken in such a way as to represent the whole width and thickness of the stream. If the batch has been deposited in a heap of co

30、ncrete, take the increments, wherever possible, distributed through the depth of the concrete as well as over the exposed surface. Samples shall not be taken from parts of the concrete that are obviously different from the rest of the pile, such as from areas that are oversanded or stoney. Copyright

31、 International Organization for Standardization Provided by IHS under license with ISO Licensee=Aramco HQ/9980755100 Not for Resale, 04/23/2007 03:10:24 MDTNo reproduction or networking permitted without license from IHS -,-,- ISO 1920-1:2004(E) ISO 2004 All rights reserved 3 The increments shall be

32、 taken from at least three places. Deposit the increments into the container(s) (5.2). Record the date and time of sampling. 6.3 Obtaining a spot sample Ensure that the apparatus is clean and dampen it with a moist, but not wet, cloth prior to use. Using the scoop (5.1), take the increment(s) from t

33、he required part of a batch or mass of concrete. Deposit the increment(s) into the container (5.2). Record the date and time of sampling. 6.4 Transporting, handling and care of samples At all stages of sampling, transport and handling, protect the fresh concrete samples against contamination, increa

34、se or loss of moisture, excessive vibration, and against extreme variations of temperature. The properties of fresh concrete change with time after mixing, depending upon the environmental conditions. This should be taken into account in deciding when tests are carried out or specimens made. When ta

35、king the concrete from the container(s), ensure that no more than a light covering of slurry is left adhering to the container(s). 6.5 Measuring the temperature of the sample When required, measure the temperature of the concrete in the container(s) at the time of sampling. 7 Sampling report Each sa

36、mple shall be accompanied by a report from the person responsible for taking the sample. An example of a test report is given in Annex B. The report shall include a) clear identification of the sample, b) type of sample (composite or spot), c) identification of the works, d) identification of the el

37、ement(s) in the works which the sample represents, e) date and time of sampling, f) identification of the batch sampled, g) ambient temperature and weather conditions, h) name and signature of person responsible for sampling, i) temperature of the concrete sample before discharging the concrete (whe

38、n required), j) any deviations from the standard method of sampling, and k) a declaration by the person technically responsible that the sample was obtained in accordance with this International Standard, except as noted in j) above. Copyright International Organization for Standardization Provided

39、by IHS under license with ISO Licensee=Aramco HQ/9980755100 Not for Resale, 04/23/2007 03:10:24 MDTNo reproduction or networking permitted without license from IHS -,-,- ISO 1920-1:2004(E) 4 ISO 2004 All rights reserved Annex A (informative) Monitoring sampling error A.1 General This procedure may b

40、e used to assess the consistency of the sampling procedure being used by an individual (“repeatability”). Sampling error may be assessed during regular sampling from the difference in compressive strength between duplicate samples with allowance for the contribution from testing error. A.2 Procedure

41、 From each of 20 batches of concrete of the same strength class or mix, a standard sample and a duplicate sample shall be obtained using the procedure described in Clause 6. Each increment taken for the standard sample shall be followed immediately by an increment for the duplicate sample and the tw

42、o samples shall be collected in separate containers. Both the samples shall be prepared in accordance with 6.2 and pairs of test specimens shall be made from each composite sample in accordance with ISO 1920-3. All the test specimens shall be tested for compressive strength at 28 days in accordance

43、with ISO 1920-4. A.3 Calculation and reporting sampling error. For each pair of compressive strength results from the 20 standard samples, the mean, Ms, and the differences, Ds, shall be calculated. Similarly for each pair of compressive strength results from the 20 duplicate samples, the mean, Md,

44、and the differences, Dd, shall be calculated. Record each calculation of the mean to the nearest 0,25 MPa. Calculations shall be based on the following formulae. a) Testing variation, Vt 22 sd t 80 DD V + = b) Testing plus sampling variance, Vts 2 sd ts () 40 MM V = c) Mean strength, M sd 40 MM M +

45、= d) Sampling error (in percent), Es tst s 100(0,5)VV E M = Copyright International Organization for Standardization Provided by IHS under license with ISO Licensee=Aramco HQ/9980755100 Not for Resale, 04/23/2007 03:10:24 MDTNo reproduction or networking permitted without license from IHS -,-,- ISO

46、1920-1:2004(E) ISO 2004 All rights reserved 5 e) Testing error (in percent), Et t t 100 V E M = Report the sampling error and testing error to the nearest 0,1 %. A.4 Assessment If the estimate of the sampling error is greater than 3 %, then the sampling procedure shall be reviewed. If the estimate o

47、f the testing error is above 3 %, then the testing procedure shall be reviewed. If both estimates are not more than 3 % , the sampling procedure may be assumed to be satisfactory. Copyright International Organization for Standardization Provided by IHS under license with ISO Licensee=Aramco HQ/99807

48、55100 Not for Resale, 04/23/2007 03:10:24 MDTNo reproduction or networking permitted without license from IHS -,-,- ISO 1920-1:2004(E) 6 ISO 2004 All rights reserved Annex B (informative) Example of sampling report Client Test organization Accreditation test report ref. Sampling location Weather conditions: _ Sample Sample