1、 Tentative Interim Amendment NFPA 68 Standard on Explosion Protection by Deflagration Venting 2007 Edition Reference: Various Sections TIA 07-1 (SC 08-10-2/TIA Log #928) Pursuant to Section 5 of the NFPA Regulations Governing Committee Projects, the National Fire Protection Association has issued th

2、e following Tentative Interim Amendment to NFPA 68, Standard on Explosion Protection by Deflagration Venting, 2007 edition. The TIA was processed by the Technical Committee on Explosion Protection Systems, and was issued by the Standards Council on October 28, 2008, with an effective date of Novembe

3、r 17, 2008. A Tentative Interim Amendment is tentative because it has not been processed through the entire standards- making procedures. It is interim because it is effective only between editions of the standard. A TIA automatically becomes a proposal of the proponent for the next edition of the s

4、tandard; as such, it then is subject to all of the procedures of the standards-making process. 1. In equations 7.2.2.6, 7.3.3.7, and 8.2.8 the terms V and Pred are in the numerator and need to be moved to the denominator as shown in the revised equations below: = 2 . 03 . 0 5 . 06 . 0 )0075. 0( red

5、G vi PVn KM AA 7.2.2.6 = 2 . 03 . 0 5 . 06 . 0 )0075. 0( red G vi PVn KM AA 7.3.3.7 += 2 . 03 . 0 5 . 06 . 0 23 )0075. 0( 1 red st vv PVn KM AA 8.2.8 2. In 8.2.8 revise the text to read as shown: “If M MT, the vent area shall be increased by adding the calculated area, Av3, from Equation 8.2.8:” “Fo

6、r M MT, the required vent area, Av3 , shall be calculated as follows:” 3. In 8.2.7.1, revise the text to read as shown: Copyright National Fire Protection Association Provided by IHS under license with NFPALicensee=Boeing Co/5910770001 Not for Resale, 01/31/2009 20:30:32 MSTNo reproduction or networ

7、king permitted without license from IHS -,-,- 8.2.7.1 When the mass of the vent panel is less than or equal to 40 kg/m2 and KSt is less than or equal to 250 bar-m/sec, Equation 8.2.7.2 shall be used to determine whether an incremental increase in vent area is needed and the requirements of 8.2.8 sha

8、ll be used to determine the value of that increase. 4. In 8.2.7.2, revise the conditions for Equation 8.2.7.2 by deleting the condition for KSt: where: MT = threshold mass (kg/m2) Pred = bar n = number of panels V = volume (m3) KSt 250 bar-m/sec 5. In A.8.2.7 revise the text as follows: A.8.2.7 Wher

9、e M is greater than 40 kg/m2 or KSt 250 bar-m/sec, see Annex G for guidance. 6. Add a new 8.2.7.3 as follows: 8.2.7.3 Where M is greater than 40 kg/m2, it shall be permitted to use the procedure provided in Annex G. 7. In 7.3.3.6.1, revise the text to read as shown: 7.3.3.6.1 When the mass of the ve

10、nt panel is less than or equal to 40 kg/m2 and KG is less than or equal to 130 bar-m/sec, Equation 7.3.3.6.2 shall be used to determine whether an incremental increase in vent area is needed and the requirements of 7.3.3.7 shall be used to determine the value of that increase. 8. In 7.3.3.6.2, revis

11、e the conditions for Equation 7.3.3.6.2 by deleting the condition for KG: where: MT = threshold mass (kg/m2) Pred = bar n = number of panels V 1m3 KG 130 9. In A.7.3.3.6.2 revise the text as shown: A.7.3.3.6.2 Where M is greater than 40 kg/m2 or KG is greater than 130 bar-m/sec, it is necessary to p

12、erform testing or apply alternative explosion protection methods per NFPA 69, Standard on Explosion Prevention Systems. 10. Revise the entries in Table 8.5.10 as shown in the text and table below: For the “Vent ducts” model, the application statement on panel density shall read “Panel Density 40 kg/

13、m2”. For the “Panel inertia” model, the application statement “No vent duct” shall be deleted. Copyright National Fire Protection Association Provided by IHS under license with NFPALicensee=Boeing Co/5910770001 Not for Resale, 01/31/2009 20:30:32 MSTNo reproduction or networking permitted without li

14、cense from IHS -,-,- 11. Revise 6.8.2 as shown and add the reference to the paper by Hey, “Pressure relief of dust explosions through large diameter ducts and effect of changing the position of the ignition source”, J. Loss Prev. Process Ind., 1991, Vol 4, July, pg 217. : 6.8.2A vent duct shall have

15、 a cross sectional area at least as great as that of the vent itself but shall be limited to no more than 150% of the vent itself at any point in the vent duct. Hey 12. Revise 8.7.1(3) as follows: (3) Locate the vents such that the bottom of the vent(s) is at or above below the bottom of the bags, a

16、s shown in Figure 8.7.1 (e), and the row of bags closest to the vent are restrained from passing through the vent. For this case, the volume used to calculate the vent area shall be the entire volume (clean and dirty) below the tube sheet. 13. Keep the current Figure 8.7.1 (e) and add this second dr

17、awing as part of the same figure with the current drawing on the left side and this drawing adjacent on the right: Copyright National Fire Protection Association Provided by IHS under license with NFPALicensee=Boeing Co/5910770001 Not for Resale, 01/31/2009 20:30:32 MSTNo reproduction or networking

18、permitted without license from IHS -,-,- 14. In equation 7.3.3.2, the constant to be subtracted from Pstat should be 0.1 bar. 15. Revise 8.7.1(2) as follows: (2) Locate the vents as shown in Figure 8.7.1(c) and Figure 8.7.1(d), and bags are either completely removed or shortened so that they do not

19、extend below the top of the vent for a distance of one vent diameter from the vent. In addition, the bags immediately adjacent to the vent shall be removed and the remaining bags the bags which extend below the top of the vent shall be verified by test to be rigid enough to remain in place during ve

20、nting, or shall be restrained from passing through the vent. For this case, the vent area shall be permitted to be calculated on the basis of the dirty side only; that is, calculate the volume below the tube sheet, and subtract out the volume occupied by the bags. Issue Date: October 28, 2008 Effect

21、ive Date: November 17, 2008 (Note: For further information on NFPA Codes and Standards, please see www.nfpa.org/codelist) Copyright 2008 All Rights Reserved NATIONAL FIRE PROTECTION ASSOCIATION Copyright National Fire Protection Association Provided by IHS under license with NFPALicensee=Boeing Co/5910770001 Not for Resale, 01/31/2009 20:30:32 MSTNo reproduction or networking permitted without license from IHS -,-,-