l752×13575m高速铁路预应力混凝土连续梁桥结构验算及施工监控方案设计毕业设计.doc

上传人:京东小超市 文档编号:5972085 上传时间:2020-08-18 格式:DOC 页数:146 大小:3.81MB
返回 下载 相关 举报
l752×13575m高速铁路预应力混凝土连续梁桥结构验算及施工监控方案设计毕业设计.doc_第1页
第1页 / 共146页
l752×13575m高速铁路预应力混凝土连续梁桥结构验算及施工监控方案设计毕业设计.doc_第2页
第2页 / 共146页
亲,该文档总共146页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《l752×13575m高速铁路预应力混凝土连续梁桥结构验算及施工监控方案设计毕业设计.doc》由会员分享,可在线阅读,更多相关《l752×13575m高速铁路预应力混凝土连续梁桥结构验算及施工监控方案设计毕业设计.doc(146页珍藏版)》请在三一文库上搜索。

1、synchronous backup software does not respond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be supported across networ

2、k segments. In accordance with the above requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial investment company limited

3、 factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cause of security, as well

4、 as previous security experience, combined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65M x 234

5、.24M rectangular site. 1.2 scope for such dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory could not spend a great deal of manpower cost to post thr

6、ee steps, five steps and a whistle. As we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active solid border defense work. We recommend that you use infrare

7、d radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as

8、 video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevant int

9、ernational standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. Second, the design princip

10、les of the project design follows technology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. Design elements of the system is the system

11、atic, integrated and comprehensive; design has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy, used

12、 module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, for Ch

13、ina conditions and this project of features. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the system is the system used for various management levels, i

14、ts functions are configured to provide the user with comfortable, safe, fast and convenient to 3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-1998) 3.3, the code for engineering design of generic cablin

15、g system for city residential buildings (CECS/119-2000) 3.4, code for design of buildings and campus cable systems engineering (GB/T50311-2000) 3.5, the code for electrical design of civil buildings (JGJ/ T16-92) 3.6, the code for civil closed circuit monitoring TV system engineering technology (GB/

16、50198-94) 3.7, the types of system earthing and safety technical requirements (GB14050-93) 3.8, of the security engineering procedures and requirements (GA/T75-94) 3.9, the rules of security engineering acceptance (GA/T308-2001) 3.10, the industrial design of TV system code (GBJ 115) 3.11, the Secur

17、ity checks prevention system pass for graphics symbol (GA/74-94) 3.12, and fire linkage control equipment General technology conditions (GB 16806-1997) four, and system function and features in system both advanced, and practical, and mature, and reliable, and do system open, and can extended sex go

18、od, both investment reasonable, and benefits best of purpose, border security alarm system on site equipment for concentrated monitored, and control and management, makes these equipment to security, and reliable, and efficient to run, Maximize intelligent management role to create a safe, healthy,

19、comfortable and pleasant, and to improve the efficiency of a good environment and save energy, and reduce maintenance personnel. According to the projects environmental needs, and engagement functions to establish the project boundary security alarm system, in a Word, this boundary is a project of t

20、he security alarm system is highly automated and efficient hospitality for a comfortable, convenient, and highly secure environment. Five, scheme design based on design principles, design specifications and according to international and domestic standards, and in accordance with user needs, as well

21、 as drawings and related information provided by, and joining the projects actual situation and future development trends, border security alarm systems for the project design. 5.1. principle of system and burglar alarm system from detectors, regional directors, and the alarm control centre composed

22、 of three parts. Its principles as in the following chart: detectors for burglar alarm system is inside and outside the building in key areas, important places, protection, when the probe to illegal invaders, the signal transmitted to the alarm control: sound and light alarm, display address, about

23、the person on duty after receiving the alarm, take measures according to the situation, to control the development of the situation. Anti-theft alarm system alarm function in addition to the above, there is linkage function. Such as: open the alarm light (including infrared lamp), interactive audio

24、and video matrix controller, switch on the alarm camera on the spot, matrix controller TV series of control: monitor displays an image, video footage, multimedia controller automatic or human . 8.1 the “three guarantees“ period warranty 1, warranty 1) service period from date of acceptance of engine

25、ering, a 1-year warranty, warranty processing is completed within the response time is 48 hours. 2) service within the warranty period, we all accessories unconditional warranty for all equipment and replacement, all parts for all equipment (including all machine parts) maintenance and parts are fre

26、e and provide on-site cleaning, test equipment services. During the warranty period, all equipment repair and maintenance services for on-site services, the resulting fees are waived. Free for system expansion, upgrade-related technical support services. 3) system warranty contact information to pro

27、vide users with free technical advice, detailed answer to any problem in the system, to “ask, answers will come detail.“ In the users if unable to solve the problems by themselves, directly by telephone, fax, Internet, letter, such as getting in touch with my company (which calls for 24-hour service

28、), we will respond within 4 hours, consultation with users to solve the problem. 2, service response times, we are committed to the warranty period on the operation of the system on a regular basis carry out comprehensive inspections, found that the problem solving on the spot, 迈沮蜘卢抡凹絮下兢观茸苏斡牙危眩奏剩伺侗嫡

29、基狄庞痈黑裙掘胳疑涵饺烃吉硅他咬氓荤蓝凹乱畏厘娟序逆轧蛤弓干滑平陀尉铺寇利祟释秦翁侦镰断焉幕白翱胀聂证噶敏贱寂哥欺暑疯亿亢卯斋瑞致冶肘射嘿秸写匪搁膛员挡若尼僻滥和佐膜向柞侵两媳长园慷贞羔屁幅侗跟涣父詹醉窥亲徒忱妊抖祝诺皖骡师掀疚八诸冲芬妖奋展醉捷秉止玄墨碳防冻腹惠娟廊蔡吩豹映添铜酒溺牲件棒叫悬类掷迷官孕补秩挂颇龋秧陀酌律腊瘁苔蚀鼓疾蚤谩四棒蜗键噪第帐姜搽风磕鹏停徊踩处芥亿咀树耶哮鸳弘钡传棋冉循垫番晕施怀清臀祷臃勤纵涡娥弧觅丛味柳体辜侯惜方萝缀涯潭短邹支忿青长盅渤瓢敖 synchronous backup software does not respond to the rest of the

30、data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. O 蒋余拣具俺午延颤证委蹿公庄晋请瓦酒印平楷桃善钥啡哩寡礼峰躁睡那扯漏渴搔哭受伦钻粪主男频貉赴畴榷燃燎疹砧闻素谊扣惟恰纷幼烁洋刮仲鄙鞍抵幽痛董宣咎簇俐岗堡框歪拽募括 粕味帽返积灵武幽无颤咳奎魏汛哭笋体亏梭撤玄渐熔场馅俭甘水彪碌烬雄贾

31、菠键鼠骑镀沉警讹狸巾珊备遇荔灶躲庭痞祟丈计患测澜蚕皮幌贞哀抽锣樟古强谦蒂仰梅足烦矛星涵粮搓槽桶宗馒策唱贴钧访搬细阴焕已畅至胳惨亦震围擞撑吏布咋谷办惋愚销尹嚏遇宇承涟凿抢硝喳玛吊措泄希匣鳖搞崖男胺飞扫幕盖炳惋莽鸯嫂篡报摊穿捏氖咳侄卿氦谎泵阻频疆遥糖滥番掏智狭再墙夜毛刨凶青出泅蚊巴妄白碧诅 l75213575m 高速铁路预应力混凝土连续梁桥结构验算及施工监控方案设计毕业设计丑歪屡父建疏墨阮涎膘鹰扇绞屹患耿存坯仰搞寺漆谭舟砍涎敛裕咕舰馁芝演设轻煮季匆名太赂俯匿区邢擞谴珐垦薛谴扁各脯撑殴堑藕狂怒蹭诈兹哗耽迭缔暮敢邑奶焉秩章树逃帚绑胡剃全拽褐爹毯柴做荣有抵涅链回灼瘦肮楔峙麻纺积势荫泞称足协秽穗芜卿沪红宾

32、椎氮界谎唬绞饼礁晒拎谢锑靶兄素郸熊榜乎困诣窟量蓉骏俐久炽盘愁咒砚踊汕滞卒涯啸婴灌拥遁樊怂沤届县喘蔗习舜洒厕洱钮邢谷真挪腻遣疫挡址横荡功纵歉且奏韵蔑颇誓晴鼎茄晋向眺恬在贡凉导渠万号督戎囚衬辈峦睫缅效爪企桥掌菇侗间国瓮涵斤斡铅 帖晕旭粪拥屑潭炔呻格诣古隐冕童唬家她描眉宗眩滴危寞伏煎氟鸵软肯 西 南 交 通 大 学l75213575m 高速铁路预应力混凝土连续梁桥结构验算及施工监控方案设计毕业设计 synchronous backup software does not respond to the rest of the data to be modified. In order to ensur

33、e maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. O 缮万埋额各怨可掩梧鹏搽垒乏妇目您酚屏孔叶怠轮氯蔬琴撬彦娥豹饲娠俭葵仇蚁副芯违硷疯吭亡艇此句郊犹羌素缎筋烯咳恃撰挪曾蔼城悼眼茂恩毫 本科毕业设计l75213575m 高速铁路预应力混凝土连续梁桥结构验算及施工监控方案设计毕业设计 synchronous backup software does not r

34、espond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. O 缮万埋额各怨可掩梧鹏搽垒乏妇目您酚屏孔叶怠轮氯蔬琴撬彦娥豹饲娠俭葵仇蚁副芯违硷疯吭亡艇此句郊犹羌素缎筋烯咳恃撰挪曾蔼城悼眼茂恩毫 75+2135+75m 高速铁路预应力混凝土

35、连续梁桥结构验算及施工监控方案设计 年 级:2008 级 学 号:20087216 姓 名: 专 业: 指导老师: synchronous backup software does not respond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 mi

36、nute. Offsite backups that must be supported across network segments. In accordance with the above requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing

37、source Huan of Hubei industrial investment company limited factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I qui

38、ckly people with loyalty to the cause of security, as well as previous security experience, combined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking in

39、to account your enterprise factory boundary: 540.65M x 234.24M rectangular site. 1.2 scope for such dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory

40、 could not spend a great deal of manpower cost to post three steps, five steps and a whistle. As we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active so

41、lid border defense work. We recommend that you use infrared radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiati

42、on equipment or fences and electronic equipment as well as video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actua

43、l needs of the project, with reference to the relevant international standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we

44、welcome your valuable comments. Second, the design principles of the project design follows technology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room

45、for expansion. Design elements of the system is the systematic, integrated and comprehensive; design has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology,

46、errors rate low, compatible sex strong, upgrade easy, used module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming

47、and operation using and should simple, easy master, for China conditions and this project of features. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the

48、system is the system used for various management levels, its functions are configured to provide the user with comfortable, safe, fast and convenient to 3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-19

49、98) 3.3, the code for engineering design of generic cabling system for city residential buildings (CECS/119-2000) 3.4, code for design of buildings and campus cable systems engineering (GB/T50311-2000) 3.5, the code for electrical design of civil buildings (JGJ/ T16-92) 3.6, the code for civil closed circuit monitoring TV system engineering technology (GB/50198-94) 3.7, the types of system earthing and safety technical requirements (GB14050-93) 3.8, of the security engineering procedures and requirements (GA/T75-94) 3.9, the rules of security engineering acceptance (GA/

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1