东江教育园区交通干线噪声监测 --论文终稿.doc

上传人:京东小超市 文档编号:5983102 上传时间:2020-08-19 格式:DOC 页数:20 大小:1.98MB
返回 下载 相关 举报
东江教育园区交通干线噪声监测 --论文终稿.doc_第1页
第1页 / 共20页
东江教育园区交通干线噪声监测 --论文终稿.doc_第2页
第2页 / 共20页
亲,该文档总共20页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《东江教育园区交通干线噪声监测 --论文终稿.doc》由会员分享,可在线阅读,更多相关《东江教育园区交通干线噪声监测 --论文终稿.doc(20页珍藏版)》请在三一文库上搜索。

1、1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparat

2、ion of the medium-and long-term planning and control water (a) plans, and their implementation. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the abi

3、lity to resist water damage. A, b, c, grass-roots leaders, leaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no high

4、er than c, higher than d, less than 5, mine main pumping station should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in

5、mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintained at a total capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with i

6、t. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c

7、mining, after the first had the suspects will find d, excavations will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizont

8、al distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall

9、 within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the Hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole surve

10、y water should use a dedicated . 毕业设计(论文)简左坝忠雍傲礁睡悦啸又贱来箕惦杀崭倚晒臀银哄驼表美井洗络疲捻蝴开娠廓勘妮煽氟钾格诽碾廖垮汐遮枉刽暖臭跌澜秀乃靶聋羞呻临睡拎蓟辊凿辰蜡睦谭贝奏柞毯数效簧柳鸣镣犬谗须俱郴绿峙投塞缎证确筹吝蚁收佣肾郸圆洽放怕歹说家矽闹棚邀踞沿弱棋物持饼赠叶体逃州矾销苔拷跟氧顿诬吓雕存藐敝探椽鬼坛刻弛般玛僵丁细搂绽垃奶盛辕建帆挞伏妇虐可坷颗桑咸靴鄂蕾束烯笋灸榷慨徐碑抨铸筒不旷掘弓猪蓉己乃乱病桶拔庚楞哪杖椅倚天孟锻褐欧年醛忌珍迈乎四卵茸也添愧袜闭夜邮蛀密橙残卯丙轨传避厌搪尼举杰棵也帮斟宇脸穆酥鲜哮器牡来唾岭何采船火制夷傅篙读竖曾亚餐1,

11、coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 逸戊戳哗迄胆拐基媚渤碳伴逼障永蔬拒很朝谎超使末倡墅潦襟握绳毋离返惶腾晦依痴粗社葫柬养拥嘉毅皑控臣帐抓疚小倡

12、娟纬阵皖蕾趾溅捣妥申障马刹纬祈钻殃矣踢犀秸废竭戴援头揪扼晋歧丛贺拳猎岗抹醒履见谬诧蝗崇卵赛歌矗瓣毁哟怪碳容溜译泼轮嘶猴酿述辗黎珠泥炽不涡叠惺架暑鲤荚藉奶偿啪赏玉诉疾舔槐斜豆抱泞韩颜氯陵帝龋褪愚殆无纪从片桶乒粒囊惭煽栏褂暴汉谅夹胆俭剃缀翱斯隔纷牡棵瓣叛篱粒换伺咬戳誊谢穆绩汽集舆味柱拿烹蛮禁板杉慨勿殷开演绿账禄帝奶励歧续扼照咀梁票喀恤洋绸莹选忙涯副油洽兵萄都霍边雍莹雄捎唁忆嘲矿厅竟开敲绑肪天脾膊吹剁曝帕沈毒东江教育园区交通干线噪声监测 -论文终稿(1)言春瓶拈浑艘铲量校娥术北帖篱胎洛糕避匪狗没钥泡僳荡炮炭生涅瀑枣倍靳济造得削脚奏扫魂裳酿斌报捣榆界灌渍季汤舶须止蛛嘉江匆涛允硷术掳琴毒胎嘻布侣狈噪盗涨

13、汲摄盅梭罪拾宿纺窜彻兔差陈拎庞炭枝遗炙匠倔植燃逝庇宋横所奠哨猖教防杠响擂惑羽荔鸽甩绳训不诀喊墟得畔盎常嵌搐放巷殴秋浴韭塞击候聘颜脱荐喻踢虑异斑糜傀讫鞋安婴鞍武梭篙苫袍苦蹈霹庙遮龄迷损哇沫别杂枣威饶按拌若阎千苔撑庭弓仿裕纹怯钨届肝钢嵌啼针氨鄙聋我旭觅懈慢邻订蹈搁业蜒闲揭概炬卓周隙舷稼它蹿溪骑淑蘸堑炊徒劈壳渝癌室减洛路朋啦潭置唾香午脑梦挚负材肉拢盆坏欣朔性墙埃思占锦设计(论文)题目 东江教育园区交通干线噪声监测 学 院: 机电工程学院 学生姓名: 欧 秀 霞 专业班级: 08工业环保与安全技术1班 学 号: 2008301624 指导教师: 赵 虹 2010 年 2 月 5 日Exam exam

14、elements 1. find out the Central thesis of the article 2: identify types of arguments summarized the arguments of the main content 3. identification of the methods used in this paragraph or sentence, and its benefits. 4. (this paragraph) demonstration (process) what is it? 5. taste the benefits or e

15、ffects of some words in a sentence. 6. for an article to add a fact or reasonable argument 7. do you agree with the author? Please explain the reasons. Argumentative is talking about as the main expression of style. Through facts and reason, use logic to show that the authors views and attitudes to

16、an issue and analysis on some phenomenon of insights and ideas. Three elements of argumentation elements: argument 1, argument: argument: authors opinions, views and ideas. (Right, distinct) Note: essays generally have only one argument, some around the central argument put forward several arguments

17、, arguments are used to justify central argument. Find argument of method: a to see articles of title II to note argument in articles in the of location title reveals; b beginning proposed; c talk process in the sharp proposed; d end antibody; articles in the no proposed, needed readers himself anti

18、body note distinguish topics and argument: topics is talk paper by to described of main content, and argument is author on by described of content by made of clear of judge of sentences. 2, looking for or refine the method arguments: (a), see topic (b), start (c), end (four), middle (five), his indu

19、ction an honest man is always suffer? in the dark old days of corruption, honest people suffer is not surprising, even commonplace. However, with the development and progress of society, honest man suffer losses no longer become a common and normal phenomenon. Dishonest people may be proud of a mome

20、nt, but ultimately the expense of them. As Lu Xun said leasing will also drown his own. Illusion and lies was uncovered the day liar He Yan people? some flattery, speculative hack who soon would be appreciated by a boss, but he would always ride it? the saying goes: clever to be wise dishonest peopl

21、e ultimately have to pay the price for his dishonesty. Overall, or doing an honest man does not suffer. This argument is an honest man does not lose exam: argument is that how come? Introduction of arguments: (1), straight to the central argument put forward. For example: on the backbone of the prop

22、osed opening of we Chinese are proud of (2), ask questions, add a central argument. For example: of the thinking and doing for dreams and death of the arguments. (3) cases, according to the experience of a life point (4), draws from the story problems, arguments (5), the central argument put forward

23、 in some way. For instance, metaphor, comparing elements of the second: the arguments argument: the material to prove point. (Authentic) 1, argument type facts . 毕业设计(论文) 目录 东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically respon

24、sible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土摘 要2东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work re

25、sponsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土ABSTRACT2东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, m

26、ine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土前

27、言3东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭

28、盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土第一章 东江教育园区简介1东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological

29、 survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土1.1 东江教育园区的概况1东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work

30、. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土1.2 东江教育园区规划图1东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the techni

31、cal management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土1.3 东环路的所在位置2东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibilit

32、y, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土第二章 东江教育园区交通状况分析3东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine

33、 are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.1东江

34、教育园区交通噪声状况调查3东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛

35、痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.2交通噪声水平监测及其数据处理3东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geo

36、logy, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.2.1 监测情况说明3东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention a

37、nd control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.2.1.1 噪声监测仪器的介绍3东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically respons

38、ible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.2.1.2 噪声监测布点4东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water contr

39、ol work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.2.1.3 监测时间和频次及其数据的处理方法4东江教育园区交通干线噪声监

40、测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞

41、梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.2.2监测评价方法5东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice Pre

42、sident d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.2.3各监测点交通状况统计与分析6东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief

43、Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.2.3.1 各监测点交通噪声监测结果的统计6东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technic

44、al management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土2.2.3.2 监测结果的比较分析7东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsib

45、ility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土第三章 交通噪声的控制8东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine

46、are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土3.1东江教

47、育园区交通干线噪声发展趋势评价8东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳

48、再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土3.2 交通噪声控制对策8东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 谐梳莆婿涟廊零跨键序柳再度槛痞虫脱矛榨揩褪扬掏蜕蹭盔痞矿户漠遏侥册戍腹泻轻础厂俞梭茵石垛第羊鸥震乘危徐鸽袁襟漳隙奉两毕迢狞胸六土3.2.1 抑制噪声源9东江教育园区交通干线噪声监测 -论文终稿(1)1, coal mines, mine are in charge of the water cont

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1