最新2013新版PEP新目标七年级下册英语unit_1-12单元全册知识点归纳与复习教案名师优秀教案.doc

上传人:小红帽 文档编号:1363630 上传时间:2018-12-15 格式:DOC 页数:93 大小:280KB
返回 下载 相关 举报
最新2013新版PEP新目标七年级下册英语unit_1-12单元全册知识点归纳与复习教案名师优秀教案.doc_第1页
第1页 / 共93页
最新2013新版PEP新目标七年级下册英语unit_1-12单元全册知识点归纳与复习教案名师优秀教案.doc_第2页
第2页 / 共93页
最新2013新版PEP新目标七年级下册英语unit_1-12单元全册知识点归纳与复习教案名师优秀教案.doc_第3页
第3页 / 共93页
亲,该文档总共93页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《最新2013新版PEP新目标七年级下册英语unit_1-12单元全册知识点归纳与复习教案名师优秀教案.doc》由会员分享,可在线阅读,更多相关《最新2013新版PEP新目标七年级下册英语unit_1-12单元全册知识点归纳与复习教案名师优秀教案.doc(93页珍藏版)》请在三一文库上搜索。

1、2013新版PEP新目标七年级下册英语unit_1-12单元全册知识点归纳与复习教案temporary electricity security construction organization design; large mechanical of loaded, and split construction programme; labour protection technology measures requirements, and plans; dangerous parts and way process, especially construction risk degree

2、 larger project should for technology argument, take corresponding of security technology measures; on special process and the new process, and equipment, and facilities, and material of using, should targeted of special security requirements and operation provides; Divide key positions in a constru

3、ction site fire and flammability, fire equipment and facility configurations, welding approval, fire inspection, duty Firemans activities, must devise appropriate systems and measures should also have safety signs at construction site layout master plan. These types of technical measures and require

4、ments subject to the superior technical Department for approval, Chief supervision engineer to review implementation. In order to ensure the implementation of safety measures, should be organized to staff resources for implementation. Note: before the project began, head of engineering to engineerin

5、g, construction, safety technical measures to ensure responsible foreman detailed low-down; foreman responsibility according to the technical managers cards on the table for the Division in charge of the foreman gives the low-down. ? safe disclosure by the General, heads of sub and security responsi

6、bility of people to participate in, the two sides signed. Total disclosure must be in for supplementary cards on construction feature of the project. ? the type operators for safe operation of the sub-item project technology gives the low-down, branches, can refer to industry standard of safety mana

7、gement model (the Guide to standardization in Chengdu city construction site to create). ? foremen on construction jobs in the process of releasing production tasks at the same time, the need for security disclosure. ? production assurance system approval requirements in accordance with fire safety

8、provisions of that document. Scaffolding safety technology to give the low-down on 4-2 construction organization name project name construction Note: before the project began, head of engineering to engineering, construction, safety technical measures to ensure responsible foreman detailed low-down;

9、 foreman responsibility according to the technical managers cards on the table for the Division in charge of the foreman gives the low-down. ? safe disclosure by the General, heads of sub and security responsibility of people to participate in, the two sides signed. Total disclosure must be in for s

10、upplementary cards on construction feature of the project. ? the type operators for safe operation of the sub-item project technology gives the low-down, branches, can refer to industry standard of safety management model (the Guide to standardization in Chengdu city construction site复习教案Unit 1 Can

11、you play the guitar ? 1、can+动词原形,它不随主语和数而变化。 (1)含有can的肯定句:主语+can+谓语动词的原形+其他。 (2)变一般疑问句时,把can提前:Can+主语+动词原形+其他, 肯定回答:Yes,主语+can。否定回答:No,主语+cant. (3)含有can的否定句:主语+cant+动词的原形+其他。 (4)含有can的特殊疑问句:特殊疑问词+can+主语+动词原形+其他, 2、may+动词的原形。(may为情态动词)一般疑问句是把may提前, 肯定回答是:Yes,主语 +may。否定回答是:No,主语+mustnt。或please dont。 j

12、oin+某个组织,俱乐部,party,参军,党派等 “加入” Join sb. “参加到某人中” join in (doing)sth “加入做.,参加某个活动” Join in=take part in +活动,比赛 3、说某种语言:speak+语言 4、play+球、棋、牌;play+the+乐器。 5、擅长于(做)什么:be good at +名词/动ing 6、帮助某人做某事:help sb. (to ) do sth. help sb. with sth. 7、我能知道你名字吗,May I know your name? 8、想要做什么:want to do sth 例如:I wan

13、t to learn about art. 9、What club do you want to join? I want to join the chess club and the basketball club. 10、What club does Tom want to join? He wants to join the swimming club . 11、He cant play the violin or the piano. Can you help kids with swimming? 12、Why do you want to join the English club

14、? Because I want to learn English well. Unit 2 What time do you go to school ? 1、what time和when引导的特殊疑问句。 (1)对时间提问用what time,也可以用when。询问钟点时用what time,询问日期、月份、年份时用when。 (2)询问做某事的时间时,两者可以互换。 (3)其他询问时间的句子: Whats the time? =What time is it?现在几点了, 时刻表达法:顺读法和逆读法。 (1)顺读法:“钟点+分钟”直接读数字。 (2)逆读法:借助介词past或to表示,要

15、先说分再说钟点。 temporary electricity security construction organization design; large mechanical of loaded, and split construction programme; labour protection technology measures requirements, and plans; dangerous parts and way process, especially construction risk degree larger project should for techno

16、logy argument, take corresponding of security technology measures; on special process and the new process, and equipment, and facilities, and material of using, should targeted of special security requirements and operation provides; Divide key positions in a construction site fire and flammability,

17、 fire equipment and facility configurations, welding approval, fire inspection, duty Firemans activities, must devise appropriate systems and measures should also have safety signs at construction site layout master plan. These types of technical measures and requirements subject to the superior tec

18、hnical Department for approval, Chief supervision engineer to review implementation. In order to ensure the implementation of safety measures, should be organized to staff resources for implementation. Note: before the project began, head of engineering to engineering, construction, safety technical

19、 measures to ensure responsible foreman detailed low-down; foreman responsibility according to the technical managers cards on the table for the Division in charge of the foreman gives the low-down. ? safe disclosure by the General, heads of sub and security responsibility of people to participate i

20、n, the two sides signed. Total disclosure must be in for supplementary cards on construction feature of the project. ? the type operators for safe operation of the sub-item project technology gives the low-down, branches, can refer to industry standard of safety management model (the Guide to standa

21、rdization in Chengdu city construction site to create). ? foremen on construction jobs in the process of releasing production tasks at the same time, the need for security disclosure. ? production assurance system approval requirements in accordance with fire safety provisions of that document. Scaf

22、folding safety technology to give the low-down on 4-2 construction organization name project name construction Note: before the project began, head of engineering to engineering, construction, safety technical measures to ensure responsible foreman detailed low-down; foreman responsibility according

23、 to the technical managers cards on the table for the Division in charge of the foreman gives the low-down. ? safe disclosure by the General, heads of sub and security responsibility of people to participate in, the two sides signed. Total disclosure must be in for supplementary cards on constructio

24、n feature of the project. ? the type operators for safe operation of the sub-item project technology gives the low-down, branches, can refer to industry standard of safety management model (the Guide to standardization in Chengdu city construction sitetemporary electricity security construction orga

25、nization design; large mechanical of loaded, and split construction programme; labour protection technology measures requirements, and plans; dangerous parts and way process, especially construction risk degree larger project should for technology argument, take corresponding of security technology

26、measures; on special process and the new process, and equipment, and facilities, and material of using, should targeted of special security requirements and operation provides; Divide key positions in a construction site fire and flammability, fire equipment and facility configurations, welding appr

27、oval, fire inspection, duty Firemans activities, must devise appropriate systems and measures should also have safety signs at construction site layout master plan. These types of technical measures and requirements subject to the superior technical Department for approval, Chief supervision enginee

28、r to review implementation. In order to ensure the implementation of safety measures, should be organized to staff resources for implementation. Note: before the project began, head of engineering to engineering, construction, safety technical measures to ensure responsible foreman detailed low-down

29、; foreman responsibility according to the technical managers cards on the table for the Division in charge of the foreman gives the low-down. ? safe disclosure by the General, heads of sub and security responsibility of people to participate in, the two sides signed. Total disclosure must be in for

30、supplementary cards on construction feature of the project. ? the type operators for safe operation of the sub-item project technology gives the low-down, branches, can refer to industry standard of safety management model (the Guide to standardization in Chengdu city construction site to create). ?

31、 foremen on construction jobs in the process of releasing production tasks at the same time, the need for security disclosure. ? production assurance system approval requirements in accordance with fire safety provisions of that document. Scaffolding safety technology to give the low-down on 4-2 con

32、struction organization name project name construction Note: before the project began, head of engineering to engineering, construction, safety technical measures to ensure responsible foreman detailed low-down; foreman responsibility according to the technical managers cards on the table for the Div

33、ision in charge of the foreman gives the low-down. ? safe disclosure by the General, heads of sub and security responsibility of people to participate in, the two sides signed. Total disclosure must be in for supplementary cards on construction feature of the project. ? the type operators for safe o

34、peration of the sub-item project technology gives the low-down, branches, can refer to industry standard of safety management model (the Guide to standardization in Chengdu city construction siteA.当分钟不超过30分钟时(包括30分钟),即30,用to表示。其结构为:“所差分钟(即60所 过分钟数)+to+下一个整点”,to译成“差”,差几分钟到几点。 C.当分钟为30分钟用half表示,当分钟为15

35、分钟用a quarter。 2、always 总是usually 通常often常常sometime 有时 3、Watch+TV、球赛 “观看,观赏”,特指长时间注视。 See+电影、医生 “看见”,强调看的结果。 Look “看”,强调看的动作,look后接宾语时要用介词at。 Read+书刊、杂志 “阅读” 4、listen to +宾语 6、Take a shower “淋浴” 7、Eat breakfast 吃早餐 5、Go to +地点名词 如:go to school go+地点副词 如:go home Unit 3 How do you get to school? 一、本单元知

36、识点总结 1.get to school 到校 2.take the subway 乘地铁 3.take the train 坐火车 4.leave for 到地方去,离开去某地 5.taketo把带到 6. most students 大多数学生 7. fromto从到 8.think of 想到,想起 9.ride bikes 骑自行车 10.in other parts of the world 在世界的其他地方 11. how far 多远 (路程、距离) 12.how long多长(时间) 13.take the train to school 乘火车去上学 14.in places

37、 在一些地方 15.go to school by boat乘船去上学 16.on the school bus乘坐校车 17.be different from和不同 18.one 11-year old boy 一个十一岁大的男孩 二、重点知识详解 1.take +a/an/the+表示交通工具的名词,乘去某地,是动词短语,在句中作谓语。 He takes the train. take the subway乘地铁 take a walk散步 take a shower洗个澡 take a rest休息一会 take a seat 坐下 take some medicine 吃药 2.by

38、+表示交通工具的单数名词或on/in+ a/an/the/ones+表示交通工具的单数名词,是介词短语作方式状语。 I get to school by bike. = I get to school on my bike. 3.walk/ride/drive/fly+to+地点名词,步行/骑自行车/开车/坐飞机去某地 表示乘交通工具方式可以互换表达相同的意义: Take the bus to school=go to school by bus=go to school on a bus Drive a car to work=go to work by car=go to work in

39、a car Fly to shanghai=go to shanghai by plane/air=take the/a plane to shanghai=go to shanghai on a/an/the plane. 4.get表示“到达”,后接名词需加to,接地点副词不加to. d before use, ensure the safety of use; Every day must be in service for toxic gasl equipment, facilities, safety equipment, gas masks, accessories, materi

40、als and personal protective equipment must be checkeof althe table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation 1 construction organization name project name the construction site construction requirements of security technical ca

41、rds on -2-down (reference tables) 4-hole pile project technology gives the low-deposit of an instrument, and filed a report. Artificial Diging up and down. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the ffoldlities: feeder channel should be s

42、et 1M high guard rail around, up and down ramps or stairs, are not allowed to climb the scasteel elements should be straightened, damage repair and paint for reuse should scrap cannot be repaired. 11. auxiliary faci ion of deformat?ld be covered. Sporadic small fasteners, bolts and other components

43、using clean diesel box, store room for reuse. l be classified and piled up stacked flat, under pads well drained. Steel is best placed indoor, stacked in the outdoors shoushal scaffold dismantling after the material?nd, and check whether it will collapse, check the security before the intermission.

44、interrupt the process of demolition, if absolutely necessary to interrupt the dismantled parts should be clearly come to an e ot to best n?removal process is best not to change horses in the Middle, such as the need for person, should be removed clearly. ?go to the pass or use the rope hanging down,

45、 throw shall not be voted down, so as to avoid injury and unnecessary losses. ouldoperators in the Middle Poles shall not throw down. Dismantling scaffolding, scaffold, steel pipe, fasteners, materials sh dismantle large Rails scaffolding, bridging, you should split the middle button, then remove bo

46、th ends buckle, Shun down by? usly. ban people entering. Strict compliance with the removal order, from the top down, step, and no upper level jobs simultaneoanging belts. Before dismantling scaffolding, around fences or warning signs, set up special care in transport routes and soled shoes. Remove

47、pick rack and other dangerous parts h-tool bag. Wear personal protective equipment correctly, foot wear softear division of labour, unified command, operation energies to concentrated, may not look around and joking, when not in the g of content security technology, team members have a cl2 construct

48、ion construction construction organization name project name cards on the table before the one down the scaffoldin-down on 4-ions of that document. Scaffold safety technology gives the low production assurance system approval requirements in accordance with fire safety provis?urity disclosure. forem

49、en on construction jobs in the process of releasing production tasks at the same time, the need for sec?to create). 2temporary electricity security construction organization design; large mechanical of loaded, and split construction programme; labour protection technology measures requirements, and plans; dangerous parts and way process, especially construction risk degree

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1