1、Large span continuous beam bridge construction control content and method ofKeywords: large span continuous beam bridge; construction control;Abstract: in our country, the suspension bridge, arch bridge, continuous rigid frame bridge and other aspects of research and practice has achieved good resul

2、ts, but for large span prest ressed concrete conti nuous beam bridge const ructi on control technology of the relatively few studies. So the research and application of large span prestressed concrete continuous beam bridge construction control technology has very practical significance in engineeri

3、ng. This paper first analyzes the influence of long- span bridges construction control factors, followed by the construction of the contents and methods of construction control , the control principle are elaborated.1 Prefa ceThe construction of long span bridge to go through a complicated process,

4、in this process will be a lot of certain and uncertain factors, leading to the bridge structure s actual status deviates from the theoret ical calculation state. Therefore, the bridge construction control is the focus of the construction process by analyzing deviations which occur in the identificat

5、ion, identify problems and timely rectification, and the structure of the follow-up phase undertakes forecasting, make construction system is always in control.Effec ts of 2 fa c tors in the construc ti on control of 1 Large span continuous beam bridge construction control the main purpose is to mak

6、e the actual construction condition and maximize the ideal design ( alignment and stress ) coincide. To achieve these goals, we must fully understand the construction state may deviate from the theoretical design status of all the factors, so as to implement effective control of the construction of

7、have a definite object in view.2.1 struc ture pa ra m ete rs 2 Regardless of the bridge construction control, the structure parameters are very important factors to consider, structural parameters control in the construction simulation analysis of basic information, whose accuracy directly affects t

8、heaccuracyof analytical results. In fact, the actual bridge structure parameters are generally very difficult to design for structural parameters of identical, there is always some errors, control of construction how to properly credited for these errors, so that the structural parameters of the act

9、ual structure parameters as close as possible to the bridge, is the first problem to be solved. Structure parameter mainly includes structure cross section dimension, structure the elastic modulus of the material, material density, coefficient of thermal expansion of materials, construction loads, p

10、restressing or cable force etc.2 .2 construction te chnolog yConstruction control for construction services, in turn, construction quality has a direct impact on the implementation of target of control. In addition to the requirements of construction technology must comply with the control requireme

11、nts, the construction control must be included in the construction conditions of non ideal brings the fabrication, installation and other aspects of the error, and make the construction state is maintai ned in the control of.2 .3 construc ti on m onitoringConstruction control of bridge monitoring is

12、 one of the most basic methods. Monitoring includes stress monitoring, deformation monitoring. Because the measurement apparatus, instrumentation installation, measurement method, data acquisition, environment, errors exist, therefore, structure always exist error monitoring. In the control process,

13、 in addition to the measuring device, method to try to reduce the measurement error, in the control analysis must be inc luded in the.2.4 cha ng es of te m pera tureTemperature change on the stress and deformation of the bridge structure has great influence, this effect varies with the temperature c

14、hange in different time on the structure, state ( stress, deformation ) were measured, the results are not the same, if the construction control of neglected the factors, it is difficult to obtain the true state of the data structure thus, it is difficult to ensure the effectiveness of control, ther

15、efore, must consider the influence of temperature change. Is generally a day the temperature variation in smaller morning as required to control data acquisition time. But for seasonal temperature difference and the bridge body temperature residual effects to attention.T he 2 .5 m a teria l shrink a

16、 g e, c ree pOn the concrete bridge structure, material shrinkage, creep of structural internal force, deformation has a greater influe nce, mainly due to the large span continuous beam bridge construction concrete common loading age short, each stage of age difference between the major cause, contr

17、ol should be carefully studied, in order to adopt reasonable, practical creep parameters and calculate model. Shrinkage, creep will also influence the bridge after the operational phase of the structure deformation, which is also the setting pre-arch factors need to be considered.C onstruc tion of t

18、he 3 c ontrol ta sk s a nd w ork c onte ntThe bridge construction control task is to bridge construction process control 3 , to ensure that the construction process of bridge internal force and deformation of structure is always in the allowable safety limits, ensure that a bridge state (including t

19、he bridge linear and bridge structure internal force ) meets the design requirements. The bridge construction control the control missions, the construction control work mainly includes the following aspects:3.1 g eom etric ( deform a ti on ) controlThe method of construction, the bridge structure i

20、n the construction process toproduce deformation ( deflection ), and the deformation of the structure will be affected by many factors, is very easy to make the bridge structure in the construction process of the actual position ( elevation elevation, position ) state to deviate from the expected st

21、ate, so that the bridge could not smooth closure, or into a bridge linear shape and design do not meet the requi rement s, so we have to carry out control of bridge structure in construction, make its actual location in the state and the desired state between the error in the permissible range and i

22、nto the bridge linear statemeetthe design requirements.T he 3 .2 stre ss controlBridge structure in the construction process and the stress condition of bridge state and design accord with the construction control is the important issue to clear. Usually by st ructur al stress monitoring to understa

23、nd the act ual stress state, if it is found that the actual stress state and stress state theory (Computational ) differential overrun must carry checks and regulation, which is within the allowable range change. Structure stress control is not so easy to find if the deformation, stress control not

24、do ones best to structural damage, serious will happen structural damage ( China Ningbo Z haobaoshan Bri dge Girder fra cture is one exampl e), therefore, must be the implementation of strict control on structural stress. Stress control of the project and the precision is not well defined, according

25、 to the actual situation, usually including: The structure caused by stress ( the actual stress and design phase should be controlled within + 5% ). The structure under construction load stress ( the actual stress and design ph aseshoul d be controlled wit hi n + 5% ). The struc ture of prestressing

26、 force in addition to the tensioning implement double control ( oil gauge control and elongation control, elongation error allowed within plus or minus 6% ), must also consider the pipe friction influence ( for post tensioned structure ). The temperature stress, especially large volume foundation, p

27、ier column. The other s t resses, such as foundati on displacement, wind load, snow load caused by structuralstress. The construction used in the bridge construction safety has a direct influence on the rack, basket, cable hoisting system in a safe range of stress.3 .3 sta bil i ty controlThe stabil

28、ity of bridge structure is related to the safety of bri dges, it is with bridge strength has equal or even more important. The world has had many bridges in the construction process due to instability and cause the whole bridge failure examples, the most typical is Quebec Canada ( Quebec ) bridge. T

29、he bridge on the south side of the anchor frame truss is finished, because the cantilever end of the buckling of web plate and the bottom chord bar suddenly collapses fall. China Sichuan River Bridge by cantilever girder hoisting system in main span of bear large axial force and failure. Therefore,

30、the construction process of the bridge construction should not only strictly control the stress and deformation, and to strictly control in each stage of construction structure of local and overall stability. Mainly through the stability analysis ( stability safety coefficient ), and with the struct

31、ural stress, deformation to comprehensive assessment, control of its stability.3.4 sa fe ty c ontrolB ridge construction safety control during the bri dge construction control is the important content in the construction process, only to ensure the safety, just talk to go up the other control and br

32、idge construction, in fact, bridge construction safety control is the control of deformation, stress control, stability control integrated embodiment, each of the above gets out of control, safety get control ( because the bridge construction qua lity problems ca used by security i ssues except). Du

33、e to the structure of different forms, directly affects the construction safety factors are not the same, in construction control of the basis of the actual situation, determine its safety control key.4 c onstruction control m ethodContinuous beam bridge construction monitoring and recognition is to

34、 adjust to the trailer, construction cycle, its essence is to make construction according to a predetermined desired state (mainly the construction elevation ) smoothly. But whether the theoretical ideal state, or the actual construction error, therefore, construction control of the core mission is

35、to all sorts of error analysis, recognit ion, adjustment of structure, making predictions.4 .1 pre dic ti v e control m ethodPredictive control law refers to fully consider the impact of various factors and structural state of bridge construction to achieve the goal, the structure of each constructi

36、on stage ( segment ) before and after the formation of forecast, make construction along a predetermined state. As a result of predictive state and the actual state of unavoidable errors exist, some kind of error on the construction goals influence in subsequent construction state prediction for con

37、sideration, this cycle until the completion of construc tion, and obt ained with design accord with the structure state. This method is applicable to all bridges, and for those who have a structure with adjustable bridge construction control must use this method. Predictive control based on modern c

38、ontrol theory, the prediction methods are common Calman filter method, grey system theory control method.4.2 adaptive control methodIn view of the continuous beam bridge completed segment is not controllable and construction of linear error corrective control limited, the error is very important,so,

39、the adaptive control method in the control is very effective.4.3 l ine a r re g ression ana ly si s m ethodLinear regression analysis method is based on the cantilever box girder with cantilever length of cantilever deflection, the weight of a Yuan linear regression treatment or two element linear r

40、egression, linear regression mathematical model establishment of deflection summary. It can be used for the analysis of box beam deflection regularity, can also be used to predict the pending construction of beam deflection. But it is not possible to temperature and construction caused by error corr

41、ection, and requires a more regular data lines, in the relatively small number of beam section obtained by the regression curve precision is hard to guarantee.5 S um m a ryMainly discusses the effect of large span continuous beam bridge construction control factors, construction control task and wor

42、k content and construction control method. Our country in bridge construct ion control theory and practice is not to establish a set of perfect construction control technology system and management system. Therefore, indepth study of the bridge construction control theory, development is more reason

43、able, practical control software and more convenient, accurate monitoring equipment, establish and improve the control technology of bridge construction system and management system is the future development of bri dge construction theurgent need for work.R efe renceLiu Laijun 1. Large span bridge c

44、onstruction control analysis of uncertain factors D. Master Dissertation of Changan University, 20022 Xiang Zhong-fu. Control technology of bridge construction M. Beijing: China Communications Press, 20013 Gu Anbang, Chang Ying, Le Yun. Long span prestressed concrete continuous rigid frame bridge co

45、nstruction control theory and method J. Journal of Chongqing Jiaotong College大跨径连续梁桥施工控制的内容与方法探析论文关键字: 大跨径;连续梁桥;施工控制 论文摘要: 我国在悬索桥、拱 桥、连续刚构桥等方面的研究与实践取得了较 好的成果,但对大跨预应力混凝土连续梁桥的施工控制技术研究相对较少。因此 研究和应用大跨预应力混凝上连续梁桥施工控制技术具有极现实的工程意义。 本 文首先分析了大跨桥梁影响施工控制的因素,其次对施工控制的内容及方法、施 工控制的基本原理等进行了的阐述。1 序言 大跨度桥梁的施工要经过一个复杂的过

46、程,在此过程中将受到许多确定和不 确定因素的影响,导致桥梁结构的实际状态偏离理论计算分析状态。因此,桥梁 施工控制的重点就是通过对施工过程中出现的偏差进行分析识别, 发现问题并及 时进行纠偏, 同时对结构的后续阶段进行预测,使施工系统始终处于控制之中。2 影响施工控制中的因素 1大跨径连续梁桥施工控制的主要目的是使施工实际状态最大限度地与理想 设计状态(线形与受力)相吻合。要实现上述目标,就必须全面了解可能使施工 状 态偏离理论设计状态的所有因素,以便对施工实施有的放矢的有效控制。2 . 1 结 构参 数 2不论何种桥梁的施工控制,结构参数都是必须考虑的重要因素,结构参数是控制中的结构施工模拟

47、分析的基本资料,其准确性直接影响分析结果的准确性。事实上, 实际桥梁结构参数一般很难与设计所用的结构参数完全吻合,总是存在一定的误差,施工控制中如何恰当地记入这些误差,使结构参数尽量接近桥梁的真实结构参数,是首先需要解决的问题。结构参数主要包括结构构件截面尺寸、 结构材 料弹性模量、材料容重、材料热膨胀系数、施工荷载、预加应力或索力等 内容。2 . 2 施 工工艺施工控制是为施工服务的,反过来,施工的好坏又直接影响控制目标的实现。 除要求施工工艺必须符合控制要求外,在施工控制中必须计入施工条件非理想化 带来的构件制作、安装等方面的误差,使施工状态保持在控制中。2 . 3 施 工监测监测是桥梁施

48、工控制的最基本手段之一。监测包括应力监测、变形监测等。因测量仪器、仪器安装、测量方法、数据采集、环境情况等存在误差,所以,结构监测总是存在误差的。在控制过程中,除要从测量设备、方法上尽量设法减小测量误差外,在进行控制分析时必须将其计入。2 . 4 温 度变化温度变化对桥梁结构的受力与变形影响很大,这种影响随温度的改变而改 变, 在不同时刻对结构状态(应力、变形)进行量测,其结果是不一样的,如果 施工控制 中忽略了该项因素,就必然难以得到结构的真实状态数据,从而也难以 保证控制的 有效性,所以,必须考虑温度变化的影响。一般是将一天中的温度变 化较小的早晨 作为 控制所需实测数据的采集时间。 但对

49、季节温差和桥梁体内的温 度残余影响要予 以重视。2 . 5 材料 收缩 、徐 变对混凝土桥梁结构而言,材料收缩、徐变对结构内力、变形有较大的影响,这主要是由于大跨径连续梁桥施工中混凝土普遍加载龄期短、各阶段龄期相差大等引起的,控制中要予以认真研究,以期采用合理的、符合实际的徐变参数和计一算模型。收缩、徐变还将影响成桥后运营阶段的结构变形,这也是设定预拱度需要考虑 的因素。3 施工控制的任务与工作内容桥梁施工控制的任务就是对桥梁施工过程实施控制 3 ,确保在施工过程中 桥梁结构的内力和变形始终处于容许的安全范围内,确保成桥状态(包括成桥线 形与成桥结构内力) 符合设计要求。桥梁施工控制围绕上述控制任务而展开,其 施工控制的工作内容主要包括以下几个方面:3 . 1 几何 (变 形) 控制不论采用什么施工方法,桥梁结构在施工过程中总要产生变形(挠曲),并且 结 构的变形将受诸多因素的影 响,