资源描述

《《项王加气站生产辅助用房土建安装工程消防工程施工组织设计》.doc》由会员分享,可在线阅读,更多相关《《项王加气站生产辅助用房土建安装工程消防工程施工组织设计》.doc(124页珍藏版)》请在三一文库上搜索。

1、目 录第一章、工程总体概述、工程施工组织总体设想、方案针对性及施工段划分1第二章 、施工现场平面布置和临时设施、临时道路布置8第三章 、施工进度计划和各阶段进度的保证措施9第四章 、各分部分项工程的施工方案及质量保证措施11第五章 、安全文明施工及环境保护措施87第六章 、项目管理班子的人员配备、素质及管理经验99第七章 、劳动力、机械设备和材料投入计划104第八章、关键施工技术、工艺及工程项目实施的重点、难点和解决方案107第九章、冬雨天施工、已有设施、管线的加固、保护等特殊情况下的施工措施112第十章、新技术、新产品、新工艺、新材料应用117Opinions and suggestions

2、 on the partys mass line educational practiceAccording to the central and provincial, municipal unified deployment, according to municipal Party committee about carrying out the partys mass line educational practice activity in the citys implementation opinions, the spirit of the partys mass line ed

3、ucational practice activities from 20* in January to 99 months, carried out at all levels of departments and directly affiliated institutions and grass-roots party organizations. According to my actual County, the county to carry out the education practice put forward the following implementation op

4、inions.First, the overall requirementsCounty county education practice to the eighteen Party of eight, the spirit of the the third Plenary Session of the 18th CPC Central Committee as the guidance, conscientiously implement the spirit of general secretary Xi Jinping book series of important speech,

5、earnestly implement the Central Committee really, opinions and advice , party implementing the guiding ideology of opinions to determine the objectives and requirements, step method, in accordance with the look in the mirror, dress up, wash bath, cure treatment, the general requirements of for the p

6、eople pragmatic honest people as the theme, in carrying forward the spirit of Zhuanglang Zhuang, improve their work style, service to the masses of the people, the foundation of consolidating grassroots, promote transformation across efforts, to further implement the central eight regulations and Th

7、e opposition party and government austerity waste regulations , double section provincial regulations, municipal provisions of the twelve plan and the implementation measures for on improving the work style of close ties with the masses law, highlight style building, carry out the whole wind spirit,

8、 resolutely oppose formalism, bureaucracy, hedonism and wasteful extravagance to solve the problems, Party members and cadres of the style and the masses of people strong, the Ministry of Party members and cadres to further improve their thinking and understanding, to further change the style of the

9、 wind, the masses to close, honest and pragmatic people honest image to further establish the foundation to further reinforce the basic level. Style of the building of the new results to promote the construction of a powerful force of the county and the ecological culture of the county and county co

10、nstruction.In educational practice activities of the unit is mainly: the county and below county departments under the organs, enterprises and institutions directly under the township, street, and community, village, non-public economic organizations, social organizations and other grass-roots organ

11、izations. Agencies and branches, each single unit, follow the rules on internal institutions. Educational practice with step by step.To adhere to the county leadership, leadership and leading cadres to focus on outstanding catch to directly contact the service of the masses of law supervision depart

12、ments and window units, service industry, educational practice, pay attention to grasp the heavy towns, streets and villages, community education activities and the masses of grassroots groups in close contact to strengthen, and the majority of Party members, cadres and the mass line line Marx doctr

13、ine view of the masses and the partys education.Always speak seriously as a basic attitude, adhere to positive education, to carry out criticism and self criticism group, adhere to the pragmatic, more emphasis on leadership, pay more attention to the layers of the demonstration, more focus on the fo

14、ur winds, solve the problem, pay more attention to open the door, the participation of the masses, pay more attention to the classification guidance. Orderly, pay more attention to the cooperation and cohesion driven, more strict requirements on injection, really supervision practice, ensure educati

15、on practice is not empty is not empty is not partial, not as a mere formality.Two, the key point of the taskThe main task of the countys education practice is to seize against four wind this focus on centralized solve outstanding problems asked County, township leadership and leading cadres of the f

16、our winds, the disadvantages of the style, scale behavior to a large scale investigation, overhaul, cleaning greatly. At the same time, respond to the concerns of the masses, safeguard the interests of the masses, pay attention to solve practical problems, solve the people around the unwholesome ten

17、dencies especially on eat, take the card, Yong lazy luxury, extravagance and waste fees, privileges and other issues, timely and effective, without any discount to solve, to improve the style of real implementation of the requirements of real to the grassroots, real let group Benefit the public.(a)

18、focus on solving the four winds outstanding issuesThe central and provincial requirements, the county leadership and leading cadres of key performance concept is not correct, do not dare to play, to engage in image project, political project, a leadership guide, a set of ideas, orders and prohibitio

19、ns, and a policy, there are countermeasures county. The units directly under the heavy focus on solving Yung lazy drag, buck passing skin, work is not implemented, the service is not active. The dynamic problem of law enforcement and supervision departments and window units, service industry mainly

20、solve the door hard, ugly face, something difficult, and arbitrary charges, fines, levies, and breach of privilege, chinakayao, not the problem of law. The township, street The collar of leading bodies and leading cadres to solve key does nottheir own conditions to develop the correct road, the maxi

21、mum to avoid investment risk, gain profit.(three) vigorously promote the brand. To establish brand awareness, awareness of the use of brand, brand value, brand acquisition performance, enhance the competitive strength. Concentrated manpower, careful planning, packaging and publicity of a number of u

22、nique, market influence and coverage of the brand, the implementation of key breakthroughs, to enhance the competitive strength, walking business road the competition of alienation and characteristics, the pursuit of stability and development of the market.(four) to promote the integration of resour

23、ces. To further broaden their horizons, effective integration of resources within the group, the city resources, other industries and regional resources, mutual trust, mutual benefit, seeking win-win principle, in the framework of national policies and regulations, strict inspection and argumentatio

24、n, legal consultation, examination and approval procedures, strict regulation of economic activities, attract injection the social investment to the industry group, to achieve leveraging the development, ensure that the value of state-owned assets.(five) to strengthen the construction management per

25、sonnel. Strengthen the management of education and training of cadres and workers of the existing business, firmly establish the concept of the market, enhance the sense of crisis to adapt to market competition, the sense of urgency, improve the ability to respond to market competition, improve mana

26、gement and operation of the market. At the same time, according to the need of industrial development, vigorously the introduction of high-quality management management personnel, and strive to build a high-quality professional management team, hard work, and promote the entire workforce knowledge s

27、tructure, age structure, structure optimization and upgrading ability, enhance core competitiveness, adapt to the need of market competition.(six) seriously study the policy for policy. Serious research about social support the development of cultural undertakings in the country and the XX policy, e

28、specially the policy of industrial development, financial investment policy, financial policy and tax policy, and actively seek policy, projects and funds, enterprise and industry group mission to promote leapfrog development.第一章、工程总体概述、工程施工组织总体设想、方案针对性及施工段划分一、工程概述 该工程位于宿迁市区运河路西侧、马陵河东侧、项王路南侧,包含加油加气站

29、房,生产辅助用房土建安装工程消防工程。建设单位中国石油化工有限公司江苏宿迁分公司,宿迁市建筑设计研究院有限公司设计。工期要求150日历天,工程质量合格。2、 施工准备目标(一)现场准备 1、我公司在接到发表发的中标通知后,立即委派人员进场,对原有的设计,临时上、下水口、电、道路等接收,复核中心线、标高尺寸,在通过有关单位验收后,方可破土动工。 2、根据本工程施工现场具体情况,结合本工程施工工期紧等特点,我公司考虑现场搭设临时设施及安排机械停放场地和相关材料拌合场地。 3、及时做好进场机械设备的安装调试工作。 4、供水、供电生活用水用电可与当地供水、供电部门联系解决,为确保施工用电,配备75KW

30、发电机作施工用电备用。 5、通讯 项目经理部工程负责人及技术员、施工队负责人每人配移动电话一部。 6、施工测量及试验 项目经理部设立测量组,配备先进的经纬仪、水准仪等测量工具,统一对全标段的道路平面及高程进行控制。(二)物资设备准备 1、根据施工图预算、分项工程施工方法和施工进度安排,对各种工程材料、周转使用材料、外加工制品、施工机具等物资制定需要计划。 2、根据各种物资需要计划,组织加工、供应地点和供应方式、签定物资供应合同和制定运输计划。 3、按照总平面图的要求,将物资按计划时间,在指定地点、按规定方式进场储存和堆放。 4、本工程拟投入主要施工机械详见附表。 (三)劳动力组织准备 1、在本

31、工程施工中,根据各分项工程的规范和技术要求,结合工期情况安排施工队伍进场,并进行岗前培训教育。 2、建立和健全各项劳动力管理制度。 3、制定详细的劳动力进场计划。 (四)技术准备 1、熟悉招标文件和合同精神及有关规范要求。 2、熟悉和会审设计图纸,检查各种几何尺寸是否正确一致。 3、编制总体施工组织设计和分项工程施工方案。 4、编制施工图预算和施工预算。 5、编制总体控制计划,确保工序搭接时间。 6、绘制各种阶段的场地布臵图。 7、制定材料运输方案。 三、施工管理目标 1、质量目标 我们将严格按照ISO9001:2000质量体系标准,并根据现场实际情况,制定切实可行的质量保证措施,加强施工过程

32、控制和质量通病的防治,消除任何质量事故隐患,保证各分部分项工程的合格率达100%,工程质量:合格。 2、工期目标 根据招标文件工期要求,我方将在详细勘踏现场实际情况,深入了解业主意图并进一步细化修正施工组织设计的基础上,根据施工总体施工要求,合理安排施工生产,投入足够的人、材、物、设备等资源,在施工区认真安排计划工序流程,保证流程合理、经济高效,以每个工序目标来保证区域目标,以区域目标的完成来保证总体目标,确保施工按照招标工期要求完成。 四、安全目标我们将认真落实安全生产责任制,坚持“安全第一、预防为主”的方针,建立健全安全保证体系,确保无人身伤亡事故,无交通安全事故和机械伤亡事故。 五、施工

33、总体设想、方案针对性及施工阶段划分 1、施工总体设想本工程施工在作业面上形成流水作业,做好施工总进度计划网络图、月进度计划网络图、周进度计划网络图,严格按照计划执行,并做好每周总结,调节偏差分配流水步距。2、本工程方案针对性 根据设计图纸及施工规范要求,结合工程施工质量、工期、安全文明施工等,本工程施工时采取如下方案:2.1、施工总顺序上的部署原则,按照先地下,后地上;先结构,后围护;先主体,后装修;先土建,后安装的总施工顺序进行部署。本工程单位工程较多,合理的安排施工顺序,合理的调配人员,材料、机械是本项目的重点。2.2、时间上的部署原则及季节施工的考虑;根据工程实际情况,如我方有幸中标,我

34、方拟从合同签定之日起正式施工,在5个月内确保交付使用。为了保证冬雨期施工工程质量,编制季节施工措施,加大周转设置料具的投入,在中标后我施工方将提供具有针对性的施工计划。2.3、空间上的部署原则:穿叉交递进行。2.4、资源上的部署原则:机械设备及设施料的投入。由于施工场地无水无电,因此业主需提前考虑,确保水电到施工现场。施工机械设备以及设施料的投入在中标后开工前进入现场,具体见机械投入计划。2.5、确定项目施工阶段本工程施工程序划分为五个阶段,根据不同阶段的具体内容,确定施工管理重点和管理目标。施工程序如下:接受任务阶段开工前施工准备阶段施工阶段交工验收阶段工程保修期阶段。5.3全面施工阶段:全

35、面施工阶段的主要任务就是全面履行工程承包合同,以施工组织设计和项目质量计划为指导,按照确定的施工顺序全面组织工程项目施工,全面开展项目技术质量管理、工程施工成本管理、安全生产和文明施工管理等项目管理工作,完成全部工程施工内容,实现项目各项管理目标,保证工程按期竣工。该阶段的管理实施重点是进行施工过程控制、现场协调管理和各项后勤保障工作,以及各方面的协调管理。施工过程控制主要由项目经理部负责组织实施,与业主代表、项目监理密切协作,抓好施工项目各项现场协调管理工作。公司各管理部门按照各自主控要素分配进行各项施工管理策划与监督。其他协调工作根据有关事宜的解决方式和途径,分别由施工现场和公司总部负责办

36、理,特别要注意加强各方面的密切联系。第2章 、施工现场平面布置和临时设施、临时道路布置一、施工平面布置(详见施工平面布置图,附后)1、施工总平面布置原则在对本工程施工总平面进行布置时,依据场地实际情况,原则上力求科学合理,充分利用场地资源,最大限度地满足施工需求,以确保工程质量、工期、安全生产、文明施工、环境保护、科学管理六大目标的实现。根据上述要求,我们在对本工程的施工平面进行布置时,结合本工程施工特点对其施工平面分别进行有针对性安排,并遵循下列原则布置:尽量减少施工用地,使平面布置紧凑合理。合理组织运输,减少运输费用,保证运输方便通畅。施工区域的划分和场地的确定,应符合施工流程要求,尽量减

37、少专业工种和各工程之间的干扰。各种生产生活设施应便于工人的生产生活。 满足安全防火、劳动保护的要求二、施工总平面的优化和管理1、施工总平面的优化施工现场总平面布置除按本章规划外,进入施工准备阶段进行实际布置时,为使场地分配、各类仓库位置的确定、管线道路布置更为合理,需要根据现场实际条件进行优化计算和调整,然后确定布置方案并报经业主批准。施工平面布置的优化方法有:场地分配优化采用巨阵法、临设生活服务区采用区域叠合优化法、仓库位置优化采用选点归邻法,施工用水用电线路优化采用最小数选线优化法。实际布置优化计算根据现场条件选用。2、施工总平面的科学管理:2.1建立统一的施工平面图管理制度,划分使用管理

38、范围。有人负责,严格控制各种材料、构件、机具的位置、占用时间和占用面积。2.2实行施工平面动态管理,定期对现场平面进行实录、复核,修正其不合理的地方,定期召开平面执行检查会议,奖优罚劣。2.3做好现场的清理和维护工作,不准擅自拆迁建筑物和水电线路,不准随意挖断道路。大型临时设施和水电管路不得随意更改和移位。第3章 、施工进度计划和各阶段进度的保证措施 该工程的施工总工期为150日历天,为了保证本工程在150日历天内顺利竣工的目标,应合理安排好施工进度计划。具体进度计划安排详见施工进度计划横道图。1 施工进度计划说明1.1 本计划的编制充分考虑了本标段的工程特点,地理环境,工期要求,本着先地下后

39、地上的原则,合理地安排人力、物力和设备机具,多支队伍同时投入本工程的施工。1.2 根据业主提供的各分项工程的工期计划及当地的气候条件,结合我公司以往的施工经验,考虑到设备到货情况及冬、雨季节对施工的影响,本计划以最大限度满足业主对工程工期及工程质量等方面地要求为制定宗旨,将各分项工程的具体施工工期加以细化分解(详见施工进度计划表,附后)。2.3 本站内地上施工为施工重点,组织一支有丰富施工经验的队伍,配备齐全地施工机具,全面进行,确保工程保质保量全面完成。2.4 根据本工程站内系统工艺,施工旺季正值冬季的特点,为了使工程在最佳时间完成,我们对施工队伍进行了周密、细致的安排,这样即保证了工程工期

40、及工程质量,又降低了施工的难度。第4章 、各分部分项工程的施工方案及质量保证措施第一节:主要分项工程施工顺序1、土方开挖施工顺序定位放线定位报验复测机械开挖人工清底基坑验槽报验进行下道工序施工。2、钢筋分项施工顺序钢筋进场验收钢筋按批复试钢筋除锈、调直切断、弯曲、加工成型钢筋加工报验钢筋绑扎报验、钢筋隐蔽下一道工序施工。3、模板分项施工顺序3.1柱模板柱钢筋验收隐蔽支设柱模板模板固定模板报验砼浇筑模板拆除。3.2梁、板模板梁底、板底模板支撑梁底、板模板支设梁侧板支设固定模板报验。4、砌体分项施工顺序抄平放线立皮数杆分层砌筑到距梁底330mm构造柱勾缝养护稳定补砌梁底剩余部分墙体。5、楼地面工程

41、基层清理洒水湿润刷水泥浆结合层铺水泥砂浆、用刮杠搓平铁抹子压光养护。6、室内装饰装修工程6.1室内顶棚抹灰搭脚手架基层处理弹线、套方、找规矩抹底灰抹中层灰抹罩面灰。6.2内墙面抹灰 基层处理吊垂直抹灰饼墙面冲筋抹底灰抹罩面灰。7、屋面工程施工顺序基层清理找平层保温层施工涂层处理铺贴附加层热熔铺贴卷材热熔封边。8、电气安装施工顺序各种材料准备接地避雷装置调试构件制作进入施工现场土建配合预埋设备基础安装钢管、PVC管暗敷设电缆敷设校线、接线电气调试绝缘测试照明灯具、插座及弱电系统安装调试系统送电、试车资料整理竣工验收。第二节:施工测量1、平面位置控制 进场后,首先根据总平面图和甲方给定的坐标点和水

42、准点测设控制桩,形成施工控制网。控制网由建筑物主轴线组成,控制桩设在主轴延长线,离开基坑边缘最小3m,由于土方施工对施工现场扰动较大,应对现场的控制桩和水准点进行一次全面的复核。轴线控制桩应设在不受施工影响,便于保护的地方。轴线控制桩测设好以后,应经有关技术部门技术复核验收后使用。 0.000以下施工阶段,在基坑边测临时制桩,用经纬仪投测控制轴线,然后用钢尺测量、放出其它轴线。在平面测量放线的过程中,可以在基坑内侧设临时轴线控制桩,因为从垫层开始,到施工至0.000要多次放线,较多地设控制桩可以加快放线速度并进行相互校核。 建筑物出地面后,将轴线投测到结构侧面,用经伟仪向上引测轴线位置,为消除

43、测量误差,采用盘左,盘右两个位置投测,取其中心作为轴线位置。 2、标高控制与高程传递施工现场测设的水准点南北各处应不少于3个,以便于相互校核。0.000以下的结构施工时,应在基坑侧壁上测设量标高控制桩。用水准仪,水准尺将标高传递到施工作业面上,在已完成的墙上,应弹出50cm水准线,做为砌筑、装修及安装等各道后续工序的基准线。第三节:土方工程1、土方开挖1.1机具:反铲挖掘机、自卸汽车、铁鍬、手推车、钢卷尺、坡度尺;1.2施工准备:开挖前将施工区域内的地下、地上障碍物清除和处理完毕;建筑物的定位控制桩、标准水平桩及开挖的灰线尺寸,须经过检验合格后并办好预检手续;为夜间施工配备足够的照明设施,危险

44、地段设置明显标志;施工机械所经道路做加固处理(夯实或铺碎石压实)1.3操作工艺机械放坡开挖坡度为1:0.35;挖土时坑底预留15cm厚土层由人工清土并及时由挖土机挖走。开挖过程中,随时检查边坡状态,根据土质情况做好支撑准备,以防坍塌;最后检查坑边尺寸,修整边角,槽底修理铲平后进行质量检查验收;基坑内挖出的余土方堆放在附近场地,与建设单位协商后再确定部分土方的用途与处理方法。2、灰土垫层2.1施工机具:压路机、灰土拌合机、蛙式打夯机、手推车、筛子、耙子、铁鍬等;2.2作业条件:基坑在铺灰土前,必须先行普探,并按设计要求处理完地基,办好验槽手续;如地下水位高于基底时,施工前采取排水措施保持地下水位

45、在施工面以下50cm左右;施工前应根据设计的压实系数通过压实试验来确定土料含水率控制范围、铺土厚度和夯打遍数等参数;施工前做好水平高程的标志;2.3操作工艺先检查土质和石灰的材料质量是否符合标准要求,然后分别过筛几次,拌好的灰土颜色一致;分层铺灰土,厚度控制在200250mm为宜,每层夯实后应用环刀取样检验,符合要求后方可进行上层施工。分段施工时,严格按施工规范的规定操作,上下两层灰土的接槎距离不得小于500mm;灰土最上一层完成后,应拉线检查标高和平整度,并由质量人员检查验收;灰土地基施工完后应及时进行基础施工,否则应加以临时遮盖。3、土方回填3.1填土的要求:回填应在基坑四周同时进行回填与

46、夯实;通过实验控制填土的含水率在最优含水量范围内;3.2压实排水要求:基槽四周设置明沟及集水井,排除明水;已填好的土如遭水浸,应把稀泥铲除后方能进行下一道工序;填土区应保持一定坡度以利排水,当天填土,应在当天夯实;3.3质量控制与检验:在分层压实后,对每层填进行环刀取样测定土的干密度,验证土的密实度,符合设计要求后,才能填筑上层土;每层按300m2取样一组,但每层取样均不少于一组,取样部位在每层压实后的下半部;填土压实后的干密度应有90%以上符合设计要求,其余10%的最低值与设计值之差不得大于0.08t/m3,且不应集中。第四节:混凝土独立柱基础工程1、施工流程地基验收-测量放线-垫层模板支设

47、-砼浇筑-基础钢筋绑扎-模板支设-隐蔽验收-砼浇筑-基础回填。2、模板支设2.1基础采用复合模板,48钢管支撑,基础支撑间距不能大于1.2m,如果支撑面为基坑土壁时应垫=50mm厚木板,以增加承压面积,独立基础除模板支护牢固外,还应设置对角斜拉紧固件,保证基础的方正。2.2支模质量要求模板及支架必须具有足够的强度、刚度和稳定性。模板的接缝不应漏浆,接缝不大于2.5mm,必要时加设海棉条。模板的实际允许偏差必须满足以下要求。项目名称允许偏差值(mm)轴线位移5标高5截面尺寸+4,-5垂直度3表面平整度53、砼施工3.1原材料质量控制水泥选用P032.5#水泥和PO42.5#水泥,应有出场证并做水

48、泥安定性复试,合格后方可使用。所有掺加剂质量必须符合要求,并具有法定计量单位出具的质检报告和省、市有关部门出具的“准用证”。粗骨料应选用连续级配,针片状颗粒含量不大于5%,含泥量不大于3%的碎石。细骨料宜采用粒径大于0.5mm、含泥量不大于2%的中砂。砼拌合用水不得含有影响水泥硬化的有害物质。3.2浇筑及振捣砼浇筑前应对模板、支架、钢筋等进行细致检查并作自检和工序交接记录,钢筋上的泥土、油污,模板内的垃圾、杂物应清除干净,模板缝隙堵严。基础砼采用一次浇注到位。浇筑前应对模板、钢筋、预埋件、避雷接地钢筋进行复核,报监理批准后由施工经理开浇筑通知单,所有砼工程在施工前应进行检查,并且报监理进行批准后方可进行施工。砼工程除执行我公司企业标准外,还应