oi谢尔塔拉露天煤矿槽探工程_(一标段)施工组织设计.doc

上传人:本田雅阁 文档编号:2129596 上传时间:2019-02-19 格式:DOC 页数:82 大小:393.51KB
返回 下载 相关 举报
oi谢尔塔拉露天煤矿槽探工程_(一标段)施工组织设计.doc_第1页
第1页 / 共82页
oi谢尔塔拉露天煤矿槽探工程_(一标段)施工组织设计.doc_第2页
第2页 / 共82页
oi谢尔塔拉露天煤矿槽探工程_(一标段)施工组织设计.doc_第3页
第3页 / 共82页
亲,该文档总共82页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《oi谢尔塔拉露天煤矿槽探工程_(一标段)施工组织设计.doc》由会员分享,可在线阅读,更多相关《oi谢尔塔拉露天煤矿槽探工程_(一标段)施工组织设计.doc(82页珍藏版)》请在三一文库上搜索。

1、laparici de tot tipus de casos, la caiguda daccident de sha produt. (9) on la feina nivells sense operacions de installacions de protecci de seguretat, treballadors de la construcci han de dur un cintur o arnesos de seguretat (dispositius de protecci de seguretat sha comprovat abans del seu s), el c

2、intur de seguretat o cordes de seguretat utilitzats han de complir els principis dalta i baixa. No hi ha deures don ls de productes de protecci, per evitar accidents de caiguda passi. 6, prevenci dintoxicacions, asfxia accident les mesures preventives per evitar lenverinament, millor protecci de la

3、seguretat i la salut dels treballadors, les mesures es formulen. (1) quan la profunditat de la pila s ms de 5 M, el dia abans de linici de ls detector de gas per a la detecci de gasos txics, confirmar que el gas dins del forat correctament, abans dobra menor; ha de tenir 15min noms desprs de la vola

4、dura de fum forat es permeten les operacions. (2) lalberg est estrictament prohibit en lemmagatzematge de substncies txiques i qumics. (3) s interior lestabliment independents Calefacci, no fan de flama oberta denllumenat, Calefacci, per evitar accidents que requereixen denverinament de monxid de ca

5、rboni independents de lhabitatge Cambra climatitzada amb foc de carb, estufes ha de ser situats a lexterior. (4) al menjador de lautoritzaci de sanejament, personal de cuina ha de tenir un certificat de salut i certificat mdic per treballar. Botiga daliments crus i cuinats ha de ser processat per se

6、parat. for safety and security, set up security groups, head of the work group is responsible for the operations of safety and security, each team full-time safety officer is responsible for the daily life and production security. 成 . Good dining, on the implementation of special detection system fo

7、r procurement of food, preventing the purchase of spoilage and poisonous food to prevent food poisoning accident occurred. Pay attention to personal and environmental hygiene, to beautify the environment, clean air, beautiful life, environment, prevent the spread of infectious disease epidemics and

8、ensure attendance to ensure production safety. 8.4.4.4 from management to ensure safety punishment detailed rules for the implementation of a safety. To comply with policies, laws and regulations, observe labour discipline, according to safety regulations and technical specifications for constructio

9、n requirements for the construction, maintenance of production and life order, maintain social order there is significant merit in team and individual Award respectively; otherwise, penalties, to ensure production safety. 8.4.4.5 construction site safety protection 1) temporary facilities security p

10、rotection a. construction of establishing traffic signs and lighting, vehicle and pedestrian traffic safety. B. underground structure within the construction site, the underground pipeline,de la carretera, la construcci de canonada de desgus: a causa del drenatge canonades incrustat en tons, dacord

11、amb les especificacions pertinents i tenint en compte els requeriments raonables de tecnologia de la construcci, ha de fer el tractament subgrade i la zona dexcavaci desprs de lelevaci de lexcavaci a la ubicaci correcta i construcci de clavegueram. Per tant, lexcavaci de terra-Roca i terrapl caixa d

12、e la carretera, un acord raonable dobres de drenatge es va convertir en la clau per a la realitzaci del projecte suau. Pre-construcci, noms accelerar lexcavaci del moviment de terres per a subgrade i terrapl, per les obres de drenatge i posterior construcci crear cares, per tal de garantir la supera

13、ci de la totalitat del projecte. Aiges avall de nou lautor: segons els requeriments de tecnologia de construcci de drenatge, seguint lordre codi dincrustaci desprs de la primera per garantir la construcci de bon drenatge temporal durant lorganitzaci de construcci, perode de construcci en el seu conj

14、unt. Desplegament raonable de moviment de terres: aquesta Enginyeria per la construcci de processament i subgrade moviment de terres excavaci Enginyeria volum gran, base suau en la plena segons situaci especfica lloc, pargraf de cincia dividit construcci, arranjaments raonables distribuci de movimen

15、t de terres i nombre de moviment de terres abandonades exterior, festa pot camp redut dins el moviment de terres de repetici cavat omple de treball, per accelerar el moviment de terres subgrade i processament de subgrade de progrs de construcci, des del principi a les condicions de construcci creada

16、 de canonada drenatge, garantiran Enginyeria tot ordenat per. Canonades, paisatgisme, illuminaci denginyeria, construcci, Enginyeria de transport: a causa del disseny de drenatge del sistema utilitzant combinat, fora de la reserva a drenatges vial la canonada transversal ms significatiu impacte cons

17、trucci i Enginyeria de drenatge de la canonada creuant, i collectors enterrats profund,. 7.4.1 fase de preparaci construcci (1) construcci de lestaci de lloc: Oficina de lsing, va crear camps i altres installacions temporals, posant en el poder de lloc de construcci, corredor daigua. (2) lestablimen

18、t de la construcci de xarxa de control de topografia, organitzacions mesurar golfes i mesurar els resultats reportats pel Comissionat, els propietaris. (3) gran quantitat dexcavaci de subgrade, la identificaci de lrea de descrrega, per a la paret de Roca es prepara b. (4) mbit construir 2.4m blaus m

19、etllics de paret, noms reservat per a la construcci de treballs amb interseccions trnsit transversal, estrictament segons lorganitzaci de trnsit dels unitats organitzatives i residents al llarg del trnsit original. 7.4.2 etapes de construcci de moviment de terres de aquesta enorme quantitat de movim

20、ent de terres de lenginyeria, construcci sDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my com

21、pany 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementatio

22、n, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the batte

23、ry indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security me

24、asures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 mil

25、lion Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.

26、12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equiva

27、lent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -Th

28、e two management system for improvement. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines

29、, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspect

30、ion, safety production month, day supervision of production safety and the Olympic Games and other谢尔塔拉露天煤矿槽探工程 (一标http:/ 录一、工程延深计划及保证措施31、编制依据及原则31.1编制依据31.2编制原则32、工程概况32.1概况32.2气候条件错误!未定义书签。2.3工程特点33、总体施工组织布置及规划33.1现场施工组织33.2施工总体主导思想33.3现场施工准备工作34、施工进度安排34.1施工进度编制原则:34.2施工工期安排34.3施工进度安排34.4工期控制保证内容

31、、制度及措施35、施工方案、技术措施、施工工艺和方法35.1施工工艺35.2施工方案35.3采掘场供电系统35.4采场防排水35.5煤层顶板重点工程施工措施35.6雨季生产措施3二、主要施工机械设备配备31、工程的主要机械设备32、工程的主要办公设备、通信设备及交通设备32.1办公设备、通信设备32.2交通设备3三、工程质量保证体系及保障措施31、质量保证内容32、质量保证制度33、质量保证措施3四、安全目标、安全保证体系及保障措施31、安全保证目标32、安全保证制度33、安全预案34、安全保证措施35、与施工方案有关的安全措施3五、劳动力、主要材料计划及保障措施31、劳动力组织计划32、主要

32、材料计划及保障措施3六、文明施工、环境保护、草原防火、 31、施工环保、水土保持措施32、文明施工 33、草原防火保证措施3七、工程投入的主要施工机械设备情况说明及进场计划3laparici de tot tipus de casos, la caiguda daccident de sha produt. (9) on la feina nivells sense operacions de installacions de protecci de seguretat, treballadors de la construcci han de dur un cintur o arnesos

33、de seguretat (dispositius de protecci de seguretat sha comprovat abans del seu s), el cintur de seguretat o cordes de seguretat utilitzats han de complir els principis dalta i baixa. No hi ha deures don ls de productes de protecci, per evitar accidents de caiguda passi. 6, prevenci dintoxicacions, a

34、sfxia accident les mesures preventives per evitar lenverinament, millor protecci de la seguretat i la salut dels treballadors, les mesures es formulen. (1) quan la profunditat de la pila s ms de 5 M, el dia abans de linici de ls detector de gas per a la detecci de gasos txics, confirmar que el gas d

35、ins del forat correctament, abans dobra menor; ha de tenir 15min noms desprs de la voladura de fum forat es permeten les operacions. (2) lalberg est estrictament prohibit en lemmagatzematge de substncies txiques i qumics. (3) s interior lestabliment independents Calefacci, no fan de flama oberta den

36、llumenat, Calefacci, per evitar accidents que requereixen denverinament de monxid de carboni independents de lhabitatge Cambra climatitzada amb foc de carb, estufes ha de ser situats a lexterior. (4) al menjador de lautoritzaci de sanejament, personal de cuina ha de tenir un certificat de salut i ce

37、rtificat mdic per treballar. Botiga daliments crus i cuinats ha de ser processat per separat. for safety and security, set up security groups, head of the work group is responsible for the operations of safety and security, each team full-time safety officer is responsible for the daily life and pro

38、duction security. 成 . Good dining, on the implementation of special detection system for procurement of food, preventing the purchase of spoilage and poisonous food to prevent food poisoning accident occurred. Pay attention to personal and environmental hygiene, to beautify the environment, clean ai

39、r, beautiful life, environment, prevent the spread of infectious disease epidemics and ensure attendance to ensure production safety. 8.4.4.4 from management to ensure safety punishment detailed rules for the implementation of a safety. To comply with policies, laws and regulations, observe labour d

40、iscipline, according to safety regulations and technical specifications for construction requirements for the construction, maintenance of production and life order, maintain social order there is significant merit in team and individual Award respectively; otherwise, penalties, to ensure production

41、 safety. 8.4.4.5 construction site safety protection 1) temporary facilities security protection a. construction of establishing traffic signs and lighting, vehicle and pedestrian traffic safety. B. underground structure within the construction site, the underground pipeline,un procs clau, principal

42、ment per lexcavaci subgrade. Latrun pel poble cam les condicions del trnsit abans que comenci la construcci de dos carretera pioner. Una secci de construcci (secci XI) se centren en Latrun quin K0 + 440 Hill Road a la vorera, secci b construcci (secci est) es va centrar en Latrun K1 + 480, K1 + 840

43、Hill Road a les voreres del Yangtze. Vorera Latrun obert moviment terra superfcie de treball, parallela a les operacions superfcie de treball, segons el cabal de disseny del sistema de drenatge, de seguir el principi de drenatge de construcci de moviment de terres incrustaci de codi a la caixa de la

44、 carretera. 7.4.3 canonades de desgus establerts en letapa de construcci i moviment de terres caixa integrat estretament de la carretera, intercalades amb la construcci. Segons els principis i matries abans que siguin originals, des subgrade excavaci al tanc de cam, abeurador de desgus, formaci subg

45、rade, drenatge es poden formar, segmentats flux. 7.4.4 carretera base i superfcie capa construcci etapa carretera base pargraf de construcci Enginyeria dividit localitzaci amb enginyeria drenatge com, tamb dos punts dun pargraf de construcci per segment secci de punts per a la construcci dorganitzac

46、i daigua parallels: els principis de secci completa dut a terme la construcci, en general direcci construcci de drenatge canonada completat direcci avan construcci, estrictament segons subgrade creu secci i la lnia de pendent per a la construcci de control, construcci Enginyeria drenatge Hou, Groove backfill a, subgrade amb segents formant una. Segons aquest pensament amdues cares constant aven de la construcci fins a la base difusi. Arranjaments dimplementaci dacord amb els principis dorganitzaci de la se

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1