ud荣昌县中优园工程施工组织设计(标后).doc

上传人:本田雅阁 文档编号:2137422 上传时间:2019-02-20 格式:DOC 页数:142 大小:628.01KB
返回 下载 相关 举报
ud荣昌县中优园工程施工组织设计(标后).doc_第1页
第1页 / 共142页
ud荣昌县中优园工程施工组织设计(标后).doc_第2页
第2页 / 共142页
ud荣昌县中优园工程施工组织设计(标后).doc_第3页
第3页 / 共142页
亲,该文档总共142页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《ud荣昌县中优园工程施工组织设计(标后).doc》由会员分享,可在线阅读,更多相关《ud荣昌县中优园工程施工组织设计(标后).doc(142页珍藏版)》请在三一文库上搜索。

1、King shop school car to watch the summary view store is located in the LAN-Xin railway, 215 students, and students to and from school has about 90 people to cross the railway, more than half of the students live in the school in the vicinity of the rail line along the railway more than 10 square kil

2、ometers. Railway is economy of artery, to makes railway along general people master railway legal regulations and security knowledge, enhanced love road watch consciousness, ensure railway security smooth, years, I school has been put love road watch work as education students of focus to caught, ma

3、de has significantly of effect, years no occurred had railway security accident, emerged out a and a love road watch small guard, General teachers and students and masses of love road watch consciousness General improve, times by superior recognition, Our practices are reporting on is as follows. An

4、d improve the Organization, love the way of protection responsibilities. Set up by the principal of the school is the head security administrator for the Deputy Head of the class teacher for members of the railway protection leading group for propaganda and education, consisting of offices, advocacy

5、 groups, education groups and steering groups, organizations responsible for railway protection publicity and education of the whole school, command and coordination. To ensure safety of the railway for the overall objectives, major tasks are: 1, arouse the enthusiasm of teachers, school advantages

6、into full play, watch the propaganda and education work of joint railway. 2, railway watch teacher and student awareness, to ensure against road-related casualties. 3, education in primary and middle school students the courage to fight against the Railway Safety Act and found to have damaged railwa

7、y safety relevant parts of the report in a timely manner to ensure railway safety. Do Division, responsibility and student teacher assessment, evaluation and love road linked to the protection and safety, enhance the sense of responsibility. Second, programming, watch love road work routine. School

8、developed has railway watch publicity education work programme, put love road watch work into school education teaching plans, full using class teaching, and theme class, timing, education students learning railway method, about love road security matters, school requirements daily of campus broadca

9、st to has five minutes of railway security knowledge education, all class weekly are to Shang a section love road watch aspects of security class, monthly introduced a period love road watch aspects of window publicity, reached has alarm ringing of effect. Third, explicitly demanded that the love ro

10、ad protection work. Schools to establish and improve a love road watch schedule, enacted the railway safety ten no Protocol, the Convention on the safety and other regulations and requirements, so as to enable departments to further their work. Which publicity group is responsible for railway watch

11、legal regulations and about common sense of publicity, annual organization a to two times above railway method, and security management Punishment Ordinance, for main content of publicity, further strengthened General teachers and students of concept and love road watch consciousness, education stud

12、ents do three not: that not to railway Shang play, without stones, hit train, is not rail Shang stacked roadblocks. Education groups to include railway protection knowledge education in carrying out quality education, class of railway transport in the main channel of textbooks in economic constructi

13、on in the role and significance of guiding students to take care of the railway目 录第一章 编制说明1第 1 节 编制说明1第 2 节 编制范围1第 3 节 编制依据2第二章 确保工程质量的技术组织措施4第 1 节 建立质量管理机构4第 2 节 工程质量保证体系4第 3 节 技术保证措施6第 4 节 原材料质量保证措施8第 5 节 计量保证措施10第 6 节 结构阶段质量控制措施102.6.1 基础工程102.6.2 模板工程112.6.3 钢筋工程112.6.4 砼工程122.6.5 砌体工程的质量控制14第 7

14、 节 屋面工程的质量控制14第 8 节 装饰阶段质量控制措施152.8.1 装饰工程的质量控制152.8.2 质量通病的预防15第 9 节 建立质量回访维修制度18第三章 确保安全生产的技术组织措施19第 1 节 施工安全管理19第 2 节 施工现场的安全要求20第 3 节 安全用电管理措施21第 4 节 现场保卫治安安全措施21第 5 节 施工现场消防安全措施22第 6 节 施工现场机械设备安全措施22第 7 节 施工现场用电安全措施23第 8 节 建筑施工安全措施23第 9 节 架子工程安全措施25第四章 确保文明施工的技术组织措施及环境保护措施27第 1 节 创建文明工地的目标27第 2

15、 节 文明工地管理体系的建立27第 3 节 认真搞好场容场貌27第 4 节 进场材料堆放规范化28第 5 节 生产区文明施工管理29第 6 节 生活区文明工地管理30第 7 节 环保措施30第五章 确保工期的技术组织措施34第 1 节 搞好施工前的准备34第 2 节 加强施工过程中的管理措施35第 3 节 加强资源管理及技术保证36第六章 施工方案及项目经理部组成人员38第 1 节 工程概况386.1.1 建筑设计概况386.1.2 结构设计概况40第 2 节 施工段的划分41第 3 节 主要工序施工流向的安排41第 4 节 基础施工43第 5 节 主体施工466.5.1 钢筋工程466.5.

16、2 模板工程536.5.3 砼工程676.5.4 砌体工程76第 6 节 脚手架工程80第 7 节 屋面防水工程85第 8 节 装饰装修施工886.8.1 抹灰工程886.8.2 楼地面工程926.8.3 外墙面砖的镶贴946.8.4 内墙涂料96第 9 节 安装工程施工976.9.1 给排水工程施工方法976.9.2 电气工程施工方法108第 10 节 冬雨季施工措施1166.10.1 雨季施工措施1166.10.2 冬季施工措施118第 11 节 项目经理部组成人员1196.11.1 施工组织结构的建立1196.11.2 施工组织结构框图1206.11.3 施工组织机构的启动与高效1206

17、.11.4 施工组织机构高效运作保障措施122第 12 节 项目经理部的协调管理122第七章 施工机械配备和材料投入计划126第八章 施工进度表或施工网络图129第 1 节 指导方针129第 2 节 组织部署129第 3 节 施工进度130第九章 劳动力安排计划及劳务分包计划131第 1 节 劳动力的实施131第 2 节 劳动力计划表131第 3 节 劳动力组织和管理的关键环节132第十章 施工总平面布置图134第 1 节 施工现场临时道路134第 2 节 机械设备的布置134第 3 节 施工用电135第 4 节 施工现场临时用水135第 5 节 施工现场平面布置图136第十一章 新技术、新产

18、品、新工艺、新材料应用137Establishment of the patriotic Health Committee, the implementation of Division of responsibility, school of health management. , Room, group, grade school health work of grass-roots organizations, is responsible for the Department of health management. All classrooms, offices and othe

19、r indoor sanitation, daily cleaning, keep the floor, table, wall clean table, cupboards, chairs and all the appliances in order and clean. No graffiti, doors and Windows and bright. Lectern, Blackboard in the classroom clean and tidy. School sanitation, according to the Division of school health are

20、a of responsibility, responsibility to do: a small sweep a day a week a big sweep, neat and clean, no paper, no spam, no weeds, no sewage, no bags, no Peel. Personal hygiene: education students to cultivate five, six nots personal hygiene habits. Five: time schedule, to brush your teeth before going

21、 to bed, to change clothes, bathe, and frequently washing hands before meals and after nails Barber,. Six not to drink unboiled water, do not eat unclean food, no smoking, no spitting, no snacking, no public towels, cups. Pay attention to eye health, read and write positions lying upright, not readi

22、ng, not in the light of local walking and reading, doing eye exercises and timely correction of eye disease, regular rotation zuoci. Gym class, working class, to strengthen students safety education, comprehensive physical examination once a year on students, included in the profile. Improving food

23、hygiene: to improve sanitation and hygiene, implementation of the food hygiene regulations, to ensure food hygiene, ensure the physical and mental health of teachers and students. Eliminating four pests, preventing disease: promptly clean up the garbage, sewage, preventing mosquito breeding places,

24、cleaned up the garbage, make sure and clean. Strengthen health publicity poster out in time to publicize health knowledge, use of the health education health education to students. And eye exercises, mental health education during the consultation process, held in common, multiple lectures on epidem

25、ic prevention. Health inspection rating system: head teacher, classroom teacher, Member of the class of health checks, monitor the implementation of environmental health and eye exercises every day. Check rankings of school organizations to inform the inspection results. Check every Monday, one mont

26、h, one to summarize, according to the inspection results issued health flow red flags. Six disease prevention to prevent myopia? When sitting up, head tilted, eyes 33 cm from the book. Eat, walk, bus reading, not too strong, too weak to light reading. Write not too small too close, do not write typo

27、, grass hand. Reading time and a half to 1 hour, you should rest for a few minutes. Controlling the number of TV and time, a distance of 2.5 metres. Pay attention to nutrition, food supplements containing vitamin a. How to prevent tooth decay? To develop good hygiene habits, way of brushing our teet

28、h, mouthwash, before going to bed without eating snacks. Improve the ability of anti-caries of the teeth, acid toothpaste with fluoride. Eat less sugar, eat a lot of food to prevent tooth decay, such as milk and dairy products, fish, fruit, beans, liver, etc. How to prevent trachoma? Without common

29、towels, hand rubbing your eyes, to sand and dust, wash your face to clean the water, promote the use of flowing water to wash, maintain washing equipment clean and wash, cut your nails第一章 编制说明第 1 节 编制说明一、本投标施工组织设计严格按照工程招标范围和招标文件对施工组织设计的要求进行编制。在人员、机械、材料调配、质量要求、进度安排等方面统一部署的原则下,由土建、安装二大专业组成。二、根据本工程设计特点

30、、功能要求,本着对业主资金合理利用,对工程质量的终身负责,以“科学、经济、优质、高效” 为编制原则。三、我公司对此次施工组织设计的编制高度重视,召集了参加过类似工程施工、有丰富管理及施工经验的人员,在仔细研究图纸,明确工程特点、充分了解施工环境、准确把握业主要求的前提下,成立编制专题小组,集思广议、博采众长,力求本方案切合工程实际,思路先进,可操作性强。第 2 节 编制范围还建区1#楼(包括裙楼商铺)的图纸、工程量清单及招标文件规定的内容,其中不包括:一、土建部分:由招标人指定分包1、桩基工程(含凿桩头、桩间土开挖及外运)2、土方大开挖工程(含基坑普探)3、所有门窗4、外墙外保温二、安装工程1

31、、电梯、天然气工程由专业公司施工。2、对讲、电视、电话、综合布线、消防联动控制及火灾自动报警的穿线及设备安装工程由专业公司施工3、甩项内容:人防安装工程(包括人防通风系统、人防给水系统、人防通风和人防给水配套的电气)第 3 节 编制依据一、文景嘉园一期工程(以下简称本工程)招标文件。二、本工程设计图纸及招标答疑。三、我公司的技术、机械设备装备情况及管理制度。四、国家和行业现行的施工及验收规范。GB503002001建筑工程施工质量验收统一标准GB502022002建筑地基基础施工质量验收规范GB502032002砌体工程施工质量验收规范GB502042002混凝土结构工程施工质量验收规范GB5

32、02072002屋面工程施工质量验收规范GB502082002地下防水工程施工质量验收规范GB502092002建筑地面工程施工质量验收规范GB502102001建筑装饰装修工程施工质量验收规范GB502422002建筑给水排水及采暖工程施工质量验收规范GB502432002通风与空调工程质量验收规范GB503032002建筑电气安装工程施工质量验收规范五、2009年陕西省建设工程工程量清单计价规则、陕西省建筑装饰工程消耗量定额、陕西省安装工程消耗量定额及其配套有关文件。重庆恒滨建设(集团)文景嘉园项目部 137第二章 确保工程质量的技术组织措施第 1 节 建立质量管理机构公司坚决贯彻“百年大

33、计、质量第一”的方针,牢固树立“预防为主”的思想。在施工过程中,通过各种形式,加强对参建职工的教育,不断提高工作责任心和质量意识,对质量问题坚决执行“三不放过”和一票否决制度,精心组织、精心施工,确保工程质量合格。建立以公司总工程师为首的质量管理体系,全面控制施工项目的工程质量。为了充分发挥质量管理体系的作用,保证工程合格,协调公司部门与项目经理部的关系,成立公司领导、项目有关人员参加的本工程施工质量控制小组,参与质量程序的控制。第 2 节 工程质量保证体系按照GB/T19001ISO9001质量保证标准,编制详细的、全面覆盖19个质量要素的控制方法及措施,保证各影响质量的要素在施工过程中得到

34、有效控制。GB/T19001ISO9001质量保证标准控制网络图见下页所示:管 理 评 审(QB/EJJZQM1)内部质量体系审核(QB/EJJZQM17)回 访 保 修(QB/EJJZQP19)合 同 评 审(QB/EJJZQM3)编写质量计划 (QB/EJJZQM2)文件和资料的控制 (QB/EJJZQM5)分承包方的选择 (QB/EJJZQM6.4)业主提供产品的控制 (QB/EJJZQM7)采 购 (QB/EJJZQM6)检 验 和 试 验(QB/EJJZQM10)产品标识和可追溯性 (QB/EJJZQM8)检验和试验状态 (QB/EJJZQM12)过 程 控 制(QB/EJJZQM9

35、)检验、测量和试验设备的控制(QB/EJJZQM11)不合格品的控制(QB/EJJZQM13)纠正和预防措施(QB/EJJZQM14)搬运、贮存、包装、防护和交付(QB/EJJZQM15)质 量 记 录 的 控 制(QB/EJJZQM16)统 计 技 术(QB/EJJZQM20)培 训(QB/EJJZQM18)特殊过程的质量控制机电设备管理控制文明施工管理控制安全生产管理控制第 3 节 技术保证措施一、施工前,技术负责人组织工长、内业、质安员认真学习有关规范,施工工艺及操作规程,熟悉图纸,做好图纸会审工作,有针对性的编制施工组织设计。二、针对该工程的大面积地下室、地下室防水、屋面防水、清水砼等

36、施工难点,建立QC小组,制定详细的施工工艺流程卡,严格按卡施工,确保工程质量。三、严格按图施工。凡因施工或业主要求变更的,必须办理设计变更通知或核定单,经设计单位同意后,才能施工。四、严格技术复核制度。轴线、标高测量员施测后,应由工长、质量员复核无误后,才能在建筑物上作出标记。隐蔽工程应由监理公司、业主等共同检查合格签字后,才能进入下一道工序。五、技术负责人要经常检查各种记录、报告,发现问题及时处理。内业员要整理好各种资料,工长作好施工日记,现场施工管理和各种施工技术资料全部采用计算机管理。六、装修工程坚持做好“样板间”,包括釉面砖排版,色彩协调、天棚作法、管线安装、门窗安装等全部装修内容,待

37、检查合格,业主、设计监理满意,施工人员参观学习后,再全面展开装修工作。七、最大限度地提高施工机械化程度,加大科技含量,发挥公司的技术优势,充分利用新工艺新技术和新材料,选用先进、合理、经济的施工方案,提高施工的科技水平,确保多、快、好、省地完成业主交给的施工任务。八、作好施工技术档案的收集、整理科技档案一览表土建施工文件资料:序号文件名称责任人1施工合同书公司法人2开工报告书项目经理3技术交底、图纸会审纪要内业技术员4施工组织设计或施工方案项目技术负责人5设计变更通知单、核定单内业技术员6原材料出厂质量证明书材料员7原材料试验报告试验员8施工定位测量记录测量员9主体工程隐蔽记录工长10单位工程

38、、分部、分项工程检验批验收记录及质量事故处理报告质量员11交工验收证明书内业技术员12施工总结、技术总结项目技术负责人13竣工报告(含停、复工报告)项目经理14施工日志、大事记工长竣工图序号文件名称责任人1土建建施竣工图土建内业技术员2土建结施竣工图土建内业技术员3安装专业竣工图安装内业技术员第 4 节 原材料质量保证措施一、 材料采购程序:库存盘点发料申请计划审核批准Y检验、入库、保管YN合格供应厂(商)考察、评估进货检验和试验选定、签定合同采购N退 货在采购控制过程中,合格供应(厂)商的评估,要求首先要以质量为前提,尽可能优先选择生产技术完善、质量稳定、可靠、生产能力强的供应(厂)商,尽可

39、能直接从生产厂进货,减少中间环节,避免购入假冒伪劣产品,进货检验和试验时,材料人员会同质检人员先对材料的外观、几何尺寸、技术证件、数量进行验收,并及时通知试验人员抽取样品进行有关试验,试验合格后方可发料用于工程,每批材料都要求材料部门和试验部门妥善记录、保存有关检验和实验的有关证件,并在材料标识上标识清楚;对所有合格供应(厂)商均实行动态管理,定期总结各协助单位的业绩,对于业绩不良或发生事故的单位坚决从合格供应(厂)商名录中予以剔除,取消其被采购权。二 、 顾客提供产品的控制:顾客提供产品进货检验和试验N发料检验、入库、保管Y三、产品标识和可追溯性:对于无论是采购的、顾客提供的或者是自己加工的

40、原材料、成品、半成品,均要进行唯一性标识,标识采用全公司统一标识牌和记录两种方法,内容包括产品的规格、型号、批号、(炉号)、等级、数量、生产日期、所用部位,对施工产生的产品还应标明生产班组、原材料来源及其相关的技术证件,以便使产品具有如同身份证一样的识别标志,而不致发生混用、误用,并且当一旦发现不合格品后,能通过标识可以追踪到该产品的原始状态、生产过程和使用情况,以便查找不合格产生的原因,采取相应的纠正预防措施,如我公司对钢材的标识牌如下图:名称: 型号:批号: 炉号:等级: 生产厂:生产日期: 使用部位: 检验、试验状态:第 5 节 计量保证措施1、严格执行公司的计量检测网络。2、砼、砂浆、

41、钢筋焊接接头由内业员按规范要求提出取样计划,由试验员取样送试验室检验,不合格不得使用。3、经纬仪、水准仪、台秤等计量工具由项目技术计量工长负责按规定送法定检验单位检校。第 6 节 结构阶段质量控制措施2.6.1 基础工程1、基础工程的钢筋、模板、砼分项工程应遵守主体工程的钢筋、模板、砼工程的质量控制措施。2、作好基坑排水,防止地面水流入基坑,以避免在有积水、泥浆的情况下施工砼。3、绑扎钢筋时,按设计留足保护层,不得有负误差。应用大理石垫块,严禁使用钢筋当垫块或将钢筋用铁钉、铅丝直接固定在模板上。2.6.2 模板工程质量控制措施进行技术交底:交图纸、交方法、交规程、交标准。每次支模前,应对模板材

42、料验收,不符合要求的应更换或修复,不能滥竽充数。班长、工长、自检员应随时对支模操作进行检查,发现问题及时纠正。完工后,质检员组织工长、班长、自检员进行检查验收,合格后再转入下道工序。质量控制要点构件中心线、标高。模板的安装质量,包括刚度、强度和稳定性。模板的平整度、垂直度、截面尺寸、标高、接缝严密情况以及预埋件、预留洞的位置。2.6.3 钢筋工程质量控制措施检查出厂质量证明书及进场复检报告,证明进场材质合格。加强对施工人员的技术交底,使其执行施工规范要求和设计要求。严格按照图纸和配料单下料和施工。楼板钢筋施工前,应预先弹线并检查基层的上道工序质量,加强工序的自检和交接检查。对使用的机具应经常检

43、测和调整。焊接人员必须持证上岗,正式施焊前必须按规定进行焊接工艺试验,同时检查焊条、焊剂的质量,焊剂必须烘干。焊接钢筋端头不整齐的要切除,焊后夹具不宜过早放松。根据钢筋直径选择合理的焊接电流和通电时间。每批钢筋焊完后,按规定取样进行力学试验和检查焊接外观质量,合格后,才能进行绑扎。钢筋工程质量控制的要点钢筋的品种和质量。钢筋的规格、形状、尺寸、数量、间距。钢筋的锚固长度、搭接长度、接头位置、弯钩朝向。焊接质量。预留洞孔及预埋件规格、数量、尺寸、位置。钢筋保护层厚度及绑扎质量。严禁踩踏和污染成品,浇砼时设专人看护和修整钢筋。2.6.4 砼工程砼质量控制措施检查原材料出厂合格证及试验报告,必须保证

44、各项材料指标的稳定性。浇筑前应检查钢筋位置和保护层厚度,注意固定垫块,垫块位置必须合理,分布均匀。下料一次不得过多,自由倾落高度一般不得超过2m,应分层捣固,掌握每点的振捣时间。预留洞处应在两侧同时下料,采用正确的振捣方法,严防漏振。为防止钢筋移位,振捣时严禁振捣棒撞击钢筋,操作不得踩踏钢筋,以免模板变形或预埋件脱落。砼浇筑后12小时内覆盖浇水养护,在砼强度达1.2Pa后方可在已浇筑的结构上走动。大体积砼浇筑时应根据工程特点采用分段分层浇筑方法,控制浇筑厚度,超过2m应加串筒,溜管等,结合层浇筑要细致振捣,特殊情况时预留后浇施工缝。砼工程质量控制的要点包括水泥的品种、标号和砂、石、外加剂的质量

45、。应重点控制商品砼坍落度和进场、运输时间。浇筑时应重点控制浇筑高度和振捣棒插入间距、深度、顺序。2.6.5 砌体工程的质量控制墙体砌筑的各种材料要符合设计要求。墙体采用的非承重空心砖和机制红砖在砌筑前要提前12天浇水湿润,确保空心砖和机制红砖的含水率分别为1015和58。基层表面如有局部不平,高差超过30mm处应用15以上的细石砼找平后才可砌筑。砌块墙底部应砌200mm高标砖,在梁、板下口应用标砖斜砌挤紧,斜度为60度,砂浆应饱满。空心砖墙中不够整块空心砖的部位应采用标砖来补砌,不得用砍过的空心砖填补。框架维护墙和内隔墙,墙高大于4.0m时,在窗顶或墙中每隔3m设置构造圈梁。严格按图纸要求设置

46、构造柱。墙体与柱沿墙体高度每500mm设置26.5墙体拉结筋。构造柱浇筑砼时要清理干净砖面和柱底的落灰、碎石、木屑等杂物。第 7 节 屋面工程的质量控制屋面工程施工前,进行图纸会审,掌握施工图的细部构造及有关技术要求,编制好作业指导书。向班组进行技术交底,包括施工部位、施工顺序、施工工艺、构造层次、节点设防方法、工程质量标准、成品保护措施及安全等。所有材料都应有材料质量证明文件并经指定的质量检测部门认证,确保其质量符合技术要求,进场材料按规定取样复试。找平层首先符合排水坡度和顺向,找平层达到规定干燥后才能铺贴卷材防水层。在低温下不宜施工并应避免高温烈日下施工。在屋面拐角、天沟、水落口、屋脊、卷材搭接收头等节点部位,必须仔细铺平贴牢、压实、收头牢靠,符合设计要求和屋面工程技术规范等有

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1