《current state of the horizontal directional drilling 》.ppt

上传人:本田雅阁 文档编号:3045472 上传时间:2019-06-29 格式:PPT 页数:63 大小:6.71MB
返回 下载 相关 举报
《current state of the horizontal directional drilling 》.ppt_第1页
第1页 / 共63页
《current state of the horizontal directional drilling 》.ppt_第2页
第2页 / 共63页
《current state of the horizontal directional drilling 》.ppt_第3页
第3页 / 共63页
《current state of the horizontal directional drilling 》.ppt_第4页
第4页 / 共63页
《current state of the horizontal directional drilling 》.ppt_第5页
第5页 / 共63页
点击查看更多>>
资源描述

《《current state of the horizontal directional drilling 》.ppt》由会员分享,可在线阅读,更多相关《《current state of the horizontal directional drilling 》.ppt(63页珍藏版)》请在三一文库上搜索。

1、,HDD Market in China,Current State of the Horizontal Directional Drilling Market: China and the United States Dr. Samuel T. Ariaratnam Arizona State University, USA Chengdu, China October 22-24, 2015,ICPTT 2015,Welcome to Sichuan Province,AGENDA,1. 13th Annual China HDD Survey 2. China HDD Market An

2、alysis 3. 17th Annual U.S. HDD Survey,Inventor of HDD,Martin Cherrington,Part 1 13th Annual China HDD Survey,2045 New HDD Machines (2014),Sales for all HDD manufacturers decreased in the past year because of the low national economic growth. Based on the 13th Annual HDD survey, there were a total of

3、 2045 new HDD machines from 18 manufacturers that entered into the market. This is -20.5% compared with 2013 (2573).,New HDD Machines,Of the 2045 HDD machines, 537 (26.3%) were exported to other countries; mainly to the BRICS countries (Russia, India, Brazil and South Africa). As of 2014, there are

4、a total of 14,538 HDD machines in the Chinese market including 2805 HDD machines exported.,HDD Machines Sold in China,Size Range of HDD Machines,Large machines (over 500 kN pullback): decreased from 276 (10.7%) in 2013 to 179 (8.7%) including 50 Maxi machines (over 1000 kN pullback). Midi machines (

5、250 to 500 pullback): 1216 compared with 1256 in 2013, but its market proportion increased from 48.8% in 2013 to 59.5% in 2014. Mini machines (under 250 kN pullback): reduced greatly from 1041 (40.5%) in 2013 to 650 (31.8%).,Market Percent of HDD Machines (2014),HDD Machine Size Over the Years,12,Ag

6、e of HDD Machines,Less than 2 years old: accounts for 22.4% (3247) 35 years old: 34.6% (5035) 610 years old: 33.2% (4831) Over 10 years old: 9.8% (1425).,Age of HDD Machines (2014),Concentration Ratio of HDD Machines,The 1st Place: Accounts for 22.6% (462 units) The top three: 50.1% (1126 units) The

7、 top five: 78.6% (1607 units) The top ten: 95.0% (1942 units),Concentration Ratio of HDD Machines (2010-2014),Features of HDD Machines,The demand for HDD machines is still strong in China because of the great engineering construction and the large geographical territory. Midi HDD machines are the ma

8、in machines used in China because of their range of applications. Besides the Commonwealth of the Independent States, Southeast Asia and South America, HDD machines were also exported to Africa and Eastern Europe. The vast majority of HDD Machines are manufactured by the top ten among more than 30 C

9、hinese manufacturers.,Summary of Chinese HDD Machines,A total of 2,045 new HDD machines entered the market in 2014 537 (26.3%) were exported to other countries Market consists of Mini (59.5%), Midi (31.8%) and Large (8.7%) HDD rigs Both the municipal pipeline construction and energy sector are conti

10、nuing to increase,Part 2 China HDD Market Analysis,Why China?,Fastest Growing Country in adopting Trenchless Technology Methods Energy Infrastructure Construction Is Vast & Has Resulted In Record Breaking HDD Installations. Chinese Drill Manufacturers Have Become Increasingly Competitive In The Glob

11、al Market. By the End of 2015, China Plans To Triple Its Natural Gas Pipeline Network To 62,100 Miles & Construct 12,000 Miles Of Oil Pipelines,Brief History,2001: China Enters the World Trade Organization 2002: Work Begins on the West-to-East Pipeline 01-06: Annual GDP Growth of Nearly 10.0%. Total

12、 Energy Consumption Grows by 71.5% 2005: China Consumes 14.7% of Total World Energy 2008: China Initiates $586 Billion USD Stimulus 2009: China Surpasses US in Energy Consumption 2040: It Is Estimated That Chinas Energy Needs Will More Than Double,20,21,Municipal Pipeline Construction,By 2013, the u

13、rbanization rate was only 36% by city household population, which is not only much less than the average level in developed countries, but also lower than the rate in some developing countries. According to the New National Urbanization Plan (2014-2020), the urbanization rate will be 45% in 2020. Th

14、ere is a lot of urban infrastruture facilities to be constructed including underground pipelines in the next five years.,By 2015, the census on underground pipeline will be finished and its information system will launched. In five years, all old (especially over 50 years) and seriously damaged pipe

15、lines will be rehabilitated or replaced; pipelines for wastewater and stormwater will be constructed or reformed; cables for city electricity, lighting, communication and fiber-optic network etc. will be improved. In ten years, a comprehensive urban underground pipeline system will be set up.,Pipes

16、Installed from 2001-2013 (km),Pipes (104km) Installed by Decade,Gas Pipes Installed in Cities (km),Natural Gas Pipeline Construction,The construction of natural gas pipelines still lags behind developed countries. In order to solve the energy shortage problem and improve the urban environment, many

17、gas pipelines will be installed in the future. (1) From the total length, there were only 60,000 km of gas pipelines installed through 2013, which is less than 1/8 of the 490,000 km installed in U.S.,(2) From the construction speed, the total length of gas pipelines increased from 14,800 km in 2002

18、to 25,500 km in 2007 (2,100 km installed each year); however, it increased from 28,100 km in 2008 to 60,000 km in 2013 (6,300 km installed for every year). (3) From an energy consumption structure, natural gas accounted for only 5.1% in 2013, which is far less than 23.7% of the world average and 29.

19、6% in U.S.,According to the Energy Development Strategic Action Plan (2014-2020), natural gas will account for 10% of the energy consumption structure by 2020. Construction speed will increase in the next five years. The total pipeline length for natural gas will reach 120,000 km in 2020 (more than

20、8,000 km will be installed annually) . Presently, four main natural gas pipelines with a total length of 16,000 km are either under construction or will be constructed.,CNPC,China National Petroleum Corp. (CNPC) Primary operator of energy pipelines in China including 67% of all crude oil, 77% of all

21、 natural gas & 48% of all refined products pipelines in China. Internal Stakeholder Organization: CNPC Acts as Designer, Engineer, Contractor, Inspector, & Operator for most pipeline construction.,Four Main Natural Gas Pipelines Under Construction,32,32,XIAN,SHANGHAI,BEIJING,LUNNAN,HORGOS PORT,WUHAN

22、,NANCHANG,GUANGZHOU,33,No. 4 ShanxiBeijing Natural Gas Pipeline,With a total length of 1468 km, this pipeline includes one main, five branch mains, and two branch pipelines. The length and diameter of the main pipelines are 1066 km and 1219 mm respectively. Five branch main pipelines have a total le

23、ngth of 360 km with diameters of 1016 mm or 1219 mm. The length of the two branch pipelines is 24.2 km (219.1 mm) and 17.8 km (323.9 mm.,Natural Gas Pipeline from Shanxi to Beijing,No. 4 West to East Natural Gas Pipeline,This pipeline, with a total length of 2454 km, passes Xinjiang, Gansu and Ningx

24、ia Along this pipeline, there 23 large river crossings with a total length of 22.29 km, 28 middle river crossings with a total length of 18.06 km, 20 tunnels through mountains with a total length of 17.653 km, 45 highway crossings, and 37 railway crossings.,Xinjiang-Guangdong Coal Gas Pipeline,This

25、pipeline includes one main pipeline (4929 km) and five branch main pipelines (3393 km) Covering 161 counties along 13 provinces and autonomous regions, the main pipeline begins at Yining in Xinjiang and ends at Shaoguang in Guangdong The total length and investment are greatly more than that of the

26、No. 3 West to East Natural Gas Pipeline,ChinaRussia Natural Gas Pipeline (East Line),This pipeline was constructed in Sept. 2014 in Russian terriorty and will be constructed this year in Chinese territory with completion in 2018. In Chinese territory, the total length is 3968 km from Heihe in Heilon

27、gjiang Province to Shanghai. It will be constructed in three sections: 1) North section; 2) Middle section; and 3) South section.,Natural Gas Pipeline from Far East Russia to China,Chinas Economy has Started to Slow Down Rising Personal Incomes Leads to Rapid Urbanization Higher Demand For Personnel

28、 Vehicles Higher Demand For Air Conditioners & Appliances The International Energy Outlook 2013 (IEO2013) Projection That World Energy Consumption Will Grow By 56 Percent Between 2010 & 2040. Much Of The Growth In Energy Consumption Occurs In China Where Demand Is Driven By Strong, Long-term Economi

29、c Growth.,Future Energy Demand,The Evolution of HDD Rigs Manufactured in China,2004,2006,2008,2009,2009,2009,2011,2012,2013,2015,2015,Huanghai Machinery Co. FDP 1000,Part 3 17th Annual U.S. HDD Survey,Average Bore Length,Age of Fleet,Summary of U.S. HDD Machines,A total of 2,525 new HDD machines ent

30、ered the U.S. market in 2014 Market consists of Mini (55.4%), Midi (30.4%), and Large (14.2%) HDD rigs Both the municipal pipeline construction and energy sector are continuing to increase; however, telecommunications will be the biggest increase,谢谢,Contact Information,Samuel T. Ariaratnam, Ph.D., P

31、.E., P.Eng. Professor & Construction Engineering Chair Arizona State University Immediate Past Chairman, International Society for Trenchless Technology School of Sustainable Engineering & the Built Environment Ira A. Fulton Schools of Engineering P.O. Box 873005 Tempe, Arizona USA 85287-3005 Tel +1 (480) 965-7399 Email: ariaratnamasu.edu,

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1