Generation EPLAN diagrams. User’s reference..pdf

上传人:小小飞 文档编号:3656840 上传时间:2019-09-19 格式:PDF 页数:67 大小:4.07MB
返回 下载 相关 举报
Generation EPLAN diagrams. User’s reference..pdf_第1页
第1页 / 共67页
Generation EPLAN diagrams. User’s reference..pdf_第2页
第2页 / 共67页
Generation EPLAN diagrams. User’s reference..pdf_第3页
第3页 / 共67页
Generation EPLAN diagrams. User’s reference..pdf_第4页
第4页 / 共67页
Generation EPLAN diagrams. User’s reference..pdf_第5页
第5页 / 共67页
亲,该文档总共67页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《Generation EPLAN diagrams. User’s reference..pdf》由会员分享,可在线阅读,更多相关《Generation EPLAN diagrams. User’s reference..pdf(67页珍藏版)》请在三一文库上搜索。

1、We reserve all rights in this document and in the information contained therein. Reproduction,use or disclosure to third parties without express authority is strictly forbidden. ABB (Hong Kong) Limited; 2005 External doc. no. Based on Project Prep. ATPA / 2005/10/27Customer Appr. ATPA / Narendra Gup

2、ta 2005/10/27Proj. no. Doc. kind Doc. des. Ref. des. Title Generations EPLAN Diagrams Users Manual Resp. dept ATPA Doc. no. Lang. Rev. ind. Page 1 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 FILE: EPLAN Users Guide.doc; TEMPLATE: Techn_Doc_Deliv_P.dot A; SKELETON: ; SAVEDATE: 11/29/2

3、005 10:54:00 AM Generation EPLAN diagrams. Users reference. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 2 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 REVISION Rev. ind. Page (P) Chapt. (C) Description Date Dept./Ini

4、t. A ALL First Issue 2005/10/27 Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 3 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 TABLE OF CONTENTS Generation EPLAN diagrams. Users reference.1 1. EPLAN Installation4 1.1 Rem

5、ove EPLAN and EAS software5 1.1.1 Remove EAS5 1.1.2 Remove EPLAN6 1.2 Install EPLAN.7 1.3 Install the Crack for EPLAN.10 1.4 Addition files for EPLAN.10 1.5 Necessary installation for UI Tool.12 1.6 Create the folder structure for working with EPLAN14 1.7 Install EPLAN Automation software (EAS)15 1.

6、8 Install last update for EAS.18 2. Generation EPLAN diagrams for MCC.24 2.1 Step 1. Prepare M 14 SignalsInput ofQuantity ModulesInput ofQuantity = Where ; 2 -Module) of Inputs ofQuantity (41 = 2 is reserved inputs. Round off result to integer of a maximum value. For Ouput Modules: ; 7 SignalsOutput

7、 ofQuantity ModulesOutput ofQuantity = Where ; 1 -Module) of Outputs ofQuantity (7 = 1 is reserved outputs. Round off result to integer of a maximum value. Quantity of Station: ; 12 ModulesInput ofQuantity ModulesOutput ofQuantity Station ofQuantity + = Round off result to integer of a maximum value

8、. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 39 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Push right button of mouse on the MCC sign, and add the User Cubical. Give RB name for it. Doc. kind Project Customer Titl

9、e Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 40 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 In the RB division, add counted quantity of I/O Stations. Set addresses of Stations. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manu

10、al Proj. no. Doc. no. Lang. Rev. ind. Page 41 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Add necessary I/O modules to the created stations. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 42 ABB (Hong Kong) Limited 3BC

11、N1 XXXXX XXXXX En A No. of p. 67 Go to Functions bookmark. Distribute all I/O signals from list to I/O modules. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 43 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Update the d

12、ata base on the Update bookmark. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 44 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 2.4 Step 4. ConfiguratorStart. Start “ConfiguratorStart” again. Choose from ABB Menu/Genera

13、te E-Plan Excel for MCC. Set path to data base. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 45 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Select output Eplan_MCC_Output.xls file. Save after that. Can close “Configu

14、ratorStart”. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 46 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 2.5 Step 5. EAS. Start EAS Tool. Choose “Read Data” in the menu. Make settings in the appeared window: For Gene

15、ric Functions MCC, for Input File Path path to Eplan_MCC_Output.xls file. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 47 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Choose “Output” in the menu. All settings are show

16、n for the appeared window on the following picture. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 48 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 The created SLD (Single Line Diagram) and CD (Circuit Diagram) projects

17、in the Eplan are result of work of all actions. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 49 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 3. Generation EPLAN diagrams for Drives. Doc. kind Project Customer Title Ge

18、nerations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 50 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 3.1 Step 1. Prepare M&C List. The same as for MCC. 3.2 Step 2. ConfiguratorStart. Start “ConfiguratorStart.xls”. “ConfiguratorStart” includes macros. Push “Ena

19、ble Macros” button to enable these macros. Select Import Motor List of ABB Menu. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 51 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 It is necessary to rename Reference_MotorLi

20、st.mdb to MotorList.mdb. Select MotorList.mdb file in the own project. This file is template data base for project. Select prepared M&C list for own project. It is necessary to arrange elements of following window to order of fields of M&C list. If M&C List is standard, then press shown button. Doc.

21、 kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 52 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Press “NO” button. Enter number of revision of the M&C List and press “OK” button. If moving of data is successful from M&C list

22、 to MotorList.mdb data base then will see following window. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 53 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 In case doubling of rows, following window is shown. The red col

23、or indicates the duplicate records. Also Duplicate records are written in Error.log file. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 54 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Select Import Drive Size of ABB Me

24、nu. Select MotorList.mdb file in the own project. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 55 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Select Drive Size Report file (xls) Doc. kind Project Customer Title Gener

25、ations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 56 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 3.3 Step 3. UI Tool. Start Latest_UI_Jan25.exe file. Its name includes a date of latest changes (for example Jan25.exe). Choose of menu of this tool a Windows2 Dr

26、ives Push “Get DataBase” button. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 57 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Push “Get Functions” for loading of necessary data from the data base to UI Tool. Then, ent

27、er number of Drives node in “Enter Number” field of “Add Line Up” menu. Push “Create” button. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 58 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Result is created Drive node.

28、Set attributes of Drive node. Then, Save. Select in “Add Cabinet” field :1) Type of cabinet 2) number of Cabinets in conformity with Drives Overall Dimension Layout (X7300). Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 59 ABB (Hong

29、Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 60 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Distribute the drives into created cabinets in conformity with Drives Over

30、all Dimension Layout (X7300). Distribution is made as follows: go at “Functions” bookmark, choose necessary cabinet at Drive bookmark, choose corresponding drives for its. Push “Attach Functions” button. After that, selected modules are moved to selected cabinet. Doc. kind Project Customer Title Gen

31、erations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 61 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 62 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En

32、 A No. of p. 67 Result of distribution is shown on the following picture. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 63 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 After that, go to Update bookmark and Update the d

33、ata base. If Updating is successful, a following window should appear. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 64 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 3.4 Step 4. ConfiguratorStart. Start “ConfiguratorSta

34、rt” again. Choose from ABB Menu/Generate E-Plan Excel for Drives. Set path to data base. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 65 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Set path to Eplan Output file. Choo

35、se Save. “ConfiguratorStart” can be close. Now we can check Eplan_Output xls file. 3.5 Step 5. EAS. Start EAS Tool. Choose “Read Data” in the menu. Make settings in the appeared window: For Generic Functions Drives, for Input File Path path to Eplan_Output.xls file. Then press Ok. Following window s

36、hould appear. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 66 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 Choose “Output” in the menu. All settings are shown for the appeared window on the following picture. Followin

37、g windows should appear. Doc. kind Project Customer Title Generations EPLAN Diagrams Users Manual Proj. no. Doc. no. Lang. Rev. ind. Page 67 ABB (Hong Kong) Limited 3BCN1 XXXXX XXXXX En A No. of p. 67 The created SLD (Single Line Diagram) and CD (Circuit Diagram) projects in the Eplan are result of work of all actions.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1