DD-IEC-TS-61370-2002.pdf

上传人:yyf 文档编号:3753596 上传时间:2019-09-22 格式:PDF 页数:20 大小:315.91KB
返回 下载 相关 举报
DD-IEC-TS-61370-2002.pdf_第1页
第1页 / 共20页
DD-IEC-TS-61370-2002.pdf_第2页
第2页 / 共20页
DD-IEC-TS-61370-2002.pdf_第3页
第3页 / 共20页
DD-IEC-TS-61370-2002.pdf_第4页
第4页 / 共20页
DD-IEC-TS-61370-2002.pdf_第5页
第5页 / 共20页
亲,该文档总共20页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《DD-IEC-TS-61370-2002.pdf》由会员分享,可在线阅读,更多相关《DD-IEC-TS-61370-2002.pdf(20页珍藏版)》请在三一文库上搜索。

1、DRAFT FOR DEVELOPMENT DD IEC TS 61370:2002 Steam turbines Steam purity ICS 27.040 ? Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:31:36 GMT+00:00 2006, Uncontrolled Copy, (c) BSI DD IEC TS 61370:2002 This Draft for Development, having been prepared under th

2、e direction of the Engineering Sector Policy and Strategy Committee, was published under the authority of the Standards Policy and Strategy Committee on 26 July 2002 BSI 26 July 2002 ISBN 0 580 40111 1 National foreword This Draft for Development is the English language version of IEC TS 61370:2002.

3、 This publication is not to be regarded as a British Standard. It is being issued in the Draft for Development series of publications and is of a provisional nature because it was not possible to obtain the necessary support for the production of an International Standard at this time but it was con

4、sidered important that the information included should be made available for general use as quickly as possible. It should be applied on this provisional basis, so that information and experience of its practical application may be obtained. Comments arising from the use of this Draft for Developmen

5、t are requested so that UK experience can be reported to the international organization responsible for the Technical Specification. A review of this publication will be initiated not later than 3 years after its publication by the international organization so that a decision can be taken on its st

6、atus at the end of its 3-year life. Notification of the start of the review period will be made in an announcement in the appropriate issue of Updated Standard. According to the replies received by the end of the review period, the responsible BSI Committee will decide whether to support the convers

7、ion into an international standard, to extend the life of the Technical Specification for another 3 years or to withdraw it. Comments should be sent in writing to the Secretary of BSI Technical Committee MCE/13, Steam turbines, at 389 Chiswick High Road, London W4 4AL, giving the document reference

8、and clause number and proposing, where possible, an appropriate revision of the text. A list of organizations represented on this committee can be obtained on request to its secretary. From 1 January 1997, all IEC publications have the number 60000 added to the old number. For instance, IEC 27-1 has

9、 been renumbered as IEC 60027-1. For a period of time during the change over from one numbering system to the other, publications may contain identifiers from both systems Cross-references The British Standards which implement international publications referred to in this document may be found in t

10、he BSI Catalogue under the section entitled “International Standards Correspondence Index”, or by using the “Search” facility of the BSI Electronic Catalogue or of British Standards Online. Summary of pages This document comprises a front cover, an inside front cover, the IEC TS title page, pages 2

11、to 17 and a back cover. The BSI copyright date displayed in this document indicates when the document was last issued. Amendments issued since publication Amd. No. DateComments Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:31:36 GMT+00:00 2006, Uncontrolled

12、 Copy, (c) BSI SPCIFICATION TECHNIQUE CEI IEC TECHNICAL SPECIFICATION TS 61370 Premire dition First edition 2002-06 Turbines vapeur Puret de la vapeur Steam turbines Steam purity Numro de rfrence Reference number CEI/IEC/TS 61370:2002 DD IEC TS 61370:2002 Licensed Copy: London South Bank University,

13、 London South Bank University, Tue Dec 12 03:31:36 GMT+00:00 2006, Uncontrolled Copy, (c) BSI CONTENTS FOREWORD.3 1Scope.5 2Abbreviated terms.6 3Need for steam purity control 6 3.1Corrosion and loss of efficiency or output.6 3.2Categories of plant 6 3.2.1Reheat and non-reheat plants 6 3.2.2Primary s

14、ource of energy .6 3.3Operating regimes .7 3.3.1Start-up .7 3.3.2Volatile chemical-based treatments7 3.3.3Solid chemical-based treatments8 4Sampling and analysis 8 4.1Sampling locations 8 4.2Measured parameters9 4.2.1Cation conductivity.9 4.2.2Sodium 9 4.2.3Silica .9 4.3Significance of parameters 11

15、 4.3.1Cation conductivity.11 4.3.2Sodium 11 4.3.3Silica .11 4.3.4Chloride.11 4.3.5Sulphate 12 4.3.6Iron and copper .12 4.3.7Alternative additives.12 Annex A (informative) Guideline values 13 Bibliography17 Figure 1 Silica contents in saturated steam and boiler water .10 Table A.1 Steam purity limits

16、 for steam turbines Key parameters .14 Table A.2 Steam purity limits for steam turbines Diagnostic parameters.15 Table A.3 Actions on deviations from guidelines .16 DD IEC TS 61370:2002 2 Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:31:36 GMT+00:00 2006, U

17、ncontrolled Copy, (c) BSI INTERNATIONAL ELECTROTECHNICAL COMMISSION _ STEAM TURBINES STEAM PURITY FOREWORD 1)The IEC (International Electrotechnical Commission) is a worldwide organization for standardization comprising all national electrotechnical committees (IEC National Committees). The object o

18、f the IEC is to promote international co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and in addition to other activities, the IEC publishes International Standards. Their preparation is entrusted to technical committees; any IEC National

19、 Committee interested in the subject dealt with may participate in this preparatory work. International, governmental and non-governmental organizations liaising with the IEC also participate in this preparation. The IEC collaborates closely with the International Organization for Standardization (I

20、SO) in accordance with conditions determined by agreement between the two organizations. 2)The formal decisions or agreements of the IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since each technical committee has representati

21、on from all interested National Committees. 3)The documents produced have the form of recommendations for international use and are published in the form of standards, technical specifications, technical reports or guides and they are accepted by the National Committees in that sense. 4)In order to

22、promote international unification, IEC National Committees undertake to apply IEC International Standards transparently to the maximum extent possible in their national and regional standards. Any divergence between the IEC Standard and the corresponding national or regional standard shall be clearl

23、y indicated in the latter. 5)The IEC provides no marking procedure to indicate its approval and cannot be rendered responsible for any equipment declared to be in conformity with one of its standards. 6) Attention is drawn to the possibility that some of the elements of this technical specification

24、may be the subject of patent rights. The IEC shall not be held responsible for identifying any or all such patent rights. The main task of IEC technical committees is to prepare International Standards. In exceptional circumstances, a technical committee may propose the publication of a technical sp

25、ecification when the required support cannot be obtained for the publication of an International Standard, despite repeated efforts, or the subject is still under technical development or where, for any other reason, there is the future but no immediate possibility of an agreement on an Internationa

26、l Standard. Technical specifications are subject to review within three years of publication to decide whether they can be transformed into International Standards. IEC 61370, which is a technical specification, has been prepared by IEC technical committee 5: Steam turbines. The text of this technic

27、al specification is based on the following documents: Enquiry draftReport on voting 5/133/DTS5/138/RVC Full information on the voting for the approval of this technical specification can be found in the report on voting indicated in the above table. This publication has been drafted in accordance wi

28、th the ISO/IEC Directives, Part 3. Annex A is for information only. DD IEC TS 61370:2002 3 Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:31:36 GMT+00:00 2006, Uncontrolled Copy, (c) BSI The committee has decided that the contents of this publication will re

29、main unchanged until 2005. At this date, the publication will be reconfirmed; withdrawn; replaced by a revised edition, or amended. DD IEC TS 61370:2002 4 Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:31:36 GMT+00:00 2006, Uncontrolled Copy, (c) BSI STEAM T

30、URBINES STEAM PURITY 1 Scope This technical specification describes the importance of the chemical characteristics of steam supplied to steam turbines and the need to prevent corrosion and deposition in steam space, in order to minimize the risk of turbine corrosion failures or loss of efficiency or

31、 output. The significance of relevant chemical parameters, mostly related to impurity levels, is discussed in terms of types of plant and chemistry operating regimes. This specification is applicable to turbines of all electrical output rating and any exhaust condition, i.e. condensing or back press

32、ure. However, the range of application in terms of output rating or steam pressure is dictated by economic factors such as the relative cost of monitoring equipment and turbine plant. It is designed for new plant, but may be adapted for use on existing plant. The limits described in this specificati

33、on are specifically designed to protect the steam turbine. The user should also be aware of steam purity requirements imposed by other considerations such as components of the boiler or steam generator. This specification is applicable to steam turbines driven from any source, except geothermal plan

34、ts in which the turbine is fed direct from the geothermal sources. After the initial start of the turbine it may take some months for best achievable chemistry to be reached. This tends to be achieved sooner for some parameters (sodium, cation conductivity) than for others (silica, iron, copper). It

35、 is therefore recognized that during commissioning, it may be difficult to meet normal targets, but a steady improvement should be observed as the steam cleans up. Annex A provides recommended guidelines for this specification and verification of the chemical purity of steam entering a steam turbine

36、, in order to maintain the integrity and efficiency of the turbine. The limits stated are not intended to be mandatory, but to be used as the basis for local instructions for individual plant. Verification is addressed as the selection of appropriate sampling locations and continuously or intermitte

37、ntly measured parameters. DD IEC TS 61370:2002 5 Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:31:36 GMT+00:00 2006, Uncontrolled Copy, (c) BSI 2 Abbreviated terms For the purposes of this technical specification, the following abbreviated terms are used: A

38、VTall volatile treatment BWRboiling water reactor c.concation conductivity CTcaustic treatment EPTequilibrium phosphate treatment FACflow accelerated corrosion IWCInternational Water Conference OToxygenated treatment PTphosphate treatment PWRpressurized water reactor 3 Need for steam purity control

39、3.1 Corrosion and loss of efficiency or output High purity steam is required to ensure steam turbine operation with a high degree of efficiency, output, and availability. Impurities can form deposits, which can lead to loss of efficiency or output or to corrosion. Corrosion can potentially lead to t

40、otal failure of rotating components. Conditions in expanding steam are such that even a low concentration of an impurity can coexist with a small quantity at high concentration in moisture over a narrow range of temperature and pressure conditions, which may coincide with the surface of a turbine co

41、mponent. It is therefore desirable to minimize the content of impurities. The levels recommended in this specification are established as achievable, measurable and consistent with a high level of efficiency, output and availability. 3.2 Categories of plant 3.2.1 Reheat and non-reheat plants The liv

42、e steam limits are applicable to machines both with and without reheat. However, the different implications for impurities in these two types of plant should be appreciated. In non-reheat fossil-fuel-fired machines, the temperature of the first condensation within the low-pressure (LP) stages tends

43、to be at a higher temperature than in units with reheat. Thus, the associated risk of corrosion tends to be higher. In units with reheat, there is a tendency for some species to deposit in the reheater and for a slightly better standard of purity to be expected in hot reheat steam than in live steam

44、. 3.2.2 Primary source of energy Tables A.1 to A.3 do not distinguish between primary sources of energy, i.e. whether fossil- fuel-fired or nuclear. However, PWR and BWR plants differ in that steam enters the turbine in saturated condition. Also, some BWR systems operate under an enforced oxygenated

45、 neutral condition similar to the OT option for feedwater treatment. DD IEC TS 61370:2002 6 Licensed Copy: London South Bank University, London South Bank University, Tue Dec 12 03:31:36 GMT+00:00 2006, Uncontrolled Copy, (c) BSI 3.3 Operating regimes 3.3.1 Start-up The values defined in tables A.1

46、and A.2 apply under normal steady load. More relaxed limits may be applied for a limited time at start-up. This allows a reasonable loading of impurities on the steam turbine without excessive start-up times. When a plant undergoes two-shifting, the time occupied by start-ups is higher. It may there

47、fore be appropriate to impose a limit on annual accumulated time occupied by the relaxed start-up limits. The decision whether to impose such a limit would be decided locally by the user. Some guidance is available in the bibliography. 3.3.2 Volatile chemical-based treatments 3.3.2.1 General Under t

48、hese regimes, only volatile treatment chemicals are used. They are typically injected into condensate or feedwater. Ammonia or volatile amines are used for pH control. Hydrazine, organic-based oxygen scavengers or oxidants are used for control of redox potential. Volatile chemical-based treatments d

49、o not provide pH buffer against acidic contaminants either in boilers or in turbines. For this reason, the control limits for cation conductivity, chlorides and sulphates in boiler water are at least of an order of magnitude below those of solid alkali-based treatments to ensure the same cycle corrosion protection. Volatile chemical-based treatments are used in units where the steam generation process may result in local dry-outs, and hence uncontrolled local concentration of s

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1