t橡胶坝及边对墙施工方案.doc

上传人:本田雅阁 文档编号:2163338 上传时间:2019-02-24 格式:DOC 页数:16 大小:260.02KB
返回 下载 相关 举报
t橡胶坝及边对墙施工方案.doc_第1页
第1页 / 共16页
t橡胶坝及边对墙施工方案.doc_第2页
第2页 / 共16页
t橡胶坝及边对墙施工方案.doc_第3页
第3页 / 共16页
亲,该文档总共16页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《t橡胶坝及边对墙施工方案.doc》由会员分享,可在线阅读,更多相关《t橡胶坝及边对墙施工方案.doc(16页珍藏版)》请在三一文库上搜索。

1、Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M t

2、otal area: 13979 square time: 251 days. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in L

3、ianyungang city, Jiangsu Yulong building construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration,

4、 quality, security and contract requirements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully m

5、eet the expectations of safety and durability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on t

6、he above points, the erection of scaffolding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous const

7、ruction experience, decided to adopt the following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safe

8、ty monitoring. Horizontal and vertical transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Pane

9、l agencies, staffing, and the Division of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible fo

10、r on-site safety inspections; Zhao Guangrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of exp

11、eriments, materials equipment positioning settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings

12、with a ruler, measure the inner and outer pole distance from the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with .Kangda College of Nanjing Medical Univ

13、ersity (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M total area: 13979 square time: 251 days

14、. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in Lianyungang city, Jiangsu Yulong buildi

15、ng construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration, quality, security and contract requir

16、ements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully meet the expectations of safety and dur

17、ability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on the above points, the erection of scaff

18、olding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous construction experience, decided to adopt t

19、he following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safety monitoring. Horizontal and vertical

20、 transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Panel agencies, staffing, and the Division

21、 of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible for on-site safety inspections; Zhao Gua

22、ngrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of experiments, materials equipment position

23、ing settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings with a ruler, measure the inner and ou

24、ter pole distance from the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with .筑龙网 本文共59页 更多详细内容http:/ 3#橡胶坝及左边墙施工方案 2010年8月30日第1章 概述1.1 3#橡胶坝及左边墙3#橡胶坝及左边墙

25、主要工作内容有砂砾石开挖回填、钢筋制安、砼浇筑、浆砌石、止水、格宾笼石、橡胶坝袋安装等。1.1.1工作范围1、钢筋混凝土铺盖段8m,桩号部位:中1+652.3571+660.357。2、钢筋混凝土地板段9m,桩号部位:中1+660.3571+669.357。3、钢筋混凝土跌坎段8m,桩号部位:中1+669.3571+677.357。4、钢筋混凝土消力池段6m,桩号部位:中1+677.3571+683.357。5、块石海曼段5m,桩号部位:中1+683.3571+688.357。1.1.2主要工程量根据招标文件、合同文件以及施工设计图,本标段3#橡胶坝及左边墙主要工程量可见小表:序号项目单位工程

26、量备注1.1开挖砂砾石m326116.001.2回填砂砾石m33277.001.3基底夯实m27813.001.4砂砾石夯填m310007.001.5弯扎钢筋t246.001.6现浇C25F200混凝土m34074.001.7现浇C25F200混凝土m3238.001.8现浇C20F200钢筋砼m3268.001.9现浇C200F200块石砼m3784.001.10M7.5浆砌石m3135.001.11C10砼垫层m3657.001.12651型橡胶止水带m633.001.13底发泡聚乙烯闭孔泡沫板m2642.001.14格宾笼石m3766.001.15直钢管DN400 =6m242.001.

27、16消力池排水管m90.001.17橡胶坝袋安装(坝高2.5m)延米153.20包括坝袋、垫片、堵头、锚固件等安装1.2 施工难点及特点分析通过现场踏勘,结合合同件与施工图纸的要求,本工程存在以下特点及难点:1、施工期9月为讨赖河汛期,施工安全隐患突出,加强安全管理和检测工作需要重视。2、此项工程工期紧,施工项目多,因此相对施工任务较大。3、施工项目多、混凝土浇筑量大,工序穿插施工干扰大。对策:1、制定合理、可行性的施工方案,结合施工实际情况实施。2、合理化、最优化的投入各项施工资源,制定可行性进度计划与施工任务,以保障工期目标的顺利实现。3、加强各施工作业班组之间的沟通与协调,合理安排各工序

28、之间的衔接。1.3 工期目标3#橡胶坝及左边墙工程计划于2010年10月15日完工,具备蓄水条件。1.4 质量目标我公司已建立ISO9001:2000质量管理体系,并通过了国家方圆质量认证委员会的认证。本着对业主高度负责的态度,我们将贯彻“质量第一、科学管理、守约重誉、用户满意”的质量方针,认真执行国家有关质量法令、法规验收规程和有关标准,严格按合同文件、图纸要求进行施工,确保工程质量目标的实现。本项工程质量目标:1、严格控制施工过程,确保产品质量符合法律法规、技术标准、合同和顾客要求;2、施工产品一次交付合格率达到100%,优良率达到85%以上;3、合同履约率达到100%。1.5 安全生产目

29、标认真贯彻“安全第一”和“安全生产、预防为主、防管结合”的安全生产方针,按照合同和有关规程规范的要求,并针对本工程项目的特点,强化施工(生产)安全管理,全面落实安全生产责任制,保证安全目标的实现。本工程施工安全目标:无重大伤亡事故。1.6 文明施工目标通过本企业在以往工程施工中的实践,充分认识到文明施工在项目管理中的重要作用。一是文明施工改变施工现场面貌,改善职工劳动条件,提高工作效率,始终保持良好的精神状态;二是文明施工不仅可以促质量保安全,而且能够提高经济效益,减少工、料、机无效的投入和浪费。针对本工程确定的文明施工目标是:创建安全文明工地。第2章 施工布置2.1 施工布置的依据和原则2.

30、1.1 施工布置的依据1、工程所在地的自然条件和招标文件提供的用地范围、供水和供电条件,发包人提供的材料、设备,现场实际情况等条件;2、对该项工程施工项目拟采取的施工方案、编制的进度计划、劳动力计划和设备计划;2.1.2施工总平面布置的原则1、尽量减少施工用地,使平面布置紧奏合理;2、合理组织运输,减少运输费用,保证运输方便畅通;2.2 施工布置说明2.2.1施工交通而为方便橡胶坝及左岸变强施工,沿左岸河道现已加固的堤防修筑临时道路,临时道路均经平整后铺垫碎石,进行碾压,宽度为4.5m。临时道路的布置可根据施工作业现场实际需要按业主和规划布置的要求进行适当调整。2.2.2施工用电1、用电规划施

31、工现场用电主要为混凝土拌合、浇筑、施工照明等施工项目用电,相对用电量较小,采用1台75KW柴油发电机作为供电点。钢筋加工用电利用现已接入施工营地内的供电点接入,以满足第6标段河道治理工程项目施工中用电需求。2、施工供电设备及材料主要施工供电设备材料表 表2.2-1序号设备材料名称型号规格单位数量备注1电力电缆线m500绝缘电缆2柴油发电机75KW台13配电箱个22.2.3施工照明钢筋、拌和系统等辅助设施照明设计标准10W/m2、室内采用荧光灯、室外采用碘钨灯。仓库系统照明设计标5W/m2,采用密闭型安全防爆灯。2.2.4施工用水1、用水规划及布置施工用水就近从讨赖河提取,考虑季节性降雨影响,可

32、在河道旁挖深约2.5m,周边用多孔浆砌石防护的渗井坑,同时在施工区设置沉淀池与集水池以保证施工用水质量。采用1台IS80-65-125型离心泵(Q50m3/h,H32m)抽水,并用75分管输送至用水工面。2、施工供水系统特性及工作量表河道治理一期工程第6标段施工用水主要为混凝土拌合用水,从集水池采用75分管输送至用水点。供水系统主要工作量表 表2.2-2序号名称规格单位数量备注1水泵IS80-65-125台2备用1台2渗井坑2.5m1m2m个13沉淀池12m3个14集水池12m3个15分管75mmm8002.2.5弃渣场布置及施工弃渣场按业主要求沿讨赖河左岸两侧进行布置,运输线路以场内临时道路

33、为主。弃渣必须按监理工程师要求分区规划,弃渣按可利用料、弃料分开堆放,不能混杂装运和堆存,派专人指挥倒渣、推渣及渣场的维护,渣料自下而上分层进行堆筑,并进行整平摊铺。第3章 施工进度及资源配置3.1 施工总进度图3.1.1计划进度3#橡胶坝及左边拟于2010年9月1日开工(以监理人的开工通知为准),于2010年10月15日竣工,总工期1.5个月。3.1.2 主要施工项目进度安排根据施工进度计划安排,结合该工程施工条件,通过对施工技术及各项工程的仔细研究,控制该3#橡胶坝及左边墙工程工期的关键性施工项目为:土石方开挖、3#橡胶坝及左边墙钢筋混凝土、橡胶坝袋安装。本工程主要控制性进度如下表3.2-

34、1。控制性工期表 表3.2-1序号施工项目开工日期完工日期1临时工程(含施工准备)施工准备2010年09月01日2010年09月04日施工道路2010年09月05日2010年09月7日2土石方开挖夯填钢筋混凝土铺盖段(含防冲墙)2010年09月16日2010年09月22日钢筋混凝土底板段2010年09月05日2010年09月10日跌坎段2010年09月07日2010年09月12日消力池段2010年09月18日2010年09月22日海漫段2010年09月26日2010年10月01日左边墙2010年10月01日2010年10月05日3混凝土浇注防冲墙2010年09月20日2010年09月22日钢筋

35、混凝土铺盖段2010年09月22日2010年09月27日钢筋混凝土底板段2010年09月10日2010年9月18日跌坎段2010年09月12日2010年09月20日消力池段2010年09月24日2010年09月30日海漫段2010年09月28日2010年10月05日左边墙2010年10月05日2010年10月15日4格宾笼石2010年10月05日2010年10月15日5坝袋安装2010年10月05日2010年10月15日6竣工验收(含资料整理)2010年10月16日2010年10月18日3.1.4主要项目施工强度分析1、本项目主要项目施工强度指标砂砾石及砂卵石开挖夯填高峰在橡胶坝铺盖、底板及跌

36、坎段,最大强度约2500m3/d,开挖夯填进行24小时三班作业。混凝土浇筑高峰期同时也在橡胶坝底板与跌坎段,最大强度约292.76m3/d。2、施工生产能力强度分析1)经计算土石方工程拟投入1台1.2m3液压反铲,1台1.0m3液压反铲,1台3m3装载机,4台8T自汽车(出渣),1台 DX700振动碾,考虑生产出勤率, 完全可以满足强度要求。3.2 施工设备及劳动力配置3.2.1拟投入设备配置及数量表根据本项目的特点和实际施工需要,拟投入本合同工作的主要施工机械设备见下表(表3.2-1)所述。拟投入的主要施工设备表 表3.2-1序号机 械 设 备备 注名 称型号/规格数量(台)1挖掘机1.2m

37、3/1.0m31/12推土机13装载机ZD5014装载机ZD28F1混凝土拌合上料5混凝土拌合机郑州75型16自动配料机1200L17混凝土拌合机0.5m318振动碾DX70018离心泵59电焊机30A310钢筋切割机211钢筋调直机212振捣棒50/704/213全站仪莱卡114水准仪SL-3115自卸车4出渣及运料16载重汽车4混凝土水平运输17皮带运输机218皮卡车119办公车辆13.2.3拟投入的劳动力拟投入本合同工作的劳动力计划表 表3.2-2序号名 称人 数备 注1项目经理12项目常务副经理13副经理兼技术负责人14质检员25安全员16测量员17施工员28材料员19重机司机16高峰

38、期10混凝土工35高峰期11钢筋工25高峰期12模板工25高峰期13普工203.2.5主要材料需用量计划主要材料和水、电需用量计划表 表3.2-3序号名称规格型号单位数量1减水剂UNF-1t122橡胶止水带651型m762.13水泥325#t18004砂石骨料m372005钢筋8t2.355 12t81.074 14t3.613 16t63.295 18t15.475 25t1.582 第5章 质量保证5.1 质量保证措施5.1.1总体质量保证措施1、施工准备工作的质量保证措施1)合理配置能够满足施工要求的各类管理人员和施工人员,配置能够满足工程施工强度、精度要求的各种机械设备、工器具和测量仪

39、器设备。迅速完成临建工程施工,做好人员、设备的进场准备。2)认真研究设计图纸,编制详细的施工组织设计,对关键部位制定详细、严密的施工技术措施,在规定时间内报监理工程师审批,做好技术准备。3)采购部门根据设计图纸要求,对工程设备、材料做好市场调查,掌握设备、材料的来源及其质量情况,编制采购计划报监理工程师审核,同时,采购贮存部分开工急需材料。2、施工过程中的质量保证措施施工过程中,对影响工程质量的五大因素“人、机、料、法、环”实施控制,这是质量管理的重要环节,严格按照设计文件和有关规程、规范要求施工,实行全员、全过程、全面管理和控制。1)人员因素的控制。(1)质量由总工程师总体负责,必须由经水利

40、水电施工质量管理培训并获得合格证的专职质检员具体负责。(2)技术工作由精通业务的专业人员或业务素质较高的技术工人担任,对特殊工程种作业人员必须经过培训,经考核合格后,持证上岗。2)机械设备因素的控制。(1)选用科技含量较高、性能较好、精确度高的机械设备和工器具,定机定人、定期维护、责任到人,以保证设备完好。(2)根据要求进行测量、计量设备的定期维护、检验、校对,保证其完好度和精确度。3)原材料因素的控制。(1)成立专门材料管理机构,配备专职材料管理员从事材料采购工作。(2)对采购来的材料,由专人负责清点、验收与保管。4)方法因素的控制。(1)严格执行国家和水利部颁布的有关规程、规范、技术标准、

41、验收标准,科学组织、严密施工。(2)对于关键部位、关键工序和关键工艺必须制定技术措施并报监理工程师批准执行。(3)贯彻技术交底制度,每道工序开工前,先交底后施工,不经技术交底、不明确工艺及质量要求,不准施工。(4)分部分项工程施工前必须进行测量放样,施工过程中随时进行复核,测量人员全天候为施工服务,确保建筑物结构准确。5)环境因素的控制。(1)做好天气预报分析,作为安排生产的依据。(2)抓紧水文、天气等有利条件施工,配备必需的防雨、防晒物资(如防雨布、麻包袋等),确保工程质量不受气候影响。(3)配备足够的排水设施,排除工作面积水,保证施工在干爽环境中进行。3、事后质量控制措施1)项目完成后及时

42、进行检查验收,发现问题及时返工或修整。2)制定成品及半成品保护措施,保证在工程施工过程中和移交前完好。3)项目完工后,及时整理有关资料,保证竣工资料的及时与完整,及时总结经验教训,指导后续施工。5.1.2主要施工项目质量保证措施1、基础开挖1)按施工图纸要求检查基础开挖基面的平面尺寸、标高和场地平整度。2)应保证基础基面无积水和不受扰动。2、填筑1)按施工图要求检查回填面的平面尺寸、标高。2)按设计图纸要求检查施工过程中的碾压系数以及填筑完成后的压实度。3)填筑处理验收后的实测剖面测量资料报送监理机构复核签认,作为填筑工程量的计量依据。5.2 雨季质量保证措施雨季施工对工程影响也较大,拟采取以

43、下措施保质保量完成施工任务。1、雨季前,进行防雷、接地检查,保证人身、设备不受雷击破坏,同时对施工现场设施进行维护维修,确保人身、财产安全。2、雨季注意收听收看天气预报,观察天气变化,与气象部门保持密切联系,根据天气情况安排施工项目。3、雨季开挖施工措施(1)开挖前做好场地排水工作,临时排水与永久排水相结合,防止雨水冲刷边坡和侵蚀地基土壤。(2)做好工作面的排水工作,修建排水沟,工作面向外或向排水沟做成12的坡度以利排水。第6章 安全文明施工管理6.1 安全生产保证措施6.1.1安全用电及防止人身触电措施1、实行三级配电、二级漏电保护;实行一机一闸一漏一保护。2、施工或生活用电线路应由专业电工

44、操作,完毕后经项目部安全负责部门验收合格后方可使用。3、施工用电线路架设与管理必须严格按施工现场临时用电安全技术规范JG J 46执行。6.1.2施工机械设备安全管理办法1、对施工机械设备进行统一管理,统一指挥,责任到人,施工过程中要有技术人员和专职安全员在场监护,并填写相关运行记录。2、对机械设备的使用进行维护,建立所使用机械设备的使用维护记录档案。3、对于机械设备多班运行作业的要建立交接班制度。4、确保特种机械操作人员持证上岗,并做到定人、定岗、定机。6.1.3交通安全车辆管理措施1、项目部对车辆严格执行机动车运行安全技术条件的国家标准:凡未达标的车辆禁止执行任务。2、工地出勤车辆须经项目

45、部前方施工调度进行派车,方准执行任务;每天晚上7:00凌晨7:30工地需要出车时,必须经安全负责人及前方施工调度共同派车或项目部负责人派车。3、项目部对车辆进行不定期进行检查与维修,并保持纪录,并对车辆实行定期逐台检查制度,并保持相应的记录。6.1.4油料安全管理措施1、认真执行“预防为主,防消结合”的方针,做好消防工作。2、库房内必须配置必须的消防器材。3、每月进行一次消防安全检查,及时更新过期、失效的消防器材。6.1.5安全度汛应急管理措施发生灾情事故时,项目部应急救援领导小组立即投入运作,及时组织实施安全渡汛应急救援措施,以防止灾情事故的扩大。安全渡汛应急救援措施如下:1、在灾情事故发生第一时间,现场人员应及时切断各种用电设备的电源。2、救援小组及时组织技术人员根据灾情事故实际情况制订技术救援方式、方法。3、根据救援方法及时调配救援