施工管理工作报告(光伏阵区进线二发电系统(6区-9区、14区)).doc

上传人:本田雅阁 文档编号:2191110 上传时间:2019-02-27 格式:DOC 页数:50 大小:364.51KB
返回 下载 相关 举报
施工管理工作报告(光伏阵区进线二发电系统(6区-9区、14区)).doc_第1页
第1页 / 共50页
施工管理工作报告(光伏阵区进线二发电系统(6区-9区、14区)).doc_第2页
第2页 / 共50页
施工管理工作报告(光伏阵区进线二发电系统(6区-9区、14区)).doc_第3页
第3页 / 共50页
亲,该文档总共50页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

《施工管理工作报告(光伏阵区进线二发电系统(6区-9区、14区)).doc》由会员分享,可在线阅读,更多相关《施工管理工作报告(光伏阵区进线二发电系统(6区-9区、14区)).doc(50页珍藏版)》请在三一文库上搜索。

1、to clean and repair, it is strictly forbidden to head reaches into the mechanical stroke range. 17th article: in overhead transmission line following work should blackout, cannot blackout Shi, due isolation protection measures, crane shall not in overhead transmission line following work, through ov

2、erhead transmission line should will lifting arm falls, in overhead line side work Shi, regardless of in any situation Xia, lifting arm, and rope or weights, and overhead transmission line of recently distance should not is less than Xia table provides: transmission line voltage 1000 v following 1-1

3、5 kV 20-40 kV 60-110 kV 220,000 v Allow minimum distances with the transmission line (m) vertical 1.5 level 1 1.5 2 3 4 5 6 4 6 18th: lamp voltage may not exceed 36 volts, when working in a damp place or metal containers, lamp voltage may not exceed 12 volts. 19th: pressure vessel should have a safe

4、ty valve, pressure gauge, and avoid sun exposure, collisions, oxygen cylinders to prevent contaminated oil; of acetylene gas, LPG, must have a safety device to prevent tempering. 20th: x-ray and gamma-ray flaw detector operation area, non-operator, not allowed to enter. Article 21st: corrosion, dust

5、 and radioactive and toxic work, protective measures are required, and to carry out regular inspection. Spider-man 22nd section III: Spider-man to regular medical examinations of the medical diagnosis, who suffer from high blood pressure, heart disease, anemia, epilepsy and other discomfort in the S

6、pider-man shall not engage in aerial work. 23rd: Spider-man dressed spirit, banned the wearing of hard bottom and easy slip-on shoe nail. 24th: Spider-man material stack stationary, tools should turn into a tool bag, transfer prohibited throwing of objects. 25th: in case of bad weather (such as wind

7、 in the above grade) construction safety, prohibition of the open air, lifting and piling. 26th article: ladder shall not deficiency document, no padded using, ladder cross document spacing to 30 cm suitable, using Shi top to tied prison, bottom should take anti-sliding measures, single ladder and g

8、round angle to 60 degrees suitable, ban II people while in ladder Shang job, as needed received long using, should lashing firm, people Word ladder in end of feet pulled prison, in channel at using ladder, due guardianship or set fence. 27th: no security measures, prohibited in hip joints, supports,

9、 trusses of the roof truss cantilever beams, and choose the frame and half fixed widget or job to walk on, Spider-man and the ground . Nine, ten basic security to prevent vehicle damage claim 1, without legal training of qualified certified personnel not familiar with vehicle performance is not driv

10、ing a car. 2, should insist on doing defense work, vehicle brake, Horn, steering systems, lighting and other safety components such as poor are not allowed out of the car. 3, dump truck, dump truck car hop is strictly prohibited, prohibited goods mixing, loading of vehicles should not overload,stave

11、bn tm vdce mst een. een by mlo zahrnovat analzu rizik, monost nehod charakteristik a nouzovch postup, nouzov zpracovn a obsah opaten. 4, integrovan pohotovostn plny, speciln havarijn plny a mst een by mly bt mezi sebou a s ostatnmi jednotky zapojeny v nouzi, kter jsou vzjemn propojeny. 5, havarijn p

12、ln by ml zahrnovat havarijn personl a organizace kontakt, nouzov rezervn seznam a dal informace. Informace by mly bt pravideln aktualizovny a zajist, e informace jsou pesn a platn. tyi, havarijn pln revize 1, Recenze pohotovostn plny pezkoumn formul a prvky pezkumu a opaten pijatch dvma zpsoby. Kdy

13、host slou pedevm pro havarijn plny pro zznam v podob Recenze, prvek hodnocen pro nouzov hodnocen. . Kd pro porn ochranu konstrukce budov a nsk republice ny exploze nebezpen oblasti elektrick bezpenostnch pedpis a pedpis o porn ochranu design rafinaci ropy a chemickch podnik, napklad poadavky na pedp

14、isech a nazench. 2. pi provdn instalace me zpsobit por, exploze, kter sti by mly bt pln nastaven peht, petlaku, micch pstroj, alarm (zvuk a svtla). 3. kde je holav plyn (pra) me unikat , holav plyn koncentrac detekce, alarm by mla bt nastavena. 4. vechny komunikoval s holav, vbun zazen s inertnm ply

15、nem, plynov penosov potrub, by mla bt nastavena zabrnit holavch a vbunch ltek do zazen, ale nemla bt samostatn zptn ventil. 5. holav plyn (pra) nastavit plamen svodi odvzduovac vvod, snadno pracovat, kde se zastavit ventily, aby pi vstupn vtrac potrub je v plamenech, peruil por plynu odvzduovac potr

16、ub ml bt nainstalovn v nejni hasicho zazen. 6. kdy dopravu holavch materil by mla odpovdat prmru potrub a stedn mrn odpor, sprvn zen prtoku, co nejvce se vyhnout statick elektiny. Antistatick opaten, jako jsou zazen, potrub, by mlo bt v souladu s technickmi pedpisy pro uzemnn design pro chemick podn

17、iky pslunch ustanoven. 7. nhl vbun petlaku nebo rychlho rozkladu vrobnch zazen nebo skladovacch zazen by mly bt vybaveny vbuchu (nevbun membrna), vvoz nonel trubice smrem k bezpenosti a aby prevence sekundrnch exploz, protiporn opaten. 8. vrobnthe principle of simplified EIA of construction projects

18、 in the region. In terms of land, linked to the implementation of urban and rural construction land increase and decrease, replacement indicators for priority areas project. Charges, into the projects of water, electricity, administrative charges and preferential policies. In the area of taxation, a

19、nd settled in areas of industry and its production company, within 5 years after the completion of fiscal incentives to enterprises. In terms of financing, integration of land, tax, financial and other resources, and construct Government credit + business credit credit system, establishment of marke

20、tization, commercialization and modernization of the investment and financing platform; effective Bank-enterprise docking, encourages private capital into the Park, to raise industry development fund. 5, optimize the environment and service industries. To create policy lowlands, Highlands, integrity

21、 of service land, development land as the goal, to optimize the area under development environment. All administrative law enforcement departments to appoint a full-time personnel stationed in areas dedicated to coordinating and solving problems associated with businesses in this sector. When there

22、are substantial issues, sector leaders arranged to personally intervene, in-person, in-person push tangible area building a green light, easy line. To further reduce and standardize administrative examination and approval items, simplify examination and approval links, improve efficiency; according

23、to the .Since the educational practice of the mass line of the party, himself seriously in the education, practical control central eight rules and opposing the four winds and practicing three Suns, and check the spirit of Jiao Yulu, ideology, solicit opinions based on outstanding problems checked s

24、wing, careful analysis and reflection. Will now check report is as follows: first, adherence to the partys political discipline, eight in the central provision, change the style of the basic situation of 1, in compliance with the partys political disciplines. Conscientiously abide by the partys poli

25、tical discipline, abide by the Constitution and the rules and regulations of the party, in the political, ideological and maintain highly consistent with the CPC Central Committee on the action, there is no violation of the partys political discipline problems. 2, in the implementation of the centra

26、l authorities of the eight provisions. Improving research, improving research methods, but there are less grass-roots units, primary first-hand an inadequate grasp of the problem, which is to be strengthened in the future. Second, construction, strictly in accordance with the provisions to streamlin

27、e and improve the quality of meetings of the Conference. Third, streamlining file briefs, culture involves all aspects of propaganda and ideology, sometimes due to the practical needs of invention notifications, this area needs further克拉玛依天华新能源电力有限公司新建100MW光伏并网发电项目(二期30MW)工程光伏阵区进线二发电系统(6区-9区、14区)(SN

28、D-GB-A15-009)单位工程验收施工管理工作报告 上海斯耐迪工程咨询监理有限公司 克拉玛依项目部 2014年12月1.工程概况本工程光伏区施工范围包括1000KVA箱变30台、MW房30台(500KW逆变60台、通讯屏30面)、组件121000块、直流防雷汇流箱360台、35KV高压集电线路6回等。光伏电站35kV母线侧至箱式变压器部分,升压站内35kV进线开关柜为止,包括本期35kV母线段35kV进线6回,光伏场区箱式变压器35kV侧环网6回,35/0.315/0.315kV双分裂升压变压器30台,35kV集电线路及通讯光缆敷设若干。每个1MW的光伏阵列经1台箱变升至35KV,光伏场区

29、本期建设30MW共分6回集电线路接至110kV升压站35kV母线侧。2.工程名称、位置及任务 本单位工程名称为:光伏阵区进线二发电系统(6区-9区、14区),单位工程编码为SND-GB-A15-009。本单位工程位于光伏区内。主要完成1-5#区域内相关设备的安装(1000KVA箱变5台、MW房1台(500KW逆变10台、通讯屏5面)、组件20616块、直流防雷汇流箱60台、35KV高压集电线路1回等)。3.本单位工程主要安装内容及技术特性 3.1 根据工程项目和对总工期的要求,为确保本工程安装工程项目的施工质量、缩短工期,安全、优质、高效地达到业主对工程内容、工期和电站运行投产要求。根据本工程

30、所掌握的现场施工条件,对工期进度计划进行了仔细、认真、全面和科学的分析研究。在总工期内确保电站的安装质量、缩短工期、控制工程造价,安全、优质、快速、高效的满足业主的工期要求,并按业主要求,高标准达标投产,让业主满意,发挥经济效益和社会效益,把本工程建成业主的放心工程。3.2 施工进度保证措施3.2.1 组织管理措施(1)电气专业成立由负责人、施工管理人员、专业施工技术员、作业班组长组成的工期实施领导小组,层层定量、定位、定时下达计划任务,及时调整和补充进度快慢的应急措施,确保各阶段进度按计划进行。(2)根据实际情况现场检查、督促、协调、帮助解决工程进度、人力、物力、资金等方面的问题,保证各控制

31、网点工期安全、优质、准点实现。3.2.2 劳动力组织措施(1)组织精干的施工队伍进场,队领导和作业层的班组长由专业处主要骨干中选任,加强作业层的领导和管理。(2)强化进场职工的技术培训,特殊工种经培训、考核合格后持证上岗,对特殊工种及人员经常性进行监督检查。(3)根据本工程的特点,为确保主体施工进度,组建一支技术精良、素质好、能吃大苦、耐大劳,顾全大局、服从指挥调度,善打硬仗的职工队伍进入现场施工。3.2.3设备机具的配置措施(1)为加快工程进度,合理配备施工机具装备,决定对本工程施工阶段配置和配套的其它施工机械,提高机械化施工水平,保证各控制工期全面完成。加强机械设备管理和保养维护,确保正常

32、运转,机械设备完好率保证达到95以上,利用率保证达到80以上,对本工程设置配备专业机械维修人员,加强设备机具管理,保证施工的连续性。同时,所有工机具均需校验合格并在有效期内。主要施工器具配置序号设备名称设备型号单位数量1铲车50台12挖掘机台23吊车25T台14板车12T台15常用电工工具套36电缆切割机台17机械电缆压线钳台18调试设备套19电缆打号机台110手拉葫芦1t台1(2)拟使用检验试验仪表如下表:序号名 称型 号 规 格单位数量备注1自动安平水准仪AS-2台12接地电阻测试仪ZC-80台13钢板尺2m台24水平尺2m/1m台25力矩扳手套36开关机械特性测试仪KJTC-IIIB台1

33、7电秒表407,1/100600s台18相序表TG2台19三用表数字式校验仪SSJ-9002台10轻便交流试验设备GYD-20/100台211直流高压发生器ZGF-120KV/2mA台112变比组别自动测试仪KP-3台113智能形互感器校验仪HGJ-台114大电流发生器100KVA台115数字兆欧表DMG2671B台216兆欧表ZC25-3,500V台217兆欧表2525型台218电秒表407台119数字温度计257510台220数字信号校验仪RANSMATION,0.1%台121便携式多功能校验仪PJN5210,0.05%台122回路校验仪MIC10台223数字万用表PF-56台33.2.4

34、 施工组织技术措施(1)认真作好施工准备工作,首先排出准备工作计划,划分技术责任单元,落实到人头,确保工程连续均衡施工。(2)组织施工技术人员认真熟悉施工图纸,充分领会和掌握设计意图,增强对施工图纸的熟悉程度。(3)认真编制施工组织设计,优化施工技术方案,推广和应用新工艺。强化安全管理,安全文明施工管理和质量保证管理,杜绝重大安全事故和质量事故,避免返工损失。(4)进行施工工艺标准化交底及操作技术指导,认真编制施工作业指导书,提高施工操作的熟练程度。(5)进行层层技术交底,让每个施工技术人员领会施工总体方案及细部处理措施,让操作工人明确质量标准、强条内容及工期要求,做到定性、定量管理。(6)认

35、真编制施工进度控制网络图,合理安排各阶段施工控制工期,强化计划管理,充分发挥公司综合施工队伍的优势,精心组织,精心施工,合理调度,合理安排交叉施工,协调好各工序的衔接,关键项目,组织专项战役,务期必成。 (7)组织交叉及平行流水段的施工,尽量创造工作面,使后续工序尽量提前插入,同时按协调配合措施注意交叉污染的预防和成品保护,防止返工造成的时间损失。3.2.5 施工生产调度组织措施 为加强对工程的组织领导,对施工生产集中宏观控制及管理,及时果断解决问题,按计划、有重点地全面完成施工生产任务。(1)在安排施工计划时,必须对施工进度综合平衡和调度,要侧重保证重点,又要统筹兼顾全面安排,根据各项目进度

36、,找出关键性工程项目,带动其他工程项目进度的全面完成。(2)施工过程中,对施工生产及时果断地进行调度和解决施工中出现的问题,准确、及时调度人力、机具、材料和车辆,分析预测施工中的薄弱环节,商定解决措施,确保计划的全面完成。(3)实施周计划、月计划措施,部署下周、次月的作业计划。并对人力、机具、场地、材料和车辆等作平衡安排。(4) 认真做好冬季寒冷、气温下降快的防护措施,保证冬季正常施工,做好冬季防寒的保健措施,确保工程正常施工。(5)夜间施工按当地有关规定要求办理夜间施工许可证,取得认可并采取相应的措施后方可进行。(6)夜间施工现场配备值班电工,在施工作业面、材料运输通道、施工设备旁、主要出入

37、通道等安装亮度足够的照明灯具。(7)固定的灯具与易燃物体要保持足够的安全距离,拖动的灯具采用容量相当的双层塑料橡胶电缆,电源开关均要有漏电保护装置。(8)合理调整施工时间,夜间施工班组进行轮休,严禁疲劳作业。(9)对预留孔洞制作带荧光标牌悬挂,必要的地方派专人看管。5、主要项目施工技术方案及措施5.1 电缆敷设5.1.1电缆敷设工艺流程如下图:5.2.2具体施工方法及工艺要求施工前准备:电缆敷设前,准备工作一定要充分。首先要拟出电缆敷设清单, 确定敷设的先后顺序, 尽量避免敷设过程中电缆相互交叉。需要敷设的电缆要准备齐全,并检查电缆是否完好,其绝缘是否符合标准。电缆标志牌应准备临时标志牌和正式

38、标志牌两种, 并整理分类。敷设时挂临时标志牌,待接线工作全部结束后,再更换成正式标志牌。电缆敷设所需的工具、材料准备齐全。参加电缆敷设的所有人员必须由负责人组织施工交底,并带领主要成员到现场熟悉有关的电缆路径和电缆所接的设备。电缆标志牌加工: 正式志牌上应详细标明电缆编号、电缆规格及起止端设备名称;临时标志牌则用记号笔在相色带上写明电缆标志临时装挂,但装挂必须紧固。(正式电缆标牌排如下图) 电缆敷设示意图:图a人力牵引示意图图b 机械牵引(托撬)示意图注意:敷设电缆时电缆放线架必须放置稳定,使用前必须检查其可靠性。钢轴的强度和长度应满足电缆盘重量和宽度需要;电缆应从电缆盘的上端引出,且电缆盘不

39、得与地面摩擦,至少保持100mm150mm的距离;电缆敷设过程中,不得有铠装压扁、电缆拧绞以及外护层损伤等未消除的机械损伤;施放大截面电力电缆时,采用专门的滚动架子,以免电缆与地面的摩擦,也便于电缆 加快施放速度。人工敷设电缆时,需要的施工人员较多,因此人员必须合理调配,并由专人统一指挥;负责电缆敷设的管理人员,必须对所有通道特别清楚,防止出错返工。敷设电缆时,应认真测估每盘电缆的长度和每根电缆实际需要的长度,本着先长后短的敷设原则,合理安排每盘电缆,尽量减少中间接头。电缆敷设过程中,应尽量避免交叉,排列整齐有序;每敷完一根,就定点绑扎固定一根,并即时由专人装挂标志牌。标志牌的装设应符合下列要

40、求:在电缆两端、电缆接头、拐弯处、隧道及竖井两端等地方应装挂电缆标志牌。标志牌的内容如上图所示,若无设计编号时,应详细标明电缆规格、型号及起迄地点;并联使用的电缆应有顺序编号;标志牌的字迹应清晰不易脱落。标志牌应统一、防腐,装挂牢靠。电缆最大牵引强度(N/2)如下表:牵引方式牵引头钢丝网套受力部位铜芯铝芯铅套铝套塑料护套允许牵引强度704010407电缆各支持点间的距离应符合设计规定。当设计无规定时,不应大于下表数据电缆种类敷设方式水平垂直电力电缆 全塑型4001000 除全塑型外的中低压电缆8001500 35KV及以上高压电缆15002000控制电缆8001000电缆最小弯曲半径应符合下表

41、规定:电缆型式多芯单芯控制电缆10D橡皮绝缘电力电缆无铅包、钢铠护套10D裸铅包护套15D钢铠护套20D聚氯乙烯绝缘电力电缆10D交联乙烯绝缘电力电缆15D20D油浸纸绝缘电力电缆铅包30D铅包有铠装15D20D无铠装20D自容式充油(铅包)电缆20D 注:表中D为电缆外径电缆要穿管时,应检查管内有无积水、杂物;穿管过程中,不得损伤电缆外护层,必要时,可以借助于无腐蚀性的润滑剂(粉)配合穿管。一般一根管子只能穿一根动力电缆,最多不超过三根控制电缆。注意:交流单芯电缆不得单独穿入钢管内。保护管埋入非混凝土地面的深度不应小于100,伸出建筑物散水坡的长度不应小于250,保护罩根部不应高出地面。敷设

42、在支、桥架上的电缆,按由上至下的排列顺序分别敷设6KV动力电缆、380V动力电缆、直流电缆和控制电缆。每根电缆须单独绑扎,每敷设一根电缆,须在绑扎固定之后,并且在电缆始末两端与电缆接头附近都留有适当的备用长度才能剪断。在整个电缆敷设过程中,要有强烈的成品保护意识,以免损坏电缆沟道防水层及已敷设好的电缆等。并做好施工记录(施工记录包括:电缆敷设原始清单、敷设路径及敷设时间、中间接头、电缆代用等)。电缆的排列应符合下列要求:(1)电力电缆和控制电缆不应配置在同一层支架上。(2)高低压电力电缆,强电、弱电控制电缆应按顺序分层配置,一般情况宜由上而下配置;但在含有35KV以上高压电缆引入盘柜时,为满足

43、弯曲半径要求,可由下而上配置。并列敷设的电力电缆,其相互间的净距应符合设计要求。电缆在支架上敷设应符合下列要求:(1)控制电缆在普通支架上,不宜超过1层;桥架上不宜超过3层。(2)交流三芯电力电缆,在普通支架上不宜超过1层;(3)交流单芯电力电缆,应布置在同侧支架上。当按紧贴的正三角形排列时,应每隔1m用扎带绑牢。电缆与热力管道、热力设备之间的净距,平行时不应小于1m,交叉时不应小于0.5m,当受条件限制时,应采取隔热保护措施。电缆通道应避开锅炉的看火孔和制粉系统的防爆门;当受条件限制时,应采取穿管或封闭槽盒等隔热防火措施。电缆不宜平行敷设于热力设备和热力管道上部。明敷在室内及电缆沟、隧道、竖

44、井内带有麻护层的电缆,应剥除麻护层,并对其铠装加以防腐。电缆敷设完毕后,应及时清楚杂物,盖好盖板。必要时,应将盖板缝隙密封。电缆与铁路、公路、厂区道路交叉时,应敷设于坚固的保护管或隧道内。电缆管的两端宜伸出道路路基两边各2M;伸出排水沟0.5M。直埋电缆的上、下部应铺以不小于100的软土或沙层,并加盖保护板,其覆盖宽度应超过电缆两侧各50,保护板可采用混凝土盖板或砖块(软土和沙子中不应有石块和其他硬质杂物)直埋电缆在直线段每隔50100M处、电缆接头处、转弯处、进入建筑物等处,应设置明显的方位标志或标桩。直埋电缆回填土前,应经隐蔽工程验收合格。电缆之间,电缆与其他管道、道路、建筑物等之间平行和

45、交叉时的最小净距应符合要求。特殊情况下应按下列规定执行:(1)电力电缆间及其与控制电缆间或不同使用部门的电缆间,当电缆穿管或用隔板隔开时,平行间距可降低为0.1M。(2)电力电缆间、控制电缆间以及它们相互之间,不同使用部门的电缆间在交叉点前后1M范围内,当电缆穿入管中或用隔板隔开时,其交叉净距可降为0.25M。 电缆之间,电缆与管道、道路、建筑物之间平行和交叉时的最小净距(M)项 目最小净距平行交叉电力电缆间及其与控制电缆间10KV及以下0.100.5010KV以上0.250.50控制电缆间0.50不同使用部门的电缆0.500.50热管道(管沟)及热力设备2.000.50油管道(管沟)1.000.50可燃气体及易燃液体管道(管沟)1.000.50其他管道(管沟)0.500.50铁路路轨3.001.00电气化铁路路轨交流3.001.00直流10.01.00公路1.501.00城市街道路面1.000.70杆基础(边线)1.00建筑物基础(边线)0.60排水沟1.000.50电缆与热管道(沟)及热力设备平行、交叉时,

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1