cb成都地铁7号线5标出入段线站生产安全事故总体应急预案.doc

上传人:本田雅阁 文档编号:2367433 上传时间:2019-03-24 格式:DOC 页数:161 大小:775.01KB
返回 下载 相关 举报
cb成都地铁7号线5标出入段线站生产安全事故总体应急预案.doc_第1页
第1页 / 共161页
cb成都地铁7号线5标出入段线站生产安全事故总体应急预案.doc_第2页
第2页 / 共161页
cb成都地铁7号线5标出入段线站生产安全事故总体应急预案.doc_第3页
第3页 / 共161页
cb成都地铁7号线5标出入段线站生产安全事故总体应急预案.doc_第4页
第4页 / 共161页
cb成都地铁7号线5标出入段线站生产安全事故总体应急预案.doc_第5页
第5页 / 共161页
点击查看更多>>
资源描述

《cb成都地铁7号线5标出入段线站生产安全事故总体应急预案.doc》由会员分享,可在线阅读,更多相关《cb成都地铁7号线5标出入段线站生产安全事故总体应急预案.doc(161页珍藏版)》请在三一文库上搜索。

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease . 成都地铁7号线5标出入段线站 生产安全事故总体应急预案狮子山站生产安全事故总体应急预案 编制: 审核: 审定: 中铁九局集团有限公司7号线5

24、标出入段线项目部2013年4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy applic

25、ation shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pages.

26、4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 20021980) rules of the Nineth,

27、 tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%, othe

28、rwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the end, contro

29、lled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for the

30、 management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agent

31、s service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tenderi

32、ng agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents and solicitation

33、documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of various supp

34、orting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to pro

35、vide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent . 中铁九局集团有限公司 成都地铁7号线5标川师车辆段出入段线及明挖区间 生产安全事故总体应急预案目录第一章 总 则1第二章 生产区域的危险性分析3第三章 事故应急救援的组织机构4第四章 预防与预警8第五章 应急响应11第六章 后期处置15第七章 事故报告及应急救援通信联系16第八章 保障措施16第九

36、章 培训与演练18第十章 相关应急预案的衔接关系18第十一章 应急预案管理的措施和要求18第十二章 奖 惩20第十三章 附 则20附件1:生产安全事故快报22附件2:突发事件(故)报告程序图23附件3:项目部联系电话24附件4:突发事件及应急响应程序25附件5:对外联系方式26附件6:基坑坍塌事故专项应急预案26附件7:脚手架倒塌事故专项应急预案40附件8:高处坠落事故应急救援处置预案55附件9:模板坍塌事故应急救援处置预案71 中铁九局集团有限公司 附件10:压力容器爆炸事故应急救援处置预案88附件11:触电事故应急救援处置预案104附件12:防洪防汛应急救援预案120附件13:施工现场防火

37、应急救援预案132附件14:物体打击应急救援预案147 中铁九局集团有限公司 成都地铁七号线出入段线站生产安全事故总体应急预案第一章 总 则1.1 编制目的为规范项目部应急管理工作,提高项目部应对风险和防范事故的能力,及时妥善地处理好各类事故或突发事件,确保公共安全和员工健康,最大限度地减少事故损失、环境损害和社会影响。依据国家法律法规,按照上级有关文件要求,结合项目部施工生产实际,特制定本预案。1.2 编制依据 本预案依据中华人民共和国行业标准AQ/T9002-2006生产经营单位安全生产事故应急预案编制导则、安全生产法、建设工程安全管理条例、国务院第493号文生产安全事故报告和调查处理条例

38、、国家安全生产监督管理总局第21号令生产安全事故信息报告和处置办法的要求和成都地铁公司276号事故报告调查处理规则文件要求等法律法规、规章及有关行业管理规定、技术规范和标准编写。1.3 适用范围 1)本预案适用于项目部生产经营管辖地范围内发生的下列安全事故的抢险救援工作:(1)人身伤亡事故;(2)急性中毒事故;(3)民用爆炸物品和危险化学品事故;(4)锅炉、压力容器、压力管道和特种设备事故;(5)火灾事故;(6)其他生产安全事故。2)事故等级界定(1)特别重大事故,是指造成30人以上死亡,或者100人以上重伤,或者1亿元以上直接经济损失的事故;(2)重大事故,是指造成10人以上30人以下死亡,

39、或者50人以上100人以下重伤,或者5000万元以上1亿元以下直接经济损失的事故;(3)较大事故,是指造成3人以上10人以下死亡,或者10人以上50人以下重伤,或者1000万元以上5000万元以下直接经济损失的事故;(4)一般事故,是指造成3人以下死亡,或者10人以下重伤,或者1000万元以下直接经济损失的事故。(5)险性事件,是指造成3人以下重伤或5人以上轻伤,直接经济损失30万元以上100万元以下。(6)造成3人以上5人以下轻伤,直接经济损失10万元以上30万元以下。(7)事件苗头直接经济损失1万元以上10万元以下。1.4 应急预案体系组成一、应急预案体系组成图项目部总体应急预案专项应急预

40、案坍塌、水灾、触电、物体打击、高空坠落、燃烧和爆炸、火灾、爆炸等应急预案1.5 应急预案处置方针与、原则和目标1)应急预案处置方针预防为主,常备不懈,反应及时,将损失减小到最低程度。2)应急预案处置原则坚持“以人为本、安全第一、统一领导、分级负责、属地为主、分级管理、预防为主、平战结合”的原则,并同成都市人民政府和相关部门应急预案相衔接。当发现事故征兆或事故后,以最快捷的方式对事故中伤者进行救治和安置,确保救援人员不再受到伤害,减小事故损失和最大限度地降低社会影响。(1)以人为本、安全第一。把保障企业员工、人民群众的生命安全和身体健康,最大程度地预防和减少安全生产事故灾难造成的人员伤亡作为首要

41、任务。切实加强应急救援人员的安全防护,充分发挥人的主观能动性,充分利用专业救援力量的骨干作用,充分发挥企业自身应急救援队伍的基础作用。(2)统一领导,分级负责。在成都地铁公司质安部统一领导和中铁九局四公司安委会组织协调下,项目部按照各自职责和权限,负责有关安全生产事故的应急管理和应急处置工作。认真履行安全生产责任主体的职责,建立生产安全事故应急预案和应急机制。 (3)属地为主,分级管理。生产安全事故现场应急处置的领导和指挥以地方人民政府为主,项目部应当与成都市人民政府密切配合,充分发挥指导和协调作用。(4)预防为主,平战结合。贯彻落实“安全第一,预防为主,综合治理”的安全方针,坚持事故灾难应急

42、与预防工作相结合。做好预防、预测、预警和预报工作,做好常态下的风险评估、物资储备、队伍建设、完善装备、预案演练等工作。3)应急预案处置目的提高项目部施工管理和作业人员在施工生产过程中和日常生活中对突发事件的应变能力,尽快控制事态,尽量减少损失,尽早恢复施工生产秩序。第二章 生产区域的危险性分析2.1 项目概况 川师车辆段明挖区间及盾构井位于成都市锦江区金像寺村,成龙路西侧、机场路东延线北侧,川师附属中学西面,施工范围内多为拆迁区及菜地,无地下管线。东接川师站川师车辆段盾构区间,西接川师车辆段出入段线,起止里程为YDK16+565.081YDK16+818.410。明挖区间及盾构井全长254.5

43、m,其中盾构井为两层两跨框架结构,区间为单层两跨框架结构。川师车辆段出入段线位于成都市锦江区范围内,主要沿晨辉东路、金苹果幼儿园绿地、拆迁区下方敷设。西侧为晨辉北路与晨辉东路交叉路口,北侧为成都七中嘉祥外国语学校及金苹果爱弥尔幼稚园及部分拆迁区,南侧为金象嘉园及育才晓筑住宅楼及成功红树林施工区,东端为拆迁区。出入段线明挖区间东接车辆段咽喉区明挖区间,西接琉璃场站,琉璃厂站端接地下负二层,车辆段端接地下负一层。起止里程为YCK16+818.410YCK17+358.700。出入段线结构形式为地下两层框架结构,在正线里程ZCK16+817.239ZCK17+050.315、YCK16+818.41

44、0YDK17+050.233段,正线、出入段线、试车线、牵出线五线并行,其中,出入段线、试车线、牵出线在上,正线隧道在下,线路主要沿拆迁区及金苹果爱弥尔幼稚园操场及绿地下方敷设;在正线里程ZCK17+050.315ZCK17+358.785、YCK17+050.233YCK17+358.700段,出入段线在平面上位于正线左、右线之间,区间断面上三线由“品字形”逐渐转化到同一标高,线路主要沿晨辉东路及金苹果幼儿园绿地下方敷设。2.2 事故可能发生的地点和可能造成的后果1)生产自然环境生产自然环境:项目所处在的是成都市城市道路上及地下施工。2)生活自然环境生活驻地是在成都市繁华的城中。第三章 事故

45、应急救援的组织机构及其组成单位、组成人员、职责分工3.1 事故应急救援组成单位及配合与协调1)事故应急救援组成单位(1)项目部工程、安质环保、物资设备、计划合同、财务、办公室等部门。(1)成都市沙河堡医院等机构,成都市政府应急救援组织。2)事故应急救援配合与协调原则事故应急处置预案领导小组按照分级负责的原则,由项目部、协作单位两级单位组成,分别协调本单位相关应急处置预案工作。3.2 项目组织协调职责1)需要相邻单位配合时,由项目部配合协作单位负责与建设单位联系协调相关事宜;2)项目部与九局其他公司之间需要配合时,由公司负责组织与协调;3)项目部之间需要配合时,也可由公司组织协调。3.3 项目部组织协调1)项目部负责组织应急处置预案的事故,由项目部自行组织应急处置预案协调;2)项目部需要其它单位配