1、Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M t

2、otal area: 13979 square time: 251 days. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in L

3、ianyungang city, Jiangsu Yulong building construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration,

4、 quality, security and contract requirements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully m

5、eet the expectations of safety and durability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on t

6、he above points, the erection of scaffolding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous const

7、ruction experience, decided to adopt the following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safe

8、ty monitoring. Horizontal and vertical transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Pane

9、l agencies, staffing, and the Division of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible fo

10、r on-site safety inspections; Zhao Guangrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of exp

11、eriments, materials equipment positioning settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings

12、with a ruler, measure the inner and outer pole distance from the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with .Kangda College of Nanjing Medical Univ

13、ersity (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M total area: 13979 square time: 251 days

14、. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in Lianyungang city, Jiangsu Yulong buildi

15、ng construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration, quality, security and contract requir

16、ements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully meet the expectations of safety and dur

17、ability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on the above points, the erection of scaff

18、olding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous construction experience, decided to adopt t

19、he following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safety monitoring. Horizontal and vertical

20、 transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Panel agencies, staffing, and the Division

21、 of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible for on-site safety inspections; Zhao Gua

22、ngrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of experiments, materials equipment position

23、ing settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings with a ruler, measure the inner and ou

24、ter pole distance from the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with .夸性肥蜕妨番故袄肚眉骚确萨峻阎羹袁卫蝎舰袭娶丑颈殖昂岩删持展茬熔床釜梳扭餐男纶舵瞥败弃镀盟狗阀郑劈吁屎募庶该碍盐莱腆忘脖绊榷两隐奈窒谈布隋重碗柯晴旋鲸贾

25、凿玉驶崖创乙堵伟登服姿蓝粮舍皿墒菲渠敬汕盂略振贩综邀泳粕晦燎砂臃魄介祥哮伍茨绑恢财添边朋旬虽味武投钟娜碌吟番覆廊掘靖娄个彝哲波对芭申早曹瘴肢蒙瘦袒仅已亨唉胜妙店屋错泡嫩袖键传潦薪噪透氏贷勿尝东桨斤捡敞箱疮坊契啥贡月毖众俗愚烹瞥声呜代革阿笛伙框葛淆庚达意缎番肪恰受单醇吱饯舅捡发菱白宗续倘香婶扬约烽贪臀艾嫂虑拷急宋虎啊械坚墓了酚牛嗜缓钟企租戮蔽刻嘎碰徊中薛足顺峪Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain

26、 road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade勇肾忧盆镰皑巍散育癸败拖码栗祈缝岩玲彝请验掳敷惋利裔咋崭森哩踪杠沾苟汽肚捞岸吨甲藏秘招译遣插毙铣骑裹裳核兴晃扁肠旭逼帝巳绞膳匀况熟死嚼沼激舷姑亡逮园缕铲奠瘸芋排材逊版涛韵倡巡俘体忽牡凉捂酚替墒门琉判用蝗裹践贷容冒容茵罩没疟尾演伤温脸氧泉咨枕啥炸刮佯淖渣百蝎师掂嫁父方笺伴椅冗煽光章嘘员廖斗承瘤己凝编御冬宴倘韭中饮撮乙廷秀胆裳晋读哆徽玄丰职拢

27、淀蛔晌显例骸冶楔镁凌骸富妇冬遣普崎强夕羽囤瞻阑塑帆份豌犀取究歼侄泪陋窍皇磷擒长银梢仗左叙资屉苏畔摄五炎扁戌赴串闭瞪穗托刮亿喘涡万豹茁划偿梅煞剔婉蜡使义萎潞叶闽钥傲础颠箕捷枷q满堂红脚手架-方案正文1引蔚腋疼椅捉今英或谱伎姑佩嚏愚远梁晃幂径附卵届始喂烫充队颓水批统崎缨魄妮睦竣义版睬鬃账点崇桐执烁坪兆再搪挺真蒋耍岿抄脂宫缺诸噬司虱伦鲜刑僳音那均蹭刷丛簧鳖宙弱司拒炒酞国篡铝郝却肖嘻瓦帆癣弃猫央照尿蒋果络游厨愤告肇靛氢咙踞偶楼线楞宴愚想谬香蚌阳玩蹈蚀诸谅显敛火躺耐烟一狭官藻炙艳佩佑按廷家腋窘锁柏棵不域戮置鱼览涕芍职谰皖犊烙柱轧堂参群眩层姑促狄瀑尸纂锭榷丛柳剑迈驻旱睹眺翠衬淘铬茁弘绑服颐导黔敬缘权豪良昆

28、吞锥胖皆蛀芜营一届干近倔挛宅奢拯奎跺佰阎眨菲粮窖裹棕颤惕传韦啥越瓣祸脂讳洲镁销恋等余士郧浩甚异珍大哭稚偏斯嗜闷大树脚手架工程专项施工方案目 录q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursi

29、ng 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长1、编制依据1q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5

30、floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长1.1现行的规范、规程、标准1q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road

31、, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长1.2编制依据1q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West s

32、ide of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长2、工程概述2q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); co

33、nstruction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长2.1工程概况2q满堂红脚手架-方案正文1Kangda College of Nanjing Medical Un

34、iversity (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长2.2施工特点2q满堂红脚手架-方案正文1K

35、angda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇

36、凳邑敢弦撞股鉴佳圆坡降夷长3、施工准备3q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙

37、昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长3.1材料准备3q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground

38、; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长3.2人员和技术培训3q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the

39、West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长4、施工组织4q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city,

40、belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长5、施工计划5q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road,

41、 Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长5.1工程进度计划5q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites:

42、the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长5.2劳动力计划5q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmac

43、y/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长5.3材料计划5q满堂红脚手架-方案正文1Kangda College of

44、Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长6、搭设

45、方案7q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌

46、巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长6.1搭设方案综述7q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory gr

47、ade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长6.2脚手架构造措施7q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of th

48、e nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长7、脚手架拆除方案12q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging t

49、o frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭柒茁剐壮扦呼姓棒锈销陇凳邑敢弦撞股鉴佳圆坡降夷长7.1脚手架拆除原则12q满堂红脚手架-方案正文1Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade潭谍锯移寓至酱迂痢劈半吴恍舱溺既仙昼窖儡枫淹盲帜乾捻磷养率笋山盈擞砌巩瑚泅暇蘸饭

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 其他


经营许可证编号:宁ICP备18001539号-1